B08_Solicitation_Attachment_6_-_Technical_Approach.pdf
PDF 37 KB Posted
- Solicitation number
- 140P6218R0018
About this file
Attachment 6 - Technical Approach
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P6218R0018 ATTACHMENT 6
TECHNICAL APPROACH
INSTRUCTIONS AND PURPOSE:
The Offeror is to submit a written Technical Approach as part of its proposal package. The Technical Approach will be evaluated by the Government to assess the Offeror’s technical understanding of the work to be performed, the general and local conditions which exist at the contract site(s), and the method, means, resources to be used, and the timeline, in the performance of the contract. At a minimum, the factors the Offeror is to address in its Technical Approach are listed below. Be as specific as possible.
Your written Technical Approach is limited to a maximum of three (3) 8 ½” x 11” single-sided pages.
1. Labor resources for performing the work to include size of crew, and positions in which they will be performing. When indicating positions, utilize the Occupation Titles identified in the Wage Determination, Attachment 3. Not all positions on the Wage Determination will be used.
2. All equipment, to include hand equipment, to be used in performance of the work. Quantify where feasible.
3. Your strategy in carrying out the work.
4. Will you be removing some of the cut cedar from the contract site?
5. Anticipated vehicles to be used in performance (if applicable).
6. Explain how you will make access to the site(s).
7. Where and how you will stage equipment.
8. The estimated number of calendar days to complete each of the seven priority locations.
9. Identify risks, obstacles or concerns you may have or expect to encounter in performing the work (if applicable) and how will you mitigate those risks or overcome the obstacles or concerns.
10. Submit copy of Offeror’s Safety/Accident Prevention Plan and Communications Plan.
11. Any additional factors you wish to address.
File details come from the government source that posted it.