FedConnect File

58 KB Posted

Attached to
WATER INTAKE AND STORAGE UPGRADES AT LASSEN NP Federal contract opportunity
Solicitation number
140P8419R0012
Issued by
Department of the Interior National Park Service

About this file

Click here to see more information about this opportunity on FedConnect

Text of this file

Opportunity: WATER INTAKE AND STORAGE UPGRADES AT LASSEN NP

Description

WATER INTAKE AND STORAGE UPGRADES, LASSEN VOLCANIC NATIONAL PARK, TEHAMA COUNTY, CALIFORNIA.

The National Park Service, Lassen Volcanic National Park, has a requirement for the upgrade of the water intake and storage in the headquarters area of the park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation.

Per FAR 36.204 the project range is estimated to be between $250,000 and $500,000.

The North American Industry Classification System (NAICS) Code for this requirement is 237110, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.

This acquisition is a Historically Underutilized Business Zone (HUBZone) Set-Aside. Offers are solicited only from HUBZone small business concerns. Offers received from concerns that are not HUBZone small business concerns shall not be considered.

The work of this contract consists of labor, materials, and equipment required for the replacement of portions of the Lassen National Park Headquarters and Town of Mineral raw water lines and diversion improvements. The work includes but is not limited to installation of 6-inch & 8-inch PVC raw water line at a varied depth, installation of two diversion boxes, installation of a subsurface intake near the Martin Creek Diversion, and improvements at the Headquarters Water Tank.

This project consists of furnishing all materials, equipment, and labor for installation of the 6-inch DR-14 C900 PVC water main as shown on the Drawings. The work includes, but is not limited to, removal of excess material, excavation, dewatering, removal of old pipe materials, bedding, backfill, compaction, piping, fittings, tracer wire and boxes, erosion control measures, pressure testing, flushing, surface restoration and all other work necessary to complete the installation.

The project consists of furnishing all materials, equipment, and labor for installation of the 8-inch DR-14 C900 PVC water main as shown on the Drawings. The work includes, but is not limited to, removal of excess material, excavation, dewatering, removal of old pipe materials, bedding, backfill, compaction, piping, fittings, tracer wire and boxes, erosion control measures, pressure testing, flushing, surface restoration and all other work necessary to complete the installation.

The project consists of consists of furnishing all materials, equipment, and labor for installation of the Interconnection Box and connection piping as shown on the Drawings. The work includes, but is not limited to, removal of excess material, excavation, dewatering, removal of old pipe materials, bedding, backfill, compaction, piping, fittings, precast concrete box, overflow, canalgates , grating , erosion control measures, surface restoration and all other work necessary to complete the installation.

The project consists of furnishing all materials, equipment, and labor for installation of the Martin Creek Diversion Box and connection piping as shown on the Drawings. The work includes, but is not limited to, removal of excess material, excavation, dewatering, removal of old pipe materials, bedding, backfill, compaction, piping, fittings, precast concrete box, canalgates, grating , erosion control measures, surface restoration and all other work necessary to complete the installation.

The project consists of furnishing all materials, equipment, and labor for installation of the Subsurface Intake and piping as shown on the Drawings. The work includes, but is not limited to, removal of excess material, excavation, dewatering, silica sand material, perforated piping, non-perforated risers, backfill, compaction, fittings, erosion control measures, surface restoration and all other work necessary to complete the installation.

The project consists of furnishing all materials, equipment, and labor for the installation of a floor slab in the west tank concrete tank and other miscellaneous improvements as shown on the Drawings. The work includes, but is not limited to, surface preparation, concrete work, and all other work necessary to complete the installation.

The Contractor shall provide all manpower, equipment, testing, and supplies to perform the replacement and related services as identified within the specifications document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.

An organized site tour has been scheduled - see Section L for more information.

Overview

Reference number:

140P8419R0012

Issue date:

07/26/2019

Response due:

08/26/2019 06:00 PM US/Eastern

Set Aside:

HUBZone

NAICS:

237110-Water and Sewer Line and Related Structures Construction

PSC / FSC:

Z1NE-MAINTENANCE OF WATER SUPPLY FACILITIES

Agency:

DOI

Contracting office:

NPS, PWR - PORE MABO

Point Reyes National Seashore

1 Bear Valley Road

Point Reyes Station, CA 94956-9703

Place of Performance:

Contact:

Elizabeth Chico

Phone:

Fax:

Email:

Elizabeth_Chico@nps.gov

Vendors conference:

Location:

Details:

What do I do now?

This is the opportunity summary page. To the left you will see a description and an overview of this opportunity.

To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.

Registered Users

To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.

Non Registered Users

You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.

Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.

Documentation

140P8419R0012

Pre-solicitation Notice

Overview

Solicitation

Overview

140P8419R0012

Att 01- Bid Schedule

Att 02- Specifications

Att 03- Drawings

Att 07- PP Questionnaire

Att 04- Wage Rates

Att 05- Relevant Experience and Past Performance

Att 06- Key Personnel Form

© 2019 Compusearch Software Systems, Inc. All rights reserved.

Terms of Service and Use

About FedConnect

Videos

Help

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.