B09_Solicitation_Amendments-Q_A_0001.pdf

PDF 107 KB Posted

Attached to
Mold Remediation IAW Specifications Federal contract opportunity
Solicitation number
140P6425Q0050
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Mold Remediation IAW Specifications, newest first.
File Type Posted
Sol_140P6425Q0050_Amd_0002.pdf PDF
B11_Site_Visit_Sign-In_Sheet-STGE_0001.pdf PDF
Sol_140P6425Q0050_Amd_0001.pdf PDF
Sol_140P6425Q0050.pdf PDF
B08_Solicitation-Specifications.pdf PDF
B08_Solicitation-Price-Bid_Schedule.xlsx XLSX spreadsheet
B03_DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P64250050

Amendment #: P00001

Mold Remediation IAW Specifications – STGE

Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. Would our certifications qualify us, as we would love the opportunity to bid? We specialize in using the dry fog technique to remediate mold as shown in the army corps report that I have attached Could you please provide us guidance if you would approve us to apply, or could you please update the RFP to include our certifications?

1.2.12 Microbial Remediation Supervisor Individual

responsible for the execution of the microbial remediation work as defined by the scope of work.

This individual must have documented training in microbial remediation and have at least three years of experience in microbial remediation work.

Remediation contractor's on-site supervisor must have one of the following certifications: Council-Certified

Microbial Remediator (CMR), or Council-Certified

Microbial Remediation Supervisor (CMRS) as certified by the American Council for Accredited

Certification, or Applied Microbial Remediation

Specialist (AMRS), Institute of Inspection, Cleaning, and Restoration Certification (IICRC).

Only methods approved in the specifications are acceptable, please see Specifications Part 1.3

(Requirements), Part 2 (Products), and Part 3 (Execution).

2. 1. Has there been an Asbestos inspection report conducted?

2. Are we removing the exterior drywall located in the hallway?

3. Are we removing the drywall ceiling?

1. No, the construction date of the main portion of the house is from the 1980s and the back wing area the work will be done at was a later addition. Therefore, we don’t think there is a threat of asbestos.

2. Yes, this is included in the approximate measurements within the D1.

3. Ceiling drywall is not to be removed.

3. Hello, we have a quick question on the estimate for Ceiling drywall will not be getting the Ste. gen building. Are you wanting all of the ceilings removed in the hallway, closet, and the entire bathroom area and bathroom closet? Please get back to me as soon as you can. Thank you very much!

removed.

4. When are you planning to post the attendees list for those who attended the site visit

Will be posted when solicitation amended to post Q&A

5.

6.

7.

8.

9.

10.