Questions_and_Answers_-_Box_Culvert_-_PIRO_0002.pdf

PDF 156 KB Posted

Attached to
Box Culvert Installation Federal contract opportunity
Solicitation number
140P6425B0002
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a Questions and Answers (Q&A) addendum for Solicitation #140P6425B0002, a Box Culvert Replacement Project for the National Park Service's Pictured Rocks National Lakeshore. The Q&A addresses technical specifications for the project, specifically clarifying details about the box culvert structure and hot mix asphalt (HMA) requirements. Key clarifications include confirming the culvert will have a closed concrete bottom with a flow elevation approximately 12" below finished grade, and providing guidance on HMA mix type, thickness, and asphalt cement grade based on Average Daily Traffic (ADT) and regional specifications. The Q&A helps potential bidders understand precise construction requirements and resolve potential ambiguities in the original solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to Box Culvert Installation, newest first.
File Type Posted
Sol_140P6425B0002_Amd_0002.pdf PDF
Sol_140P6425B0002_Amd_0001.pdf PDF
Sol_140P6425B0002.pdf PDF
B08_Solicitation_-_Drawings.pdf PDF
B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
B03_DOL_Wage_Determination.pdf PDF
B08_Solicitation_-_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P6425B0002

Amendment #: 2

Box Culvert Replacement Project – PIRO

Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. In regards to this solicitation for a box culvert on Sand

Point Road, we've seen conflicting information on whether this is an open bottom or closed bottom box culvert. The plans seem to detail a closed while the solicitation calls out a natural bottom. Just looking for clarification.

The box culvert structure is a closed (concrete) bottom as per the construction drawings and should be bid to reflect as such. The reference in the specifications and solicitation of a 'natural bottom' reflects the culvert box flow elevation approximately 12" below finished grade at the outfall of the culvert. This will allow natural flow and deposition of sediment post-construction replicate a naturalized bottom over the concrete in restoring the connectivity between the wetland and the lake.

2. The plans indicate that the HMA is 3” thick, but do not specify the type of mix or the asphalt cement to be utilized. I would assume it is HMA 4EML with either 58-24 or 58-28 AC.

Per Specification Section 32 12 16,

2.2 A., Follow the mix in the column

denoting Average Daily Traffic (ADT) of 301-700 and Superior region Binder Grade in the table provided within the Local Agency Programs Hot Mix Asphalt Selection Guidelines called out in the specification (HMA Selection Guidelines 04.02.2024) Base, leveling and top layer thickness and types as called out in Specification Section 32 12 16,

3.1 A. through E.

3. The specs are calling out 4 inches of 3EML and 6 inches of 4EML in section 32 12 16 – 1 items B, C, & D

See response to #2

4. Which mix is wanted, what AC, and how thick they want it?

See response to #2

5.

6.

7.

8.

9.

10.