B09_Solicitation_Amendment_3_Attach_2_Submittal_List_0003.pdf

PDF 84 KB Posted

Attached to
MIMI Seal and Coat 3 Asphalt Parking Lots
Solicitation number
140P6326Q0014
Issued by

About this file

This is a Submittal List for a federal construction project (MIMI, PMIS 323197) involving fog seal application to three parking lots. The document specifies required submittals that the contractor must provide throughout the project lifecycle, organized by specification section and paragraph number, with designations for informational versus action items.

The submittal requirements cover general construction administration items including photo documentation of existing conditions, construction progress, and completion; accident prevention plans; project superintendent designation; construction schedules; schedules of values; subcontractor lists and labor standards compliance documentation; quality control and waste management plans; construction permits; and warranties and closeout submittals. Material-specific submittals for Section 321216 include product data and assurance/control documentation for crack sealant, fog seal emulsion, and sand for fog sealing. Section 321723 requires product data and assurance/control documentation for the fog seal application. The chart uses "X" markings to indicate whether each submittal requires certification/lab testing, ReportCals or plans, manufacturing data and instructions, shop drawings, or samples. Several items are marked for both informational review and action/approval by the project team.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

ER

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

011000 3.9.B,C,D Photo Documentation - Existing Condition, Construction Progress, and Completion Images X

7.2 Accident Prevention Plan X

9.1.C Letter Designating Project Superintendent X

Construction Schedule X

Schedule of Values X

Accident Prevention Plan X

List of Subcontractors X

Subcontractor compliance w/ labor standards X

Quality Control Plan X

Waste Management Plan X

List of Construction Permits X

11.5 Warranties & Closeout Submittals X

321216 4 Crack Sealant X X

Fog Seal Emulsion X X

Sand for Fog Sealing X X X

321723 4.4 Product Data X X X

Assurance / Control X

SUBMITTAL LIST

Spec. Sec. Par. No. Description

INFORMATIONAL ACTION

MIMI, PMIS 323197, Fog Seal Three Parking Lots

SUBMITTAL REQUIREMENTS (indicate with an "X")

Submittal List Template

File details come from the government source that posted it. Updated .