Questions_and_Answers_-_USCG_-_PIRO_0001.pdf
PDF 102 KB Posted
- Attached to
- Rehabilitation of Coast Guard Station
- Solicitation number
- 140P6424B0002
About this file
This document contains Questions and Answers related to Solicitation #140P6424B0002 for the Rehabilitation of Coast Guard Station project at Pictured Rocks National Lakeshore in Michigan. The key details are:
The solicitation requires the contractor to provide all labor, materials, tools, and equipment necessary for the rehabilitation work, which includes selective demolition, siding, roofing, window replacement, shutters, paint removal and application, woodwork, and some plaster/drywall. The project magnitude is between $500,000 and $1,000,000, and it is a firm-fixed price contract with Construction Wage Rate Requirements for Alger County, MI. The NAICS code is 238990, and the project is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. The questions and answers address specifics related to the EPDM roof membrane, chimney cap replacement, and removal of handicap grab bars in the restrooms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6424B0002
Amendment #: 0001
Coast Guard Station Rehab Project – PIRO
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response
1. The EPDM Roof membrane on the porch roof and on the tower walkway need to be properly flashed under the shake siding after the aluminum siding is removed.
The EPDM must project at least 6” up the wall surface under the shake siding and be sealed around all vertical corners.
2. The exterior edge of the EPDM on the tower walkway is attached to an aluminum flashing and must be repaired with the aluminum flashing removed if the EPDM membrane is not replaced in full.
The profile of the Tower edge must be repaired to original design as shown in provided original drawings.
3. The EPDM on the porch roof is attached to an aluminum flashing along the sides and front edge this aluminum can remain if the EPDM flashing under the wall shingles can be accomplished without a full roof replacement.
4. The chimney cap replacement and capping of the two chimney vents may be completed with one solid chimney cap eliminating the need for color matched caps over the two openings.
This cap may be poured in place or precast concrete grouted in place.
5. What should be done with the handicap grab bars in the restroom on the first floor
The handicap grab bars over the two toilets on the first floor may be removed and given to the COR for reinstallation.