Sol_140P9721Q0008_Amd_0003.pdf

PDF 92 KB Posted

Attached to
Electric Boiler Installation Kotzebue, AK
Solicitation number
140P9721Q0008
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P9721Q0008 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PAK

Anchorage AK 99501-2327 240 W. 5th Ave, Room 114 NPS, ARO - Alaska Regional Office

03/10/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/31/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1 - Extend RFQ due date and time. RFQ due date and time is March 17, 2021 @ 3pm Alaska time.

2 - Post questions and answers #2, dated March 5, 2021

Q3. Please confirm that the KEA remote control panel to be supplied by the utility is available otherwise please confirm the lead time to be assumed for receiving this control panel from the utility?

A3. The remote control panel will be provided by KEA. There is a 3 to 6 week lead time to order and manufacture the panel. The panel will be ordered after contract award.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Amanda Jordan

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P9721Q0008/0003

Q4. Per Performance Work Statement , Description of Tasks, 2. d. Furnish and install manufacturer specified conductors. Cut sheet doesn¿t say what conductors is specified. Will THHN or XHHW be acceptable?

A4. All conductors for this project must meet all

NEC 2017 code requirements, including but not limited to size, application, and environmental conditions.

Q5. Per Performance Work Statement , Description of Tasks, 2. f & g. These are for the meter base which is normally supplied and installed by utility. Are we to wire these units?

A5. The meter is not a standard utility meter but rather a power meter mounted in the KEA control panel. Contractor to provide Voltage feeds for the power meter (Task 2.f) and wire the new current transformers to the KEA control panel

(Task 2.g).

Q6. From the looks of the photos the existing service is a 600 amp 208 volt 3 phase. Is the plan to demo existing service and down it to 400 amp, which I don¿t believe is enough power for the building? Or is this a new separate service?

Which we will not be able to use existing CT can or conduits. It will be new conduit from transformer, CT can, meter base, and new disconnect.

A6. The existing building service is to remain. A new dedicated service will be provided by the contractor. Conductors for the new service will run in the existing conduit and pass through the existing CT Can, to the new disconnect mounted on the building exterior.

Q7. Per print M1.0 detail 2 we are to install a new service disconnect switch on the interior of building. I believe this needs to be a panelboard possibly with a main breaker , one 300 amp breaker for new boiler, and on 20 amp breaker for the control panel.

A7. A new panel with a main breaker, and additional breakers for the boiler, control panel, and pumps, is acceptable

Q8. Is there adequate room for the panelboard in the proposed boiler location. I.e. electrical working clearance.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P9721Q0008/0003

A8. The proposed work area has sufficient space to meet equipment clearances.

Q9. From photos at the service I see conduits running below building. Is there adequate space for the new boiler feed?

A9. The existing conduits do have capacity for the new conductors, and terminate in the existing mechanical room. Routing of all electrical conductors to the new boiler location is the responsibility of the selected contractor.

Period of Performance: 03/29/2021 to 06/15/2021

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110