This statement of work outlines the replacement of boat engines for three vessels operated by the National Park of American Samoa. The contractor shall install six new outboard engines across the R/V Malie, R/V Poge, and M/V Moana, including two 150HP engines each for the first two vessels and two 300HP engines for the third vessel. The installations must be completed within 120 days of award at the contractor's facility in Tutuila, American Samoa and include sea trials to confirm operational status. Upon completion, the contractor will transport the vessels back to the National Park of American Samoa and remove the existing engines. The related federal contract opportunity is solicitation number 140P8223Q0038 for boat engine replacements issued by the National Park Service Department of the Interior.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8223Q0038_Amd_0002.pdf | ||
| Sol_140P8223Q0038_Amd_0001.pdf | ||
| Sol_140P8223Q0038.pdf | ||
| A04_Statement_of_Work__NPSA_Fleet_Boat_Engine_Replacement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 Background
2.0 Scope
3.0 Objectives
4.0 Tasks
5.0 Delivery
6.0 Government-Furnished Property
7.0 Security
8.0 Place of Performance
9.0 Period of Performance
STATEMENT OF WORK
Replacement engines for NPSA vessels R/V Malie, R/V Poge, and M/V Moana at National Park of American Samoa, American Samoa
1.0 BACKGROUND
American Samoa is a US-affiliated territory in the tropical South Pacific consisting of five main islands ranging in elevation from sea level atolls to Mount Lata at 964 m on the island of Ta‘ū. The National Park of American Samoa (NPSA) consists of units on three of these islands and protects both unique paleotropical rainforests and Indo-Pacific coral reefs. Over 4,000 acres (~30%) of the park’s 13,500 acres are underwater. The Park also preserves the fa'asamoa-the customs, beliefs, and traditions of the 3,000-year-old Samoan culture.
The enabling legislation (Public Law 100-571) established the National Park of American Samoa " ... to preserve and protect... archaeological and cultural resources of American Samoa, and of associated reefs...". The park broadly interprets this purpose to preserve and protect the Samoan culture and their link to the marine resources. To understand and access these remote marine resources across all three islands, the park utilizes three vessels (Research Vessel Malie – 24’, R/V Poge – 24’, and Motor Vessel Moana – 33’) stationed on the main island of Tutuila. These USCG certified vessels can operate in open-ocean conditions and are outfitted to handle a variety of marine related activities such as research (e.g., scuba diving, instrument deployment, water sampling, etc.) and search and rescue operations.
NPSA must replace the Evinrude outboard engines on all three of these vessels because there is no longer a service center in the territory. In addition, Evinrude recently stopped manufacturing new engines, slowed production of replacement parts, and ceased new technician trainings. Consequently, the park must switch to another engine manufacturer that can be supported on-island such as Mercury.
This statement of work focuses on replacing the outboard engines on all 3 vessels. The Evinrude engines on R/V Malie are 13+ years old with over 1000 hours, the engines for R/V Poge are 13+ years old with over 1300 hours, and the engines for M/V Moana are 13+ years with over 500 hours. Consequently all 3 vessels need to have the outboard engines replaced to maintain the safety of our marine program. NPSA has expanded boating operations to all three islands spanning more than 70 miles between islands. These operations are conducted with a minimum of two vessels and therefore put more wear and tear on the engines. Engine functionality will be critical to keeping these trips safe and productive. NPSA is also reliant on self-rescue due to the lack of USCG response vessels in the area so having well-maintained vessels is a top priority.
2.0 SCOPE
The contractor shall install six new boat engines and the associated steering systems on the R/V Malie (2 x 150 HP engines), R/V Poge (2 x 150 HP), and M/V Moana (2 x 300 HP). These engines must have improved capabilities (e.g., fuel efficient, environmentally friendly, reliable) compared to the existing engines. The installations shall include all equipment, labor, and sea trial testing to ensure that the vessel is fully operational when it leaves the contractor or subcontractor facility. The contractor or subcontractor must be a certified service center for the installed engines and ensure that the engines can be maintained on Tutuila, American Samoa over the lifespan of the engines. In addition, selecting an engine manufacturer that allows
3.0 OBJECTIVES
This project is replacing the existing boat engines and associated steering systems on the R/V Malie, R/V Poge, and M/V Moana with newer engines that can be maintained and serviced on-island.
4.0 TASKS/ DELIVERABLES
The Contractor shall:
1) Install two new engines and the associated steering system on the R/V Malie (Figure 1).
a. Order and install two new 4-stroke 150 HP outboard engines that shall include,
i. Inline 4 with 3.0 L displacement
ii. Multi-Port Electronic Fuel Injection
iii. 25” shaft
iv. Individual engine weight of 470 lbs or less.
v. Engine wiring
vi. Engine protection operator warning system, e.g., SmartCraft Engine Guardian
vii. Gauges,
viii. Controls,
ix. Propellors
x. Fuel filter
xi. Power trim and tilt
xii. Standard commercial warranties
b. Associated steering system shall include
i. Helm
ii. Hoses and cylinder
iii. Tie bar
2) Sea trial testing for R/V Malie
a. The R/V Malie shall be tested in the ocean around the island of Tutuila, American Samoa.
b. Testing with park staff shall include
i. Launching and retrieval of vessel
ii. Idle control and gear shifting on new controls
iii. Planing at speeds above 4,000 rpm
c. Training for park staff shall include
i. Standard operational procedures for the specific engines and use of gauges
ii. Basic maintenance requirements and schedule of activities
3) Install two new engines and the associated steering system on the R/V Poge (Figure 2).
a. Order and install two new 4-stroke 150 HP outboard engines that shall include,
i. Inline 4 with 3.0 L displacement
ii. Multi-Port Electronic Fuel Injection
iii. 25” shaft
iv. Individual engine weight of 470 lbs or less.
v. Engine wiring
vi. Engine protection operator warning system, e.g., SmartCraft Engine Guardian
vii. Gauges,
viii. Controls,
ix. Propellors
x. Fuel filter
xi. Power trim and tilt
xii. Standard commercial warranties
b. Associated steering system shall include
i. Helm
ii. Hoses and cylinder
iii. Tie bar
4) Sea trial testing for R/V Poge
a. The R/V Poge shall be tested in the ocean around the island of Tutuila, American Samoa.
b. Testing with park staff shall include
i. Launching and retrieval of vessel
ii. Idle control and gear shifting on new controls
iii. Planing at speeds above 4,000 rpm
c. Training for park staff shall include
i. Standard operational procedures for the specific engines and use of gauges
ii. Basic maintenance requirements and schedule of activities
5) Install two new engines and the associated steering system on the M/V Moana (Figure 3).
a. Order and install two new 4-stroke 300 HP outboard engines that shall include,
i. V8 with 4.6 L displacement
ii. 30” shaft
iii. Conventional MidSection mounting system
iv. Individual engine weight of 560 lbs or less
v. Engine wiring
vi. Gauges,
vii. Controls,
viii. Propellors
ix. Fuel filter
x. Power trim and tilt
xi. Standard commercial warranties
b. Associated steering system shall include
i. Helm with Adaptive Speed Control that maintains engine rpm regardless of load or conditions.
ii. Hoses and cylinder
iii. Tie bar
6) Sea trial testing for M/V Moana
d. The M/V Moana shall be tested in the ocean around the island of Tutuila, American Samoa.
e. Testing with park staff shall include
i. Launching and retrieval of vessel
ii. Idle control and gear shifting on new controls
iii. Planing at speeds above 4,000 rpm
f. Training for park staff shall include
i. Standard operational procedures for the specific engines and use of gauges
ii. Basic maintenance requirements and schedule of activities
5.0 DELIVERY
The contractor or subcontractor shall perform installation of all the equipment listed in section 4.0, including sea trials, on the island of Tutuila, American Samoa.
The 3 vessels will be brought down sequentially or as space permits to the contractor or subcontractor facility by NPSA staff for installation and testing of the new engines.
Inspection of the installation progress by NPSA staff will take place at 60 days from the contract award date for each of the vessels and during the sea trials for each of the vessels.
Delivery of the completed boat engine installation shall take place at the contractor or subcontractor facility as soon as it is completed.
Completion date shall be 120 days or sooner after the contract is awarded for each of the vessels.
The contractor or subcontractor shall notify NPSA staff that the vessel can be picked up. Upon receipt of the vessel, the contractor must obtain acceptance of the finished installation from government staff by signing approval of the final invoice.
6.0 GOVERNMENT-FURNISHED PROPERTY/SERVICE
The Government will transport the 3 vessels sequentially or as space permits, with the existing engines using park staff to the contractor or subcontractor facility on the island of Tutuila, American Samoa.
Upon completion of the installation of the new engines and subsequent sea trials, the contractor or subcontractor shall return the old engines for each of the vessels back to NPSA for appropriate property removal of government equipment. This includes the gauges, helm, and steering system.
The Government shall be responsible for transporting the 3 vessels back to the NPSA facility after completion of the engine installation.
7.0 SECURITY& ACCESS REQUIREMENTS:
All contractor personnel shall always be fully clothed while performing the services of this contract. "Fully Clothed" is deemed to mean that a shirt (or T-shirt), trousers, closed-toe shoes and personal protective equipment if required, shall always be worn. Tact, diplomacy, and courtesy shall always be used during contact with government staff.
8.0 PLACE OF PERFORMANCE
Contractor or subcontractor facility on the island of Tutuila, American Samoa
9.0 COMPLETION DATE/ PERIOD OF PERFORMANCE
120 days from date of contract award for each of the vessels.
Figure 1. R/V Malie and current Evinrude 150 HP E-Tec engines.
Figure 2. R/V Poge with current Evinrude 130 HP E-Tec engines
Figure 3. M/V Moana with current Evinrude 225 HP E-Tec engines.
image1.jpeg image2.jpeg image3.jpeg