This document is a Project Specifications document for brick masonry repointing and repair of 16 chimneys on historic structures at Fort Scott National Historic Site in Fort Scott, Kansas. The project involves re-pointing exterior exposed brick chimneys on nine historic buildings (HS-1, 2, 4, 5, 6, 7, 8, 11, and 12), with most buildings having two chimneys and HS-11 and HS-12 having one chimney each.
Key work requirements include carefully removing hard mortar to preserve soft bricks, replacing fractured bricks with matching Acme Brick Company products, removing and reinstalling lightning suppression equipment, replacing chimney crowns "in-kind", replacing counter flashing with new galvanized stainless steel flashing, and repairing or replacing cedar shingles as needed. The contractor must submit sample boards of replacement bricks, photo document step flashing conditions, and ensure all work maintains the historical integrity of the structures. The project has a 180-calendar day performance period from the Notice to Proceed, with specific requirements for preserving the site's historical and archaeological fabric during construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications-additional_photos_0002.pdf | ||
| Sol_140P6425B0011_Amd_0002.pdf | ||
| Sol_140P6425B0011_Amd_0001.pdf | ||
| B11_Site_Visit_Sheet-_6-16-25_0001.pdf | ||
| B03_DOL_Wage_Determination.pdf | ||
| B08_Solicitation-Specifications.pdf | ||
| Sol_140P6425B0011.pdf | ||
| B08_Solicitation-Bid_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2023-11-11 Page | 1
Fort Scott National Historic Site 1 Old Fort Boulevard
Brick Masonry Repointing and Repair of 16 Chimney's on Historic Structures.
PMIS 314912
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
2025-03-06
Page | 2
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 04 – MASONRY
Section 04 01 20 - Brick Masonry Repointing Section 04 20 00 -Brick
SITE PLAN – APPENDIX A
PHOTOGRAPHS – APPENDIX B
DRAWINGS – APPENDIX C
Page | 3
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: Fort Scott National Historic Site, located in Fort Scott, Kansas, is a significant historical landmark that preserves the legacy of the U.S. Army's role in the westward expansion of the United States during the 19th century. Established in 1842, the fort played a crucial role in various military campaigns and served as a base for operations during the Mexican American War and the Civil War. The site features a collection of historic buildings, including barracks, officers' quarters, and a hospital, which collectively represent the architectural and cultural heritage of the period. The roofs slopes vary from 12 x 7 ½ to 12 x 8.
1.2 Work Covered by the Contract Documents:
A. Project Location: 1 Old Fort Boulevard, Fort Scott, Kansas 66701
B. Work consists of: The re-pointing of the exterior exposed brick chimneys on the following buildings of the Fort Scott National Historic Site; HS-1, 2, 4, 5, 6, 7, 8, 11, & 12. HS-11 & 12 have a single chimney on each building, while all of the others have two chimneys each.
Sixteen chimneys in total, mostly on two- and three-story historic structures.
The contractor will cut to remove the extremely hard mortar, in order to save the extremely soft bricks. Existing bricks were manufactured by Acme Brick Company (see www.brick.com for contact, locations, and brick product). All replacement brick shall be by Acme Brick Company or approved equivalent manufacturer with product matching existing chimney brick.
Contractor to review existing brick on site in making determination of suitable proposed sample product line(s). The contractor shall provide manufacturer produced sample boards (12”x16” minimum size sample board) representing the full color and texture range of the proposed brick to the COR for review and written approval prior to procuring the product.
They will remove the existing lightening suppression equipment and re-install. They will remove the existing crowns and replace them “in-kind,” size, shape, and color. They will remove the counter flashing that is ‘tucked’ into the mortar and replace it with new galvanized counter flashing, fastening it in the same fashion as existing. Step flashing beneath counter flashing is assumed to be in satisfactory condition and not called for replacement. If the step flashing, once revealed from removal of counter flashing, is not in acceptable condition, stop work and notify COR for written determination of the manner to proceed. The Contractor shall photo document condition of step flashing at all faces of all chimneys and submit to the COR before covering up with new counter flashing. All counter flashing shall be stainless steel complying with ASTM A 240, Type 304 with minimum thickness 0.01-inch.
If damage is done to cedar shingles, shingles will need to be replaced with in-kind material.
Where shingles are damaged or require removal, the Contractor shall reinstall or replace with like shingle material without compromise to the roof’s water tightness. As government furnished material, the Contractor shall be allowed to use back stock shingle material stored http://www.brick.com/
Page | 4 at the park at no cost. Total coverage available for use is 1000 square feet which is expected to greatly exceed the potential total quantity required due to damage from re-flashing work.
The Contractor shall be responsible for procuring any additional quantities greater than government furnished shingle quantity should site damage during construction require additional replacements. Existing shingles are Certi-Wood Blue Label fire resistant wood shingle. All Contractor provided shingles, should extent of construction damage exceed government furnished quantity shall be of the same manufacturer or COR approved equivalent. Leaks identified as originating from the improper replacement of shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
Cracked bricks will be replace with new of same size and color, not to be softer than the existing ones. The new mortar will match existing in color and hardness. The contractor will also apply a sealer to the new exterior surfaces. Buildings HS-05 and HS-06 chimneys will need to be inspected and repaired to ensure full functionality. Chimneys on HS 1, 2, 4, 7, 8, 11, 12 will need to be capped/closed off if not already capped.
A summary of work to be performed for each building with approximated quantities are as follows:
HS-01
• Mortar Pointing Repair: 63 sf (north chimney) | 63 sf. (south chimney) Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officers Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing. 8 sf (north chimney) 8 sf (south chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crowns: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crown matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating repellant water sealant to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications.
Page | 5
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be a high heat spray or brush applied Rust-o-leum, Krylon, or COR approved equivalent capable of withstanding 2000-degrees F. (min).
HS-02
• Mortar Pointing Repair: 62 sf (north chimney) | 62 sf (south chimney). Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (north chimney) | 8 sf (south chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crown: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crowns matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications.
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
HS-04
• Mortar Pointing Repair: 62 sf (north chimney) | 62 sf (south chimney). Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated
Page | 6 brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (north chimney) | 8 sf (south chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crowns: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crown matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver, or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
HS-05
• Mortar Pointing Repair: 58 sf (north chimney) | 58 sf (south chimney). Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (north chimney) | 8 sf (south chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crown: Fully remove all crowns, construct new cement crowns matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
Page | 7
• Flue Relining: Flue tiles are 13 x 18. 35’ from ground to Crown of chimney for both chimneys. Field verify chimney flue system prior to procuring product. Flues of the two chimneys on HS-05 shall be repaired by one of two industry acceptable methods
– cerfractory sealant system or stainless-steel flue liner. For use of a cerfactory flue sealant system, the minimum requirement is the application of HeatSheild Flue Repair System (basis of design), or approved equivalent and shall be applied per all manufacturer’s specifications. For the flue liner alternative, the minimum acceptable level of performance is to provide and install 304 stainless steel, 24 gauge (0.024” thick) for rigid liner and 18 gauge (0.018” thick) for flexible liner. In both flue liner cases, the liner must be UL1777listed. The Contractor shall submit all proposed product data including salient characteristics and installation methods to the CO/COR for approval prior to proceeding with the work.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar, ChimneySaver, or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
HS-06
• Mortar Pointing Repair: 54 sf (north chimney) | 54 sf (south chimney). Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR)for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (north chimney) | 8 sf (south chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crown: Fully remove all crowns, construct new cement crowns matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Flue Relining: Flue tiles are 13 x 18. 25’’ from ground to Crown of chimney for both chimneys. Field verify chimney flue system prior to procuring product. Flues of the two chimneys on HS-05 shall be repaired by one of two industry acceptable methods
Page | 8
– cerfractory sealant system or stainless-steel flue liner. For use of a cerfactory flue sealant system, the minimum requirement is the application of HeatSheild Flue Repair System (basis of design) or approved equivalent and shall be applied per all manufacturer’s specifications. For the flue liner alternative, the minimum acceptable level of performance is to provide and install 304 stainless steel, 24 gauge (0.024” thick) for rigid liner and 18 gauge (0.018” thick) for flexible liner. In both flue liner cases, the liner must be UL1777listed. The Contractor shall submit all proposed product data including salient characteristics and installation methods to the CO/COR for approval prior to proceeding with the work.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver, or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications.
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
HS-07
• Mortar Pointing Repair: 57 sf (east chimney) | 57 sf (west chimney). Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (east chimney) | 8 sf (west chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crown: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crown matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
Page | 9
HS-08
• Mortar Pointing Repair: 54 sf (east chimney) | 54 sf (west chimney Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet each of the 2 chimneys) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid. Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: 8 sf (east chimney) | 8 sf (west chimney) Where shingles are damaged or require removal, the Contractor shall replace with like shingle material without compromise to the roof’s water tightness. Leaks identified as originating from the improper replacement of shingles or reinstallation of Contractor damaged shingles shall be considered applicable within the one-year warranty to provide repair to damage incurred.
• Replace Chimney Crown: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crowns matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
HS-11
• Mortar Pointing Repair: 54 sf. Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid.
Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: Flashing does not need to be replaced.
Page | 10
• Replace Chimney Crown: Fully remove all crowns, provide and place 1/8” cold steel plates over openings, and construct new cement crownmatching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications.
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be a high heat spray or brush applied Rust-o-leum, Krylon, or COR approved equivalent capable of withstanding 2000-degrees F. (min).
HS-12
• Mortar Pointing Repair: 54 sf. Mortar provided shall be installed per specification section 04 10 20 included in this Scope of Work.
• Include in your bid replacement of approximately 10% (11 square feet) of existing brick which are considered preexisting fractured and split bricks. Contractor shall be responsible for all final quantities of brick to replace prior to submitting their bid.
Contractor will be responsible for any additional fractured or split bricks damaged by the tuckpointing process. Any discrepancies with estimated brick area to be replaced and actual required, as determined prior to start of work, shall be brought to the attention of the Contracting Officer Representative (COR) for determination to proceed.
• Remove and Replace Step Flashing: Flashing does not need to be replaced.
• Replace Chimney Crown Fully remove all caps, provide and place 1/8” cold steel plates over openings, and construct new cement crown matching density, thickness and edge profile. Existing crowns are approximately 3’-8” x 2’-4” and 3” thick with a troweled rounded off edge. Cement product shall be exterior rate refractory cement to withstand 2200-degrees F. (min) and meet or exceed ASTM E136.
• Apply water based clear siloxane penetrating water repellant water sealant with to all chimney brick and mortar. Apply ChimneySaver or approved equivalent water repellent product meeting or exceeding the salient characteristics and performance of the basis of design product. Apply per methods, coats, and dry/cure times as called for by product manufacturer’s specifications.
• Other: Decorative metal work on top of chimneys to be removed and refinished with rust inhibiting paint application color flat black. Basis of design paint product shall be
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed.
a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, Page | 11 anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.
1.3 Existing Condition Protections:
A. Preservation of Historical and Archeological Fabric:
i. The Historic and Archeological Data Preservation Act of 1974 provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
ii. IF, in connection with operations under this contract, the Contractor, subcontractors, or employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological remains or data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts not specifically noted within the contract. The Contractor shall immediately suspend all operations in the vicinity and continue work in other areas outside a 50-foot radius of discovery and notify the Contracting Officer immediately. When safe to do so, follow up in writing with photographs within 2 days, giving the location and nature of the findings. No objects of cultural resource value may be removed. Contracting Officer will contact other entities as required.
iii. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with Changes clause.
iv. The Contractor will be responsible for protecting the cultural resources within and adjacent to the project area from damage. In addition, the Contractor will be liable for all damage to the cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or their representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
v. The Contractor agrees to include this language within all subcontracts.
B. The structure involved in the work of this Contract is a designated historic structure listed in the National Register of Historic Places. Every precaution shall be taken by the Contractor to prevent damage to existing historical materials, structural components of the building and to the surrounding area. Should any damage be incurred as a result of the Contractor’s operations at the site, it shall be repaired, or the damaged materials replaced in kind by the Contractor to the satisfaction of the Contracting Officer at no additional expense to the Government.
C. There is no excavation required for this project.
ITEM 2 – PROTECTING EXISTING UTILITIES
Page | 12
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
https://www.nps.gov/fosc/learn/management/superintendent-s-compendium.htm
A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited-service coverage), email and in case of emergency 24-hour contact options for duration of time operations.
B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Contractor cannot work on site on April 11-13 Civil War Encampment Event, 2025, May 19-26 Symbols of Sacrifice, December 1-5 Candlelight Tour.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
7 am to 3:30 pm., Monday through Friday, except when otherwise indicated. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent
Page | 13 from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year’s Day Inauguration Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
• Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to the staging area noted on site plan and to the minimum reasonable footprint to access each building as approved by the COR. The COR reserves the right to impose further limitations if Contractor housekeeping practices prove insufficient. Do not disturb portions of Project site beyond areas in which the Work is indicated. The Contractor shall access the roof by means of scaffolding, ladders, or lifts. If using lifts ground protection mats are required to prevent damage to grounds and buried archeological artifacts. “All access and work on roof shall be within OSHA requirements at all times without exceptions.” All tie offs shall be non-penetrating. Contractor shall submit proposed means and methods to the COR for approval. Demonstrating the least invasive impacts to the historic fabric as reasonably possible.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Do Not disturb site outside of noted disturbance area, including earthwork, and clearing of vegetation, to:
1. Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area. Do not disturb portions of Project site beyond areas in which the Work is indicated.
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 14
Contractor shall provide appropriate matts for equipment on turf areas to reduce soil compaction. Contractor shall remediate soil compaction as directed to do so by the CO/COR.
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract
Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Sanitary Operations:
a. Toilets: Contractor shall be able to use the existing park restroom facilities, specific location to be discussed during the preconstruction meeting. The restroom facilities shall be kept in immaculate condition. At the discretion of Park personnel and/or COR;
contractor may lose the use of the restroom facilities if they are not kept clean and orderly. Restroom use will be a “One strike and you’re out” policy. If restroom privileges are revoked Contractor will be required to provide a toilet for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant protection is not required for this project.
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
Page | 15
5. Temporary Enclosures: Provide and maintain temporary enclosures such as snow fence as required for protection of construction in progress and from access by visitors or staff, other construction operations, and similar activities.
6. Hot Work Permit: Not Required
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area shown in appendix A below may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility.
3.5 Preservation of Natural Features: A. Original stone connecting walkways, curbs, drains, and outbuilding foundation are covered with a layer of sod to provide protection. Driving equipment across these areas may cause resource injury. No heavy equipment will be allowed on the north side of the buildings.
B. Bats pup from around June 1 through July 31. May roost in and around roofing. If work occurs during this time, and the bats are roosting and pupping in the project area, a monitor is needed to insure they do not become displaced and not pup or abandon pups. The bat species is the Northern Long-Eared Bat (Myotis septentrionalis), a listed species.
3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.
3.7 Waste Removal, Recycling, and General Housekeeping:
A. Keep project site in a neat, orderly, and safe condition at all times.
1. Contractor is responsible for providing dumpsters for waste and recycling and for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site.
Coordinate with COR for approved dumpster locations prior to commencing construction.
2. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters.
3. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to the extent possible during this project, recycling material as much as possible within local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
Page | 16
4. For all waste and recycling removals offsite, contractors shall provide estimates and/or tickets to quantify material weights and report back to the park, submit to COR for review and record filing.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated. Contractor will maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR. Contractor will maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. New /Existing Buildings Unoccupied:
1. N/A
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
Page | 17
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA
29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Contractor shall not have personal radios or other media sources, and they shall not be broadcast within NPS property.
B. Noise Control: Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.
C. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
a)
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926
Page | 18
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 19
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain 2 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate, if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a…