Statement of Work Summary

This is a Statement of Work (SOW) for Solicitation No. 140PP27Q0015, detailing emergency vehicle equipment installation, decommissioning, and maintenance services for three National Park Service (NPS) sites: Whiskey Town National Recreation Area (WHIS) in Shasta County, California; Lava Beds National Monument (LABE) in Siskiyou County, California; and Lassen Volcanic National Park (LAVO) in Shasta County, California. The contract is an Indefinite Quantity/Indefinite Delivery (IDIQ) vehicle with a five-year period of performance spanning January 1, 2027, through December 31, 2031. The contractor will work on Ford, Chevrolet, and Dodge pickup trucks, Dodge Durango sport utility vehicles (SUVs), and Chevrolet Tahoe SUVs. The scope includes installation of aftermarket emergency equipment such as light bars, push bumpers, gun mounts, radar systems, sirens, prisoner cages, radio equipment, and vehicle striping and markings, but excludes scheduled or unscheduled mechanical maintenance, tire work, or factory component repairs.

The contractor must complete equipment installations within 14 business days of vehicle receipt and equipment decommissioning within 14 business days, with smaller maintenance projects completed within 7 business days and larger ones within 14 business days. The contractor is responsible for responding to Contracting Officer's Representative (COR) maintenance requests within 48 hours and must maintain a shop location within 50 miles of all three sites or provide mobile on-site service. If the contractor's facility is over 50 miles away, the contractor must provide vehicle pickup and transport or mobile installation at each site. Equipment will be either government-furnished/contractor-installed or contractor-furnished/installed from reputable manufacturers and invoiced accordingly. The contractor shall provide a one-year warranty on all labor and must demonstrate full equipment functionality upon completion. Payment is made upon task order completion via IPP with vendor invoices and supporting documentation. Vehicle graphics must be sourced from 8six8one Designs. The point of contact for all three sites is Gary Bias, Law Enforcement Ranger at WHIS, reachable at Gary_Bias@nps.gov or 530-917-4558.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation no. 140PP27Q0015, Attachment 4 – Statement of Work (11/17/26)

Outfitting Vehicles (commissioning/decommissioning) for three NPS sites, WHIS, LABE, LAVO

STATEMENT OF WORK

Emergency vehicle equipment installation, decommission and maintenance to include Ford, Chevrolet, Dodge Pickups SSV’s, Dodge Durango’s SSV’s and Chevrolet Tahoe’s SSV’s for:

Whiskey Town National Recreation Area (WHIS), Shasta County, CA

Lava Beds National Monument (LABE), Siskiyou County, CA

Lassen Volcanic National Park (LAVO), Shasta County, CA

SCOPE

The Contractor will address only the installation, decommissioning, and maintenance of the aftermarket emergency equipment for WHIS, LABE, and LAVO law enforcement vehicles, such as light bars, push bumpers, gun mounts, radar and other related after-market emergency equipment. This contract does not include scheduled or unscheduled mechanical maintenance of the vehicles or their factory components, or tire maintenance, repair or exchange.

OBJECTIVE

WHIS, LABE, and LAVO requires a qualified vendor to install and maintain emergency equipment in the NPS’s fleet of emergency vehicles and uninstall/decommission emergency equipment and markings from retiring emergency vehicles.

DELIVERY OF VEHICLES: The vehicles will be shuttled to/from the Contractor’s facility by NPS staff if contractors’ facility is 50 miles or less travel distance from each location. If contractor’s facility is over 50 miles travel distance the Contractor will have to provide pickup and transport of vehicles to and from their facility or provide mobile on-site vehicle upfitting at each site (WHIS, LABE, LAVO).

Headquarters Addresses:

Whiskeytown National Recreation Area (WHIS) 14412 Kennedy Memorial Drive, Whiskeytown, CA 96095 Shasta County, CA

Lava Beds National Monument (LABE) 1 Indian Wells Hqts., Tulelake, CA 96134 Siskiyou County, CA

Lassen Volcanic National Park (LAVO) 38050 Highway 36 East, Mineral, CA 96063 Shasta County, CA

Point of Contact for all three sites:

Gary Bias, Law Enforcement Ranger, WHIS Email: Gary_Bias@nps.gov Office/Mobile Phone:: 530-917-4558 mailto:Gary_Bias@nps.gov

SUMMARY OF WORK: The Contractor shall provide all equipment, labor, and supplies from reputable manufacturers, unless otherwise noted, to successfully complete the work resulting in fully functional turn-key law enforcement patrol vehicles and/or fire apparatus vehicles. Due to the diverse nature of the fleet and its unusually broad deployment in all manners of emergency incidents, installation of the equipment requires a broad knowledge of emergency vehicles and their functions, typical use, specifications, and particular requirements.

Installation standards shall meet identified policy regulations, current industry standards and standard operating procedures of NPS equipment, striping and other identified sources as written in Reference Manual 9 (RM-9), Chapter 34 Law Enforcement Vehicles and Memo dated July 13, 2015, regarding updated vehicle markings and graphics. Policy regulations, industry standards and operating procedures are subject to change, which may require modification changes/upgrades to our current vehicle fleet or future vehicle outfitting to make it more effective to meeting the mission. The RM-9 is available as a downloadable PDF via this link: 2015 RM-9 (or copy/paste:

https://www.nps.gov/aboutus/foia/upload/RM-9-redacted-V-2.pdf)

A. Equipment Installation The Contractor’s completion of an awarded task order should be within 14 business days of receipt of the Vehicle. The contractor will notify the Contracting Officer’s Representative (COR) if these conditions cannot be met. Prioritization may dictate more urgent timeframes or may provide for more flexibility as designated by the COR. Equipment for installations will be provided by NPS-WHIS, LABE, LAVO (Government Furnished/Contractor Installed) or if new equipment is needed it will be ordered/provided by the contractor (Contractor Furnished/Installed) from a reputable manufacturer and invoiced.

DESCRIPTION OF WORK:

The work will either consist of outfitting a marked patrol vehicle, outfitting an unmarked patrol vehicle and/or outfitting a fire apparatus vehicle. Some vehicles come with pre-installed law enforcement equipment/emergency response-fire equipment or no pre-installed equipment depending on what is available. Make / model of vehicle will not be known until delivered by GSA, minimizing notification lead time to contractor.

GOVERNMENT-FURNISHED/CONTRACTOR-INSTALLED EQUIPMENT:

The Contractor shall install government-furnished equipment. The Contractor shall verify dimensions, capabilities, and compatibilities of government-furnished equipment. If an item cannot be used, the

Contractor shall contact the CO prior to purchasing replacements from a reputable manufacturing company to get approval. The scope of this is dependent on the extent GSA outfits the vehicles before arriving to receiving location.

☐Whiskeytown National Recreation Area

☐Lava Beds National Monument

☐Lassen Volcanic National Park

The following items will be performed on each vehicle type:

General

☐ Install vehicle power wiring harness https://www.nps.gov/aboutus/foia/upload/RM-9-redacted-V-2.pdf

☐ Mount red/white interior dome light and connect associated wiring

☐ Mount Fire Extinguisher and rescue hammer

☐ Install exterior decals, emblems, vehicle number decals

☐ NPS Striping Package

☐ Vehicle Number Decals: _________

☐ Emblems: ________

☐ Assemble and install cargo equipment

☐ Pickup bed topper

☐ Cargo box

☐ Slide out cargo box

☐ Radio tray

☐ Assemble and install control console

☐ Assemble and install console mounting hardware

☐ Test and confirm all equipment functionality

☐ Mount portable radio battery charger and connect associated wiring

☐ Mount flashlight holder and connect associated wiring

Lights

☐ Mount additional Lighting equipment (e.g., headlight flashers, front and rear corner, grill, side window, side view mirrors, hatch and cargo lights) and connect associated wiring

☐ Mount traffic advisor/direction and connect associated wiring

☐ Program and mount light bar and connect associated wiring

☐ Interior “slicktop” light bar

☐ Exterior light bar

☐ Mount siren and connect associated wiring including siren park‐kill module

☐ Mount PA/siren speaker, and connect associated wiring

Telephony / IT

☐ Mount external radio antenna and connect associated cable

☐ Mount radio unit and speaker and connect associated wiring

☐ Mount radio repeater system and connect associated wiring

☐ Assemble, install, and mount Starlink system and associated wiring

☐ Assemble and install computer mount to fit/support tablet for Axon camera install

Police Equipment

☐ Assemble and mount long gun rack vertically between front seats and connect associated wiring

☐ Install front and rear prisoner cage partitions

☐ ½ cage

☐ Full cage

☐ Install prisoner seat and restraints

☐ Install window barriers for prisoner cage

☐ Mount push bumper and connect associated wiring

☐ Mount radar control box, display, antenna, and associated wiring

CONTRACTOR FURNISHED & INSTALLED EQUIPMENT:

The Contractor is responsible for the verification of all quantities, dimensions, capabilities, and compatibilities affecting the work of this contract before ordering products from reputable manufacturing companies and shall purchase and install needed equipment. The scope of this is dependent on the extent GSA outfits the vehicles before arriving to receiving location.

☐Whiskeytown National Recreation Area (WHIS)

☐Lava Beds National Monument (LABE)

☐Lassen Volcanic National Park (LAVO)

The following items will be performed on each vehicle type:

☐ Purchase all checked equipment to include center console, control console, computer mount, lightbar, spotlights, grill lights, side window lights, side mirror lights, PA/siren, interior speaker, front/rear cages, window barriers, antennas, push bumpers

☐ Purchase new wiring harnesses, fuses, circuit breakers, brackets, and associated materials for all electronic wiring as necessary for functionality. Wire loom shall cover all exposed wiring or wiring in areas that may get damaged.

☐ Purchase all mounts, hardware, brackets and software as necessary for functionality.

General

☐ Install vehicle power wiring harness

☐ Mount red/white interior dome light and connect associated wiring

☐ Mount Fire Extinguisher and rescue hammer

☐ Install exterior decals, emblems, vehicle number decals

☐ NPS Striping Package

☐ Vehicle Number Decals: _________

☐ Emblems: ________

☐ Assemble and install cargo equipment

☐ Pickup bed topper

☐ Cargo box

☐ Slide out cargo box

☐ Radio tray

☐ Assemble and install control console

☐ Assemble and install console mounting hardware

☐ Test and confirm all equipment functionality

☐ Mount portable radio battery charger and connect associated wiring

☐ Mount flashlight holder and connect associated wiring

Lights

☐ Mount additional Lighting equipment (e.g., headlight flashers, front and rear corner, grill, side window, side view mirrors, hatch and cargo lights) and connect associated wiring

☐ Mount traffic advisor/direction and connect associated wiring

☐ Program and mount light bar and connect associated wiring

☐ Interior “slicktop” light bar

☐ Exterior light bar

☐ Mount siren and connect associated wiring including siren park‐kill module

☐ Mount PA/siren speaker, and connect associated wiring

Telephony / IT

☐ Mount external radio antenna and connect associated cable

☐ Mount radio unit and speaker and connect associated wiring

☐ Mount radio repeater system and connect associated wiring

☐ Assemble, install, and mount Starlink system and associated wiring

☐ Assemble and install computer mount to fit/support tablet for Axon camera install

Police Equipment

☐ Assemble and mount long gun rack vertically between front seats and connect associated wiring

☐ Install front and rear prisoner cage partitions

☐ ½ cage

☐ Full cage

☐ Install prisoner seat and restraints

☐ Install window barriers for prisoner cage

☐ Mount push bumper and connect associated wiring

☐ Mount radar control box, display, antenna, and associated wiring

The Contractor shall purchase and install the following vehicle graphic items from 8six8one Designs.

https://www.8681designs.com/graphicsstore

(415) 233-1128

B. Equipment Decommission Emergency Equipment decommissioning varies based on make and model of vehicle. The Contractor’s completion of an assigned project should be within 14 business days. The contractor will notify the COR if these conditions cannot be met. Prioritization may dictate more urgent timeframes or may provide for more flexibility as designated by the COR.

The vehicle is retired and restored to its factory base specifications. Equipment shall be removed in a way that allows it to be reused, when possible. Emergency equipment removed from retired vehicles shall be returned to the park site from which the vehicle originated. Unless otherwise advised by NPS, A‐ post spotlights are factory equipment and shall not be removed from retired vehicles.

☐Whiskeytown National Recreation Area (WHIS)

☐Lava Beds National Monument (LABE)

☐Lassen Volcanic National Park (LAVO)

The following items will be performed on each vehicle type https://www.8681designs.com/graphicsstore

General

☐ Remove control console and mounting hardware

☐ Remove map light and associated wiring

☐ Remove all striping, emblems, stickers, vehicle number

☐ Striped vehicle

☐ Unstriped vehicle

☐ Patch all holes in the vehicle roof

☐ Reinstall available factory components which may have been removed during original emergency installation

☐ Remove portable radio battery charger and associated wiring

☐ Remove flashlight holder and associated wiring

☐ Remove fire extinguisher and rescue hammer

☐ Remove cargo equipment

☐ Pickup bed topper

☐ Cargo box

☐ Slide out cargo box

☐ Radio tray

☐ Fill all external vehicle holes that were made as part of the installation process to include vehicle roofs and trunks.

☐ Clean interior and exterior of vehicle

☐ Complete vehicle punch list

Lighting

☐ Remove light bar and associated wiring

☐ Internal

☐ External

☐ Remove traffic advisor and associated wiring

☐ Remove and return to factory functionality front wigwags, rear flashers, front strobes

☐ Remove aftermarket (after-GSA) Lighting equipment (e.g., headlight flashers, front and rear corner, grill, side window, side view mirrors, hatch and cargo lights) and associated wiring

☐ Remove siren and associated wiring including siren park‐kill module

Telephony / IT

☐ Remove PA speaker, siren, and associated wiring

☐ Remove external radio antenna and associated cable

☐ Remove radio unit and speaker and connect associated wiring

☐ Remove radio repeater system and connect associated wiring

☐ Remove Starlink system and associated wiring

☐ Remove computer mount to fit/support tablet for Axon camera install

Police Equipment

☐ Remove push bumper

☐ Remove long gun rack mounted vertically between front seats and associated wiring

☐ Remove front and rear cage partitions

☐ Remove radar control box, display, antenna, and associated wiring

C. Maintenance/Modification

• The fleet to be maintained is comprised of varying types of emergency vehicles such as marked emergency vehicles, unmarked emergency vehicles and/or fire apparatus vehicles.

• Work will include and is not limited to maintenance/modification of after‐market equipment components on WHIS, LABE, and LAVO fleet.

• Tasks might include maintenance/modification of electrical and mechanical equipment such as wiring, lightbars, push bumpers and other after‐market equipment maintenance as assigned.

• The contractor’s availability during normal business hours should be flexible to respond to requests

• for minor repairs of emergency equipment.

• The contractor is expected to respond to the Contracting Officer’s Representative’s (COR) request for maintenance within 48 hours

• The Contractor’s completion of an awarded task order should be within 7 business days of receipt of the vehicle for small projects, and within 14 business days for larger projects. The contractor will notify the COR if these conditions cannot be met. Prioritization may dictate more urgent timeframes or may provide for more flexibility as designated by the COR.

• Vehicles requiring maintenance/modification will be scheduled by the COR.

• The COR may designate a subject matter expert to discuss technical details relevant to the

• necessitated maintenance, however all required work assignments will come through the

• designated COR.

Contractor Furnished Equipment and Property The Contractor shall supply all required tools, supplies and equipment necessary from reputable manufacturing companies to perform assigned installation and maintenance.

Prework Meeting A prework meeting shall be held within five business days after initial Indefinite Quantity/Indefinite Delivery (IDIQ) contract award, prior to the beginning of work for any awarded task order under the IDIQ. It shall be organized by the contractor at a time agreed upon by the contractor and the COR. The purpose of the meeting will be to review the contract and discuss how competitive task orders will work, invoice process, any logistical/transportation questions, etc.

Performance Standards According to the Inspection of Services clause, Federal Acquisition Regulation (FAR) 52.246‐4, the Government will evaluate the contractor's performance under this contract. The Contractor shall demonstrate full functionality of all equipment upon completion of vehicle. Equipment will be tested to ensure proper workmanship prior to final acceptance of vehicle by NPS. The appointed CORs (one for each park site) will be responsible for government inspection and acceptance and review and acceptance of invoices for task orders.

Contractor Employees The contractor shall provide qualified individuals who possess the skills, knowledge, and training to perform the services required by this contract, specifically, for the types of tasks outlined above in this Statement of Work. The contractor is responsible for delivering services in conformance to the contract.

The Government inspects tendered services and either accepts or rejects services based on the terms and conditions of the contract. In performing the vital roles, the contractor will jointly plan and coordinate work and associated deliverables, timelines, and deadlines with the COR, and other members as designated by the Contracting Officer to establish standards and expectations of the Contractor’s efforts.

Competency The Contractor shall have the technical knowledge, skills, and abilities required to successfully maintain all emergency equipment in such a manner that it functions as intended. Equipment is often mechanically complex, as in the case of console or push bumper maintenance; equipment is also often electronically complex, as in the case of control consoles. Successful maintenance work will therefore require extensive knowledge of mechanical, electric, electronic, radio, and radio microwave systems.

Contractor shall also have metalworking skills, as on‐site fabrication or alteration of parts is often necessary to effect periodic maintenance. Unusually complex requirements are common with the NPS patrol vehicles since they are deployed not only as police vehicles, but also in response to medical, search and rescue, and fire emergencies, and must be capable of interoperability across all emergency response discipline boundaries.

Flexibility Due to the variety of possible vehicles being procured through GSA the contractor should be expected a and capable in outfitting a wide range of SSV’s vehicles

Availability WHIS, LABE, and LAVO do not keep any vehicles in reserve in case of equipment breakdown, it is vitally important that the contractor be readily available to respond and perform maintenance work on equipment. Work must be performed within the measurable and established response and completion timeframes. Due to the unpredictable and ongoing nature of maintenance problems which may arise at any time, the contractor shall be available year‐round to perform work at the work site(Ranger Office/Fire Station) or off site if the situation dictates the vehicle be moved to another location for maintenance. Location of contractor’s shop will be no greater than 50 miles from any of the three sites (WHIS, LABE, LAVO) or have a mobile service that is available to complete projects within the 7- or 14-day timeframe listed above under maintenance.

Safety and Security The Contractor shall put in place safety measures to reduce the risk of illness or injuries obtained in the performance of work. Shall accidents or injuries arise either to a person or property, the Contractor is to notify the COR immediately via email and phone and cooperate fully in any investigation as necessary.

The contractor may be in possession of one or more emergency vehicles, including law enforcement vehicles. All firearms and Government deemed sensitive equipment will be removed from the vehicles and secured prior to the contractor performing any work. Contractor shall be bonded and provide a valid certificate to the COR. If the alternative government owned work site is utilized, the contractor shall limit the community impact of the work by restricting the use or testing of power equipment and emergency sirens to the hours of 8:00 AM to 7:00 PM.

Place of Performance At contractors’ installation facility or if mobile installer work will be performed onsite at any of the three NPS sites as scheduled/coordinated with the COR.

Period of Performance

The period of performance of the awarded IDIQ contract shall be for a five-year period. Task Orders will be competed and awarded during the life of the contract. The IDIQ contract Period of Performance is as follows:

IDIQ Year 1: January 1 – December 31, 2027 IDIQ Year 2: January 1 - December 31, 2028 IDIQ Year 3: January 1 – December 31, 2029 IDIQ Year 4: January 1 – December 31, 2030 IDIQ Year 5: January 1 – December 31, 2031

Payment Structure The contractor will be paid upon completion of the work as identified in each individual task order.

Payments shall be submitted via IPP with Vendor’s business invoice and supporting documentation for work performed. The documentation is required to be uploaded as an attachment to the IPP invoice.

The Contracting Officer’s Representative (COR) will be the billing POC for this contract.

Contracting Officer’s Representative (COR) The CORs for the awarded IDID contracts will be identified in a separate document

WARRANTY: The Contractor shall provide a one-year warranty on all labor. If installed equipment malfunctions within a year of completion the Contractor shall in a timely manner assess the malfunction to determine if there was faulty labor or equipment. If labor is found to be at fault the Contractor shall fix or replace the equipment at no cost to the government. If the equipment is found to be at fault the

Contractor shall supply a quote to obtain and replace the faulty equipment and replace under factory warranty if applicable. The government reserves the right to obtain a second opinion.