1. -On documents 03, 04 & 06 it says the existing rectifier components need to be sent to the rectifier shop for ‘rehabilitation’? Does the client have a specific shop this needs to go to? I see reference to the (Specification 13 47 13 section 2.2 A-W), can I get a copy of the CP specs please?
Answer: The internal rack frames for rehabilitation, the park does not have a specific shop identified. Please reference original specifications.
2. -Where will the new AST be going and what is the size? I do not see it referenced on the plans that we have, 01-06.
Answer: If AST is referencing an “Above Ground Storage Tank”, there is no storage tank. The cathodic protection system is for the underground metal components of the Launch Control Center at Delta-01 and the missile silo at Delta-09.
3. -Builds for utilities that the U.S Air Force Installed.
Answer: Reference utility maps provided for Delta-01 LCF and Delta 09 LF. See pgs 2-5
| Atch 2 Questions Answers |
| Atch 3 Utility Maps Delta 01 and 09 |
| Oce077 |
| Picture 1 |
| Picture 2 |
| Picture 3 |
File details come from the government source that posted it. Updated .