Questions_and_Answers_0002.pdf
PDF 188 KB Posted
- Attached to
- Enhance Landscape Federal contract opportunity
- Solicitation number
- 140P6423Q0075
About this file
This document contains questions and answers related to Solicitation #140P6423Q0075 from the Department of the Interior National Park Service Midwest Region to enhance landscaping at a memorial site. The questions and answers provide specifications for the landscaping work, including a preference for Type 1 topsoil, brown mulch between 2-4 inches deep in plant beds, allowing equipment storage on site with a designated area, and using the plant types and bed layout shown in the blueprint attached to Amendment 0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6423Q0075_Amd_0002.pdf | ||
| Blueprints_0001.pdf | ||
| Sol_140P6423Q0075_Amd_0001.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Price_Schedule.pdf | ||
| Statement_of_Work.pdf | ||
| Provisions_to_be_Completed.pdf | ||
| Sol_140P6423Q0075.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6423Q0075
Amendment #: 0001
Enhance Landscape – PEVI
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response
1. What grade of topsoil is required (ie grade 1, 2 or 3)? Type 1 soil is preferred.
2. What type of mulch and how many inches deep of mulch is required in the plant bed?
Refer to Note 10 on Page 4 of the Blueprint provided in Amendment 0001.
3. Will the vendor be allowed to store equipment on the site during the work performance, and if so what are storage requirements?
Equipment storage can be on site.
COR will designate an area for equipment.
4. Any preference on the color of mulch we use for the beds?
Natural color of mulch preferred.
(Brown)
5. Do you have any preference for the types of ground cover plants you want us to use? Or should we just put our own design/ layout together?
Refer to Page 3 of the Blueprint provided in Amendment 0001.
6. Is there a schematic drawing of the memorial grounds that shows the dimensions of each flower bed plot?
Refer to Page 3 of the Blueprint provided in Amendment 0001.
File details come from the government source that posted it. Updated .