B09_Amendment_0003_Revised_(Rev_2)_Attachment_7_-_Instructions_for_Submission_of_Quotation.pdf
PDF 98 KB Posted
- Attached to
- Roads Repair & Grading at Buffalo National River
- Solicitation number
- 140P6218Q0060
About this file
Amendment 0003_Revised (Rev 2) Attachment 7 - Instructions for Submission of Quotation
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140P6218Q0060 ATTACHMENT 7 (Rev 2) (Revised as per Amendment 0003)
Instructions for Submission of Quotation
QUOTATIONS WILL ONLY BE ACCEPTED IF SUBMITTED ELECTRONICALLY BY E-MAIL.
ALTERNATIVE LINE ITEM QUOTES ARE NOT TO BE SUBMITTED.
1. Documents/Information To Be Submitted With Quotation: At a minimum, the following documents/information shall be completed/provided and submitted with your quotation.
Clauses and Provisions indicated below which are incorporated into the solicitation by reference rather than full text, can be accessed online, in full text, at:
For FAR Clauses and Provisions – 52.: https://www.acquisition.gov/?q=browsefar For DOI Clauses and Provisions – 1452.: http://farsite.hill.af.mil/VFDIARA.HTM
a. Quoter should submit all documents in .pdf format to the greatest extent practical.
b. Standard Form 1442, Solicitation, Offer, Award Form: Complete Blocks 14 through 20C.
Be sure and include Quoter’s total price for each of the individual Line Item(s), Line Items 00010 through 00050, in the Amounts field of Block 17.
c. Complete Attachment 4, Quoter’s Price Schedule by entering the individual pricing for each road, the total price for each Line Item, fill-in the percentages of work that will be completed by Contractor and Subcontractor(s), and then sign, date and submit with quotation package.
d. Section K, Provision 52.204-8, Annual Representations and Certifications Quoter is to indicate which of the two paragraphs in 52.204-8 apply --- Either (b)(2)(i), or
(b)(2)(ii).
- If paragraph (b)(2)(i) applies, submit first page of your firm’s Representations and
Certifications from the www.sam.gov website
- If paragraph (b)(2)(ii) applies, Quoter is to have completed the applicable individual representations and certifications and include them with his/her quotation.
e. Section L Provision 1452.215-71 – Use and Disclosure of Proposal Information –
Department of the Interior (if applicable)
f. Complete and submit Attachment 5, Financial and Technical Capability Submittal, along with the additional documents/information requested by that Attachment.
g. Provide and submit the information requested by Attachment 6, Past Performance.
h. Section M, Evaluation Factors for Award - Provide the information and documents requested in Paragraphs (c)(1) and (c)(2) if not included elsewhere in documents requested in these Instructions.
https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/VFDIARA.HTM http://www.sam.gov/
i. Any other information or documents requested by the solicitation that are applicable to the Quoter’s quotation. See SECTION L, Provisions 52.215-1 and 52.236-28.
j. Acknowledgment of all Amendments issued against this solicitation.
2. Point of Contact: The Contracting Officer for this solicitation is Kathryn M. Logsdon, at telephone number (217) 391-3225, or by e-mail at kathryn_logsdon@nps.gov.
3. Amendments to Solicitation: It is the responsibility of the Quoters to monitor the FBO and
FedConnect websites to download and acknowledge all amendments issued against the solicitation.
https://www.fbo.gov OR https://www.fedconnect.net
4. System for Award Management (SAM) and Online Representations and Certifications: All
Quoters are to have a Dun & Bradstreet number, be registered and active in the System for Award Management (SAM), have a NAICS Code of 237310 listed in their SAM profile, have completed their Online Representations and Certifications, and be a small business concern, in order to be awarded a contract; therefore, if you have not yet completed these requirements, it is strongly advised that you do so at this time. Failure on the part of the successful Quoter to have these requirements fulfilled by the time the Contracting Officer makes award may result in award of the contract being made to the next otherwise successful Quoter. Access to the System for Award Management (SAM) website can be made at https://www.sam.gov
5. Explanation to Quoters:
a. Quoters may request an explanation or interpretation of the solicitation, or its attachments by contacting the Point of Contact named in paragraph 2 above.
b. When sending a question(s) via e-mail, prospective Quoters are requested to include the solicitation number and contract title in the subject line of the e-mail and the Company’s full name and address within the body of the message. Questions are to be submitted no later than 10:00 a.m. central time on Monday, August 20, 2018.
6. Delivery of Quotations:
a. Quotation packages are to be received by the Contracting Officer no later than
Friday, August 24, 2018 at 3:00 p.m. central time. Failure to submit your quotation package so that it is received by this time and date may result in the quotation not being considered.
b. Quotations are to be e-mailed to: kathryn_logsdon@nps.gov Facsimile quotations will not be considered.
https://www.fbo.gov/ https://www.fedconnect.net/ https://www.sam.gov/ mailto:kathryn_logsdon@nps.gov
7. Notice of Pre-Award Survey:
a. No award shall be made unless the Contracting Officer can make an affirmative determination of responsibility of the prospective contractor as per the standards identified in FAR Subpart 9.1. Quoters are advised that this is accomplished through a pre-award survey which may require the prospective contractor to provide additional information or documentation as requested by the Contracting Officer. Areas of interest on this survey may include, but are not limited to the following, with regard to the prospective contractor:
(1) Have adequate financial resources to perform the contract, or the ability to obtain them.
(2) Be able to comply with the required delivery date, taking into consideration all existing commercial and governmental business commitments.
(3) Have a satisfactory performance record.
(4) Have a satisfactory record of integrity and business ethics.
(5) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them, including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors.
(6) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
(7) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
b. Quoters are advised that accomplishment of this survey is a part of the determination of responsibility process and is not to be construed that a request to the prospective contractor for additional information and documents is an indication that he/she will receive the resultant award.
8. Compliance: By submitting a quotation, the prospective contractor agrees to comply with all terms and conditions as set forth in the solicitation and amendments issued thereto.
END OF ATTACHMENT
File details come from the government source that posted it.