140P6321B0003 Market Survey_1.docx

DOCX document 39 KB Posted

Attached to
Mount Rushmore National Memorial - Renovate Water Storage Tanks
Solicitation number
140P6321B0003
Issued by

About this file

This market survey is seeking information from contractors interested in renovating three underground water storage tanks at Mount Rushmore National Memorial in Keystone, South Dakota. The project includes removing interior coating from tanks sized at 75,000, 125,000, and 500,000 gallons, inspecting and repairing concrete surfaces, and applying new coating systems. Additional work involves replacing existing pipes and valves, blasting and recoating pipes and valves and roof vents, modifying hatches, and replacing a level sensor with control cables and conduit. Interested contractors must demonstrate experience with similar projects including coating removal and application, transducer equipment installation, and tank disinfection per drinking water standards. Responses are requested by January 19, 2021 and should include company information, size status and certifications, bonding capacity, and capabilities statement. The project value is estimated between $1,000,000 to $5,000,000 with NAICS code 237110.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT (MARKET SURVEY)

Mount Rushmore Water Tanks Renovation (Reference 140P6321B0003)

The National Park Service (NPS) is conducting a market survey to determine the interest and capability of vendors for a possible upcoming project. All costs associated with providing information in response to this market survey shall be the responsibility of the firm. Any information submitted is voluntary. The Contracting Officer will make an acquisition strategy decision based on the results of this market survey and a future solicitation may be issued as unrestricted without further consideration.

We are seeking to determine contractor interest in support of the renovation of three (3) underground water storage tanks, (75K, 125K, and 500K gallon tanks) at Mount Rushmore National Memorial located in Keystone, SD 57751.

Project Schedule: We anticipate that work will begin July 2021 and that the project will be broken into 3 phases for a total performance period of 230 calendar days. Due to winter weather conditions, a winter break is also anticipated.

This is not an invitation for bid (IFB) or request for proposal (RFP) and does not constitute any commitment by the Government to issue any solicitation. All interested firms must respond to future solicitation announcements separately from responses to this market survey. Any solicitation that may be issued will be posted on beta.SAM.gov, (www.beta.SAM.gov).

Project Description: The work of the project consists of remove the interior coating of the existing 75K, 125K, and 500K gallon water reservoir tanks. Once coating is removed, the inter concrete surfaces will be inspected to determine the extent of damage and necessary repairs. New coating systems will be applied to the interior walls, columns, floors, beans, and roof of each reservoir, except the floor of the 75K and 125K gallon tanks. Existing pipes and valves to be replaced in-kind. Pipes, valves, and roof vents to be blasted and recoated. The hatches on the 75K and 125K gallon reservoirs and vault walls will be modified. The 75K gallon tank’s level sensor will be replaced with control cables and conduit included. All plumbing and reservoir interiors will be inspected prior to putting reservoirs back in service.

The government’s expectation is that interested contractors must be able to demonstrate that they have the capability to use employees/subcontractors that have completed projects of similar size and scope to include removal of tank coat and reapplication of coating, installation of transducer equipment and controls, and disinfection of tanks per drinking water standards.

Magnitude: The magnitude of construction is between $1,000,000 and $5,000,000

The associated NAICS code is 237110, Water and Sewer Line and Related Structures Construction. The small business size standard is $39.5 million.

Interested firms must submit the following information:

Name of Firm

Address

Phone Number

Email Address

DUNS Number

Size status/SBA certifications. Mark all that apply. See FAR Part 19, Small Business Programs.

☐ Small Business (meets size standard for NAICS) ☐ Women Owned Small Business (WOSB)

Is your WOSB status documented in certify.sba.gov?
☐ Yes
☐ No

☐ HUBZone ☐ Service Disabled Veteran Owned Small Business (SDVOSB) ☐ 8(a) ☐ Other Than Small

Characterize your firm’s bonding capacity including the ability to obtain additional bonding:

Describe the portion or elements of the work that would be performed by your firm’s employees:

Capability statement - A brief summary of capabilities:

All responses must be submitted via email not later than 12:00 Noon MST, January 19, 2021. Email address: julie_gavin@nps.gov. Include the reference number (140P6321B0003) in the subject line.

File details come from the government source that posted it. Updated .