B08_Attachment_1_CABR_Door_Install_SOW_Final.docx
DOCX document 28 KB Posted
- Attached to
- CABRILLO AUDITORIUM DOOR INSTALL
- Solicitation number
- 140P8526Q0093
About this file
This is a Statement of Work (SOW) for the installation of an emergency egress door and frame assembly at the Cabrillo Theater located within Cabrillo National Monument in San Diego, California. The Contractor shall remove an existing wood door and frame assembly and install a Government-furnished hollow metal door (HMD), hollow metal frame (HMF), and associated panic hardware and door hardware. The Government will provide the hollow metal frame, two hollow metal doors, panic hardware, associated door hardware, and manufacturer documentation. The Contractor must furnish all labor, supervision, tools, equipment, anchors, fasteners, shims, caulking, sealants, backing materials, and other miscellaneous installation components necessary for a complete installation. The Contractor is responsible for demolishing and disposing of the existing wood door and frame assembly while protecting adjacent building components, field-verifying dimensions and site conditions, installing the frame to ensure it is plumb, level, square, and securely anchored, and verifying proper operation of the completed assembly. The installation must comply with applicable Federal, State of California, and local codes and regulations, including the International Building Code, International Fire Code, NFPA standards, and accessibility requirements, while maintaining the fire-resistance and structural integrity of the existing building. Submittals include field verification dimensions, installation plans if requested by the Contracting Officer's Representative (COR), and product data for contractor-furnished materials. Closeout activities include debris removal, surface cleaning, operational demonstration to the COR, and correction of any identified deficiencies prior to acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_6_Drawings_621.pdf | ||
| B08_Attachment_4_Drawings_611.pdf | ||
| B08_Attachment_5_Drawings_612.pdf | ||
| Sol_140P8526Q0093.pdf | ||
| B08_Attachment_2_Wage_Determination_CA20260001.txt | TXT text file | |
| B08_Attachment_3_Door_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 01 – GENERAL REQUIREMENTS
Cabrillo National Monument – Museum Emergency Egress Door & Frame Installation
SECTION 01 10 00 – SUMMARY OF WORK
1.1 PROJECT DESCRIPTION
A. The Contractor shall provide all labor, supervision, tools, equipment, fasteners, shims, anchors, sealants, temporary protection, transportation, and incidentals necessary to remove an existing wood door and frame assembly and install a Government-furnished hollow metal door (HMD), hollow metal frame (HMF), and associated door hardware at the Cabrillo Theater located within Cabrillo National Monument, San Diego, California.
B. The purpose of this project is to install a new emergency egress door assembly within the existing wall opening in accordance with the attached drawings and manufacturer requirements.
1.2 GOVERNMENT-FURNISHED MATERIALS
The Government will furnish:
• One (1) hollow metal frame (HMF)
• Two (2) hollow metal door (HMD)
• Panic hardware and associated door hardware
• Manufacturer cut sheets and product information
1.3 CONTRACTOR-FURNISHED MATERIALS
In addition to labor and equipment, the Contractor shall furnish all anchors, fasteners, shims, caulking, sealants, backing materials, and miscellaneous installation components necessary for a complete installation of the Government-furnished door, frame, and hardware.
1.4 EXISTING CONDITIONS
A. Existing opening consists of a wood door and wood frame assembly installed within an existing framed wall assembly. Doors are currently boarded up and non operational.
B. Contractor shall field verify all dimensions and site conditions prior to commencing work.
C. Existing wall conditions are shown on the attached architectural drawings and details.
1.5 DEMOLITION
A. Remove existing wood door, wood frame, anchors, fasteners, and associated hardware.
B. Dispose of demolished materials off-site.
C. Protect adjacent walls, finishes, flooring, and building components from damage.
D. Provide temporary boarding and security protection of the opening if demolition and installation cannot be completed during the same mobilization.
1.6 INSTALLATION
A. Install the Government-furnished hollow metal frame within the existing opening in accordance with manufacturer requirements and attached architectural details.
B. Furnish and install all anchors, shims, fasteners, sealants, caulking, and miscellaneous installation materials necessary to securely anchor the frame to the existing structure and provide a weather-tight installation.
C. Install Government-furnished hollow metal door and Government-furnished hardware.
D. Ensure frame is plumb, level, square, and securely anchored.
E. Adjust hinges, latch, panic hardware, and closer to provide smooth operation.
F. Verify proper door clearances and full operation without binding.
G. Ensure completed installation provides a fully operational emergency egress door assembly.
H. Furnish and install sealants and caulking around the perimeter of the hollow metal frame as required to provide a complete, weather-tight, and finished installation. Sealants shall be compatible with adjacent building materials and installed in accordance with manufacturer recommendations.
1.7 SUBMITTALS
A. Submit field verification dimensions prior to installation.
B. Submit installation plan if requested by the COR.
C. Submit product data for any contractor-furnished installation materials.
1.8 CLOSEOUT
A. Remove debris and construction waste from the site.
B. Clean installed door and frame surfaces.
C. Demonstrate proper operation of the completed assembly to the COR.
D. Correct deficiencies identified during final inspection prior to acceptance.
1.9 PERIOD OF PERFORMANCE
The Contractor shall complete all work within the period specified in the Notice to Proceed.
1.10 CODES AND STANDARDS
A. All work shall be performed in accordance with applicable Federal, State of California, and local codes and regulations.
B. Installation shall comply with applicable building, fire, life-safety, accessibility, and manufacturer requirements.
C. Contractor shall install the door assembly in accordance with the currently adopted IBC, IFC, NFPA standards, and applicable accessibility requirements.
D. Emergency egress components shall provide unobstructed egress and proper operation upon completion.
E. Contractor shall notify the COR of any conflicts between field conditions, drawings, materials, or applicable codes before proceeding.
F. Installation shall not reduce the fire-resistance, structural integrity, or life-safety function of the existing building assembly.
File details come from the government source that posted it. Updated .