This document is a Questions and Answers (Q&A) amendment for a federal solicitation to refurbish bronze elements at Perry's Victory and International Peace Memorial. The solicitation (140P6425Q0088) seeks a contractor to restore bronze handrails, doors, plaques, and other bronze elements, with a total of 179 linear feet of handrails and 10 bronze and 2 aluminum plaques to be refinished. Key project details include a 120-day performance period with an anticipated award date in early August 2025, and the work is limited to internal bronze railings and external bronze elements only. The project is a 100% small business set-aside with NAICS code 541990 and a small business size standard of $19.5M.
The Q&A document provides extensive clarifications about the project scope, including permission to remove doors and plaques for off-site repairs, requirements for temporary door enclosures, and specifics about site access (limited water and power outlets available). Notable requirements include repairing all cracks, potentially including extensive door cracking, with the possibility of future metal recladding if repairs prove insufficient. The National Park Service will allow work to continue during winter if the ferry service remains operational and may extend the performance period if ferry service interrupts the project. No bid, performance, or payment bonds are required, and no conservator oversight is specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Observation_Door_Pictures_0003.pdf | ||
| Sol_140P6425Q0088_Amd_0003.pdf | ||
| Sol_140P6425Q0088_Amd_0002.pdf | ||
| Revised_Specifications_0002.pdf | ||
| Sol_140P6425Q0088_Amd_0001.pdf | ||
| Sol_140P6425Q0088.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6425Q0088
Amendment #: P0001
Refurbish Bronze Elements in Memorial – PEVI
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response
1. What is the total linear feet of the bronze handrails- both within the stairway and the outside the elevator enclosure (photos 17,18, 19, 20-28)?
The linear feet of all the handrails is 179 feet
2. Is the crack seen in photo 35 and 36 the only cracks that require repair?
No, please quote the repair of all cracks. A revised specification document will be released.
3. When was the last time the bronze elevator enclosure was refinished and the lacquer applied? Do all the plaques and bronze items have (old) lacquer on them
Unknown on the elevator refurbishment. Unknown, we do not know the treatment past contractors have used
4. The specification calls out (3) pocket doors - I see what looks like a pair of pocket doors, are you referring to the elevator door as a pocket door? Can you send pictures of the pocket doors or copy them from the solicitation and paste them in your reply?
We are not referring to the elevator as a pocket door. Should be phots in the solicitation of pocket doors, there are three in total located at rotunda level.
5. Do the locks work now? Are there any missing parts? All locks work except for the east pocket door. There is a broken key in the lockset of that door.
6. What is the height of the doors with the ornate transoms? One picture shows a transom - does the other (similar) door also have a transom?
Penthouse doors are 22 in X 88 in.
The transom is 48in X 27in.
7. Please confirm the anticipated award date remains early
August 2025?
Confirmed
8. Is there a published estimated magnitude of cost for this project? If so, please advise of that cost?
There is not.
9. Based on 120 days period of performance how shall cold weather conditions be handled? Will the project be shut down when weather becomes unfavorable to operate the project and resume in 2026, or will the project commencement be delayed until spring 2026 to allow for continuous operation of the project start to finish.
The only way the project will shut down is if the Ferry Service stops running the island.
10. If the project is required to start in Q3 2025 and the ferry shuts down before the work is completed, will NPS reasonably extend the POP into 2026 to account for this circumstance?
Yes
11. Will NPS permit plaques and doors that can be removed for repairs and refinishing to be removed from site and reinstalled for those services?
Yes
12. If ground level doors are removed for repairs, who is responsible for temporary closure and security of those openings?
Contractors is required for the temp enclosure. Temp enclosure must be secure and withstand winter weather if off during that time.
13. Are there any documents or treatment reports for previous repairs, cleaning and refinishing to the doors that can be provided?
Yes, Will attach copy of documents from previous door repair and refurbishment. See below.
14. Door lock repairs may require doors to be removed. If so, is this permitted?
Yes
15. Observation level double doors have more than a single crack and are actually cracked extensively. Cracks and overall condition of the doors may be beyond reliable and durable long-term repairs. Further evaluation is required. It may be necessary to reclad the doors with new in-kind fabricated metal cladding. Please advise how these options should be priced to NPS?
Please, quote the repair of all cracks.
A revised specification document will be released. If you are able to you are also welcome to include a separate quote that includes new metal cladding. Otherwise, quote all crack repairs. If door were to be found unrepairable during contract performance other options would be evaluated. To include modifications to remove the crack repairs from the requirement, door replacement, and metal cladding.
16. Observation level double doors will need to be removed off-site for repairs. Please confirm this will be permitted?
Yes, Will need to install temp door to be able to handle weather conditions
17. Please confirm if the bronze railings to be attended are limited to all bronze railings internal to the column monument? Or if external railings are included in this scope?
Internal railings only are to be refurbished
18. Please confirm if the work on the elevator stations includes interior metal elements in the elevator car? Or only external metal elements of the top and bottom stations?
External only
19. If internal elevator car elements are to be attended, is it required to perform this work after hours? Or will NPS shut down operation to permit this work to be conducted during normal business hours?
No internal work on elevator car.
20. The two aluminum plaques referenced in the scope could not be located. Please clarify and provide photos?
The two plaques that are aluminum are located at the south entrance door to the rotunda. The Kennedy and Pierson plaques.
21. Please confirm work on the project is limited to only bronze cleaning as there are substantial and significant staining on stonework immediately adjacent to the bronze plaques and doors on ground level? Please confirm no work is included on non-bronze elements?
Only Bronze elements are to be refurbished
22. Where and what amount of available access to water and power is provided on site?
Water is located on a level above the lower elevator landing. There is one 20-amp power outlet in rotunda.
There are outlets on every accessible level.
23. Is a bid bond required for submission of the RFP and offer? No. Contract will be for a service.
Not a construction project.
24. Is a performance and payment bond required for the contract?
No. Contract will be for a service.
Not a construction project.
25. The specification includes no reference to requirements for oversight by a qualified conservator. Please confirm there are no requirements for a conservator to be involved with and/or oversee work conducted on this project?
We do not specify a conservator
26. There is no reference to mockups being required for this work in specification. Please confirm no mockups are required?
No required mockups. We would like to see examples of past work to possible see what our finished product work could look like
27. Please confirm that contract submittal requirements will be limited to only those identified in Item 8, page 12 of 18 in the project specification?
Confirmed
28. How many of the locks are working today? The three pocket doors do not work properly.
29. Is there access to the pocket door tracking system? Yes
30. Are any of the bronze thresholds heaved or warped or interfering with the proper operation of the doors?
No
31. Are the elevator doors working properly? Yes
32. Can you send me a list of the vendors that attended the walk- thru of the project.
This will not be provided.
33. I just wanted to confirm the quantity of plaques needing restored for this project. The solicitation states 10 bronze plaques and 2 aluminum plaques. However, we only noted 8 plaques on the rotunda level and 2 on the second level, for a total of 10. Can you please confirm the total qty of plaques needing restored?
The quantities states are correct.
There are 10 bronze and 2 aluminum plaques.
34. Is there 220 power outlet near the doors or elevator enclosure?
No.