Questions_and_Answers_0001.pdf

PDF 1 MB Posted

Attached to
FENCE REPLACEMENT Federal contract opportunity
Solicitation number
140P6421R0022
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to FENCE REPLACEMENT, newest first.
File Type Posted
Sol_140P6421R0022_Amd_0001.pdf PDF
Technical Questionnaire.pdf PDF
Statement of Work.pdf PDF
Technical Questionnaire.docx DOCX document
Sol_140P6421R0022.pdf PDF
Updated - COVID-19 Mask Policy.pdf PDF
Past Performance Questionnaire.pdf PDF
Wage Determination.pdf PDF
Past Performance Questionnaire.docx DOCX document
Bid Schedule -Fence Replacement.pdf PDF
Bid Schedule -Fence Replacement.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fence Replacement Project – CUVA Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. Is the current fence structure (Post) secured in the ground with concrete?

One post was checked with no sign of concrete. All other posts are unknown.

2. For the 4- Railing Fence Would 1"x6" pressure treated pine (same as post) be an acceptable replacement for the rough sawn white oak lumber?

No, pressure treated pine will not be acceptable for the 1”x6” rails.

3. Is there a detail on the fence for dimensions and material?

See attached images.