Sol_140P6223Q0012_Amd_0001.pdf

PDF 139 KB Posted

Attached to
Reproduction Historic Carpet for Fort Smith NHS
Solicitation number
140P6223Q0012
Issued by

View the file

Other files

File Type Posted
Sol_140P6223Q0012_Amd_0004.pdf PDF
Sol_140P6223Q0012_Amd_0003.pdf PDF
Sol_140P6223Q0012_Amd_0002.pdf PDF
Attachment01-SOW_PR0040621524.pdf PDF
Attachment02-PastExperience_PR0040621524.docx DOCX document
Sol_140P6223Q0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P6223Q0012 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PMM

Omaha NE 68102 601 Riverfront Drive DOI, NPS, MWR - Missouri MABO NPS, MWR - Missouri MABO

06/12/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/31/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Reproduction historic carpet with installation at FOSM

The purpose of amendment one is to provide:

1. Questions received and the government responses to those questions. See items 1a-1e on page three of this amendment.

2. A revised price schedule. The price schedule on page 5 of the solicitation is deleted and replaced with the price schedule in item 2 on page three of this amendment. All vendors must complete and submit the revised price schedule with their quote.

Quoters are reminded that they must acknowledge all amendments with their quote.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Cecilia Mitchell

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6223Q0012/0001

All other terms and conditions remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1. The statement of work is revised per items 1 through 5 below:

a. Delete all references to an “additional 10% surplus yardage” and replace each of them with “one 10-yard long strip.”

b. Delete the following:

i. Page 2, Section 2.0, ninth bulleted item: Remove all items from the area to be carpeted to the other side of the room.

ii. Page 2, Section 2.0, tenth bulleted item: Remove and dispose of existing carpet and padding, salvaging two 36-inch x 36-inch sections for the park archives.

iii. Page 2, Section 2.0, twelfth bulleted item: Replace all furnishings to their original location.

iv. Page 3, Section 4.0, Item 9: The Contractor will remove all furniture from the area of installation to be stored at the opposite end of the room.

v. Page 4, Section 4.0, Item 11: The Contractor will remove and dispose of the current carpet and padding, salvaging two 36-inch x 36-inch sections for park archives.

vi. Page 4, Section 4.0, Item 13: After installation is complete, the Contractor will replace all furnishings to their original location.

vii. Page 5, Third bulleted item: Contractor to remove furnishings to opposite side of the room prior to installation, replace furnishings after installation complete.

c. Replace “shall’ with “may” in the following sentence found on page 3, Section 4.0, Item 1: “The Contractor shall travel to Fort Smith National Historic Site to examine and obtain accurate measurements of the floor behind the bar. Measurements provided in this document are for reference purposes only.” The revised sentence is as follows: “The Contractor may travel to Fort Smith National Historic Site to examine and obtain accurate measurements of the floor behind the bar. Measurements provided in this document are for reference purposes only.”

d. All references to “hand sewn,” “hand-sewn” and “hand sewing” are revised to read “hand or machine sewn,” “hand- or machine-sewn” and “hand or machine sewing.”

e. Page 5, “Installation with tack strips” is revised to read “Installation with tack strips or carpet strips.”

2. The price schedule on page 5 of the solicitation is deleted and replaced with the price schedule below:

Description Price Carpet fabrication $ Padding $ Installation $ Sewing/seaming of carpet strips $ Travel to Fort Smith National Historic Site.

Travel to Fort Smith NHS is not required, but contractor must verify the amount of carpet to be provided for the Courtroom.

TOTAL $