This document is a solicitation amendment for a Request for Quotes (RFQ) for the procurement of equipment for the Ozark National Scenic Riverways. The key details are:
The purpose of this amendment is to: (A) Remove the requirement for installation of the equipment, (B) Revise the delivery date to November 15, 2024, and (C) Revise the award selection criteria to be based on price, technical, and delivery date. The solicitation is seeking quotes for a drum mulcher, rooftop cooler, forestry kit, and engine compartment seal kit. All quoted equipment must conform to the provided specifications. Quotes will be evaluated on price, technical capability, and delivery date, with award made to the best value offer. The solicitation closing date has been extended to August 21, 2024 at 12:00 PM CT. This is a total small business set-aside procurement issued by the Department of the Interior, National Park Service, Midwest Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6224Q0033_Amd_0003.pdf | ||
| Attachment04_Specifications-REVISED_0002.pdf | ||
| Attachment03_PriceSchedule-REVISED_0002.docx | DOCX document | |
| Sol_140P6224Q0033_Amd_0001.pdf | ||
| Attachment01_Specifications.pdf | ||
| Attachment02_PriceSchedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6224Q0033 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
Omaha NE 68102 601 Riverfront Drive DOI, NPS, MWR - Missouri MABO NPS, MWR - Missouri MABO
08/12/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/11/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OZAR drum mulcher, rooftop cooler, forestry kit, engine compartment seal kit with installation
The purpose of amendment two is to:
A. Remove the requirement for installation of equipment from the solicitation. All references to installation of equipment are deleted from the solicitation and revised specifications are provided. See Attachment 03_Specifications-REVISED.
B. Item (vii) of the soliciation, delivery date, is revised to read as follows:
(vii) All equipment must be delivered to Ozark National Scenic Riverways by November 15, Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cecilia Mitchell
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6224Q0033/0002
2024.
C. The award selection criteria, item (ix) of the soliciation, are revised to read as follows:
(ix) Award will be made in accordance with FAR
Part 13 to the quoter that provides the best value to the government based on price, technical, and delivery date. The solicitation is not stating nor is it required to state the relative importance assigned to each evaluation factor and/or sub factor (FAR 13.106-1(a)(2)) listed below. All quotes will be evaluated on price, technical, and delivery date as detailed below:
1. Price. Complete Attachment 03 - Price Schedule
- REVISED or provide a comparable price breakdown.
2. Technical: Technical is the factual documentation of the firm's ability to meet the specifications.
a) Provide the brand, model, and specification lists for each piece of equipment. All quoted equipment must conform to the specifications (see
Attachment 1). If quoting products that are equal to the specified brand name products, provide a complete a side-by-side comparison list identifying the equivalent specifications.
b) Responses to this RFQ must include all items listed in the specifications. Partial quotes will not be considered.
3. Delivery Date: Delivery date is the date by which all equipment will be delivered to Ozark
National Scenic Riverways. Quoters shall provide the date by which all equipment will be delivered to the park.
D. Add Attachment03_PriceSchedule-REVISED.
E. Extend the solicitation closing date to
08/21/2024 at noon CT.
F. Add FAR clause 52.223-1 Biobased Product
Certification.(May 2024):
As required by the Farm Security and Rural
Investment Act of 2002 (7 U.S.C. 8101(4)) and the
Energy Policy Act of 2005 (7 U.S.C.
8102(a)(2)(F)), the offeror certifies, by signing
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6224Q0033/0002 this offer, that biobased products (within categories of products listed by the United
States Department of Agriculture in 7 CFR part
3201, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.
(End of clause)
Quoters are reminded that they must sign and submit all amendments with their quote.
All other terms and conditions remain unchanged.
Period of Performance: 08/15/2024 to 12/31/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .