Questions_and_Answers_0001.pdf
PDF 101 KB Posted
- Attached to
- Macroinvertebrate Sampling Federal contract opportunity
- Solicitation number
- 140P6423Q0016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6423Q0016_Amd_0003.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| Sol_140P6423Q0016_Amd_0002.pdf | ||
| Revised_SOW_-_Macroinvert_Sampling_0002.pdf | ||
| NPS_SACN_2016-2021_macroinvertebrates_final_0002.xlsx | XLSX spreadsheet | |
| Weigel_Dimick_river_invert_IBI_2011_0001.pdf | ||
| Revised_Technical_Questionnaire_0001.pdf | ||
| Blocksom_Johnson_2009_Ecological-Indicators_withErratum_0001.pdf | ||
| Revised_SOW_-_Macroinvert_Sampling_0001.pdf | ||
| Revised_Technical_Questionnaire_0001.docx | DOCX document | |
| Sol_140P6423Q0016_Amd_0001.pdf | ||
| Sol_140P6423Q0016.pdf | ||
| B08_Solicitation_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Technical_Questionnaire.pdf | ||
| B08_Solicitation_-_Statement_of_Work.pdf | ||
| B08_Solicitation_-_Technical_Questionnaire.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6423Q0016
Amendment #: 0001
Macroinvertebrate Sampling – GLKN
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response 1.
Are there any certifications required for the Contractor lab to perform this work?
Society for Freshwater Science taxonomic certification program or equivalent experience (please explain in bid).
2.
The Technical Questionnaire available on the SAM.gov website states that there is a “Past Performance” questionnaire to fill out. Is there a specific “Past Performance” questionnaire available or should we describe our past experience in our own created document and provide details as outlined on page 13 of the “SOL_140P6423Q0016.pdf” document provided on SAM.gov?
Please submit only Prior Experience as described on pages #12-13 of the RFQ submission section.
No Past Performance Questionnaire is required for this RFQ – only prior experience per those pages mentioned above.
3.
Will all samples be sent at once in a batch or will samples be sent at different times throughout each fiscal year?
All samples will be sent in by individual parks but within a 60-day window, typically in October and November, in the same federal fiscal year.
4.
Will whole Hester-Dendy traps be sent to the Contractor lab to process or will the traps already be disassembled and contents placed into a jar by NPS and sent to Contractor lab?
Contents (a clean sample, with most foreign matter removed) will be placed into a jar by NPS and sent to vendor lab.
5.
The SOW states “Sample processing efforts are written to project-specific sample log sheet”. Can you provide more information on what efforts need to be described and will the Contractor lab be provided these log sheets?
NPS will furnish the vendor with a log sheet with preferred formatting, that will also allow the vendor to reference the SOW for this project.
6.
The SOW states “Taxonomies, respective enumerations and respective taxonomic references are written to a standard laboratory bench sheet”.
Will the Contractor lab be provided these bench sheets?
Yes. See #5.
7.
WDNR protocols state that non-wadeable mIBI values and component metrics are calculated by DNR BugProgram and SWIMS (Large River Macroinvertebrate Sampling V2.0 - DNR Water Quality Monitoring Program, 2015). Will Contractor lab have access to the BugProgram and SWIMS to enter the data results or will mIBI and metrics need to be calculated by other means?
No. Data simply need to be reported to NPS as an electronic data deliverable and not BugProgram or SWIMS. For mIBI and metrics the vendor will be responsible for calculating them the same way they are done in the WDNR BugProgram. Methods/code shall be provided to NPS.
8.
If Contractor lab will not have access to BugProgram and SWIMS, what sources will need to be used to calculate mIBI and determine metrics (eg tolerance values, functional feeding group designations, etc)?
The vendor lab will need to calculate the same metrics and mIBI as in Wiegel and Dimmick (2011) and Blocksom and Johnson (2009), which will be provided as part of the solicitation.
9.
Will Contractor lab be granted access to the previous site data in SWIMS during sample analysis?
Yes. Site-specific data will be available upon request.
10.
What is the turnaround time for sample results from Contractor lab?
Within 10 months upon receipt of samples by the laboratory.