Sol_140P6224Q0039_Amd_0003.pdf
PDF 88 KB Posted
- Attached to
- Fire System Inspections - Wilson's Creek NB Federal contract opportunity
- Solicitation number
- 140P6224Q0039
About this file
This document is Amendment 3 to Solicitation 140P6224Q0039 for fire alarm system inspection and testing services at Wilsons Creek National Battlefield in Republic, MO. The amendment provides responses to two questions received from potential offerors. The first question asks for the building map referenced in the Statement of Work, which the government has provided. The second question asks whether the fire suppression system is a dry pipe or glycol-based system, and the government clarifies that it is a dry pipe system with a glycol-based liquid pushed by nitrogen. The amendment also states that the scope of work is only for the annual inspections and testing, and that the 5-year inspections are not included. Contractors are reminded to acknowledge receipt of the amendment with their quote submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment04_BuildingMap_0003.pdf | ||
| Sol_140P6224Q0039_Amd_0002.pdf | ||
| Sol_140P6224Q0039_Amd_0001.pdf | ||
| Attachment01_StatementOfWork.pdf | ||
| Attachment03_WageDetermination.pdf | ||
| Attachment02_PriceSchedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6224Q0039 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
Omaha NE 68102 601 Riverfront Drive DOI, NPS, MWR - Missouri MABO NPS, MWR - Missouri MABO
08/15/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/31/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment three is to provide questions received and the government responses to those questions:
Q1: Please provide the "building map" that is referenced in SOW 1.A & B
A1: See attachment 04 for building map.
Q2: In SOW section 2, they refer to "testing of one dry pipe glycol-based fire suppression system". Is this a dry pipe or a glycol -based system?
A2: The pipes are considered a dry pipe system. With that being said they are a glycol based liquid system push by nitrogen system. The pipes are currently filled with nitrogen and the glycol is stored in tanks in the basement. Once the sprinkler head is triggered the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cecilia Mitchell
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6224Q0039/0003 nitrogen pressure in the pipes is released and a valve in the basement opens up allowing the glycol-based liquid to be pushed up through the pipes by a second nitrogen tank.
Q3: Are we to assume that all testing is that required for Year 1? Appendix B refers to systems requiring Annual and 5-year inspections, but fails to differentiate; is the intent to assume that everything is due for its 5-year inspection?
A3: The scope of this work is only the Annual
Inspections/Testing. The items listed in Appendix
B are all related to the Annual
Inspections/Testing. The title of the chart reads
"Appendix B - Fire Systems Requiring Annual and
5-Year Inspections". The "5-Year" language was an oversight. All 5-year inspections/testing is current and is out of scope for this project.
Contractors are reminded that they must sign and submit all amendments with their quote.
All other terms and conditions remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)