Sol_140P8319Q0044_Amd_0001.pdf
PDF 87 KB Posted
- Solicitation number
- 140P8319Q0044
About this file
140P8319Q0044
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8319Q0044 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PY2
Ashford WA 98304-9751 55210 238th. Ave. E.
DOI, NPS, PWR - OLYM MABO - MORA
PPY
Ashford WA 98304-9751 55210 238th Ave E Mount Rainier National Park
NPS, PWR - OLYM MABO
07/15/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/05/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 0001 is to add the following Questions, Answers and changes arising from the pre-bid site visit. No other changes. Closing date is not extended.
Q: Will you allow 3" in one lift?
A: Yes
Q: On south side behind Exhibit Shelter, will pre-level be required?
A: Yes - 10' x 30' section.
Q: On south side approach to Overlook, bedrock is exposed less than 2" below surface. How to proceed?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Pamela Griffin
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8319Q0044/0001
A: No base gravel will be applied to bedrock, contractor shall tack and overlay bedrock.
Q: Where will asphalt staging area be located?
A: Box Canyon Parking Area
Q: Will cedar posts and rails be in place during contract performance?
A: Posts will be set in place but no rails will be installed.
Q: Will asphalt cover cap rock on rock walls on outer edge of overlooks and trail?
A: No, taper asphalt 2" - 3" over inner edge of rocks to allow drainage over edge but some rock exposed and not asphalted.
Q: Will current "NORTH" arrow be paved over?
A: No, NPS will remove the arrow and contractor shall reset after paving. NPS will provide siting for proper placement direction.
Q: Can dump trucks be driven down the trail to deliver asphalt?
A: No.
Q: What is load limit on Park roads?
A: 32/40tons
Park direction given at site visit:
1) Asphalt can be brought in to the Park from either direction at discretion of contractor.
2) NPS will provide Pilot car for Asphalt truck escorts within the park.
3) NPS will provide traffic control on Steven's
Canyon Road for asphalt hauling from staging area.
4) Two small sections of project worksite have been removed from this solicitation and will not be asphalted - the Comfort Station area in the southeast section of the project and the small section of trail on the west side of the Cowlitz
River bridge are deleted.
5) Approximate total tonnage of asphalt is reduced from 400tons to 370.
Legacy Doc #: NPS
Period of Performance: 09/03/2019 to 09/27/2019
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it.