B09_Attachment5_Amendment3_Answers_to_Contractor_Questions_0003.pdf

PDF 877 KB Posted

Attached to
Steel Bridge Beams for Yosemite National Park
Solicitation number
140P8524Q0012
Issued by

About this file

This document provides answers to contractor questions regarding Solicitation Number 140P8524Q0012 for the fabrication, supply, and delivery of wide flange steel bridge beams for Yosemite National Park. The solicitation requires the fabrication and delivery of steel bridge beams according to the specifications and drawings provided. Quotes are due by January 19, 2024, with an anticipated delivery date of June 1, 2024. This is a 100% small business set-aside for a firm fixed price commercial contract, with a size standard of 1,500 employees and NAICS code 331110. The National Park Service intends to award a single contract based on price and technical capability.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

Questions and Answers

Supply and Delivery of Steel Bridge Beams Solicitation # 140P8524Q0012

Yosemite National Park

Notice: It appears that multiple questions may be related to the original drawing set, which was posted in error, therefore it was replaced with a revised 4-sheet drawing set, called the Wapama Falls Bridge Beam Design Drawings, revised on December 21, 2023 as part of Amendment No. 1 and posted to SAM.GOV. So please review all the latest Amendments on SAM.GOV. for this solicitation, 140P8524Q0012.

1. Please clarify if the required beams are stainless steel or the type of material required.

Answer: Please refer to the Wapama Falls Bridge Beam Design Drawings and go to sheet 3 of 4, the Bridge Layout and General Notes drawing, ref. subsheet no. S02. On the lower left side of this drawing you will see the Structural Steel Notes: Item 1, says, “ALL STEEL SHALL BE ASTM

A992, GR. 50 (FY=50 KSI).”

2. On Sheet 3 of 3 there’s a Deck Cross Section detail showing the Diaphragm detail, can you tell me how many of these Diaphragms are required and at what spacing?

Answer: I believe you may be referring to the original drawings, however there was an Amendment No. 1 issued on December 21, 2023, which provided a revised drawing set with four sheets, and these are uploaded onto the SAM.Gov site. So please refer to these Amended drawings called the Wapama Falls Bridge Beam Design Drawings and then go to sheet 3 of 4, the Bridge Layout and General Notes drawing, ref. subsheet no. S02 and you will see the required spacing for the diaphragms.

3. What are the beams to be coated with?

Answer: There is no special coating on the steel, please refer to the Wapama Falls Bridge Beam Design Drawings sheet 3 of 4, where it references the structural steel notes and in Item 1, it states the type of steel, “ALL STEEL SHALL BE ASTM A992, GR. 50 (FY=50 KSI).”

4. Could you please provide more details on the expected timeline for the project, including the deadline for project completion and delivery?

Answer: Please refer to page 4 of 31, which states, “3. Delivery Date. Provide a proposed delivery date below price schedule and include in quote.” The Contractor is responsible for proposing a reasonable schedule for the fabrication and delivery of these beams no later than May 30, 2024.

5. Are there any specific quality control or inspection processes that are required before, during, or after the delivery of the steel beams beyond the x-ray inspection required for welding?

Answer: The Contracting Officer’ Representative will inspect the beams during the fabrication process. It is the Contractor’s responsibility to ensure the beams are fabricated and delivered such that they meet the requirements of the plans and specifications/scope of work. Also, as noted on the drawings the welds need to be completed in conformance with the bridge welding code, AASHTO/AWS D1.5>>“4. ALL BRIDGE WELDING SHALL CONFORM TO THE LATEST EDITION OF AWS D1.5.” Also note, these beams do have a camber in them as noted on sheet 2 of 4, Wapama Falls Bridge Beam Design Drawings.

6. Could you please specify if there are any particular requirements regarding the coating and finishing of the steel beams? (Information on the type of coating, standards to be adhered to, and any aesthetic considerations would be greatly appreciated.

Answer: As noted in question 3 above, there is no special coating on the steel beams, please refer to the aforementioned Wapama Falls Bridge Beam Design Drawings sheet 3 of 4, where it references the structural steel notes and in Item 1, it states the type of steel, “ALL STEEL SHALL BE ASTM A992, GR. 50 (FY=50 KSI).” And Item 4 states “ALL BRIDGE WELDING SHALL CONFORM TO THE LATEST EDITION OF AWS D1.5.” So the welds need to be professional and understand the steel needs to be clean, no coatings, colorings, corrosion or pit marks, no burrs in holes or on the welds, nor any jagged welds or protrusion sticking out of the welds off the side of the cope, etc… Any additional question please refer to the reference requirements, specifications, codes and guidelines identified in the solicitation.

7. What kind of deck is required?

Answer: There is no deck required, this solicitation is for the components detailed on the Wapama Falls Bridge Beam Design Drawings, sheets 1-4, which identifies the required components, including but not limited to, the beams, diaphragms, bolts, etc.

8. What are the load rating requirements for this bridge?

Answer: Please refer to the Wapama Falls Bridge Beam Design Drawings, sheet 3 of 4 where it references the Design Criteria which is a requirement, as follows:

1. PEDESTRIAN LIVE LOAD: 100 PSF.

2. DESIGN SNOW LOAD: 85 PSF.

3. EQUESTRIAN LOAD: 1000 POUNDS OVER 16 SQUARE INCHES (4 INCH X 4 INCH).

4. PGA = 0.23G

5. WIND = 90 MPH

9. Will the bridge project require Cal Trans HL-93 loading or something different?

Answer: As noted in question no. 8, the Design Criteria for these bridge beams is as follows:

1. PEDESTRIAN LIVE LOAD: 100 PSF.

2. DESIGN SNOW LOAD: 85 PSF.

3. EQUESTRIAN LOAD: 1000 POUNDS OVER 16 SQUARE INCHES (4 INCH X 4 INCH).

4. PGA = 0.23G

5. WIND = 90 MPH

10. Is the “Timber Decking by Others” a currently advertised scope that we could also bid on?

Answer: No

11. The welding specifications on this job is AWS D1.5 which is bridge code. Our business partner wifcosp are certified to AWS D1.1. Will you accept AWS D1.1?

12. Please confirm if the steel beams need to be painted at the fabrication shop.

13. If they are to be painted at the fabrication shop, please provide specifications for paint and confirm if faying surfaces would need to be painted at the shop as well.

Answer: Not Applicable

14. We are able to move these steel bridge beams, from where are these getting picked up and what is the time frame this should be all done?

Answer: Refer to the first page of the specifications/Scope of Work, under Location, section 2.1 which says: The fabricated beams shall be supplied to the Hetch Hetchy Reservoir visitor parking lot which is located in the Mather District of Yosemite National Park at the end of O’Shaugnessy Dam Road, Groveland, CA 95321 no later than 5/30/2024. See attached map for supply location.

Reference the Wapama Falls Bridge Beam Design Drawings, Sheet 1 of 4, This cover sheet includes a map and on that map it references the “Construction Material Delivery Location”.