Questions and Answers from the Site Visit on 31 May 2018 – ULSG – Painting
Question: Can the furniture in the rooms be moved to the center of the room or removed completely?
Answer: Yes. The contractor’s on-site superintendent will need to coordinate in advance with the COR.
Question: Will the books in the library need to be placed back on the shelves in the order and shelf location they are at currently?
Answer: Yes. They will need to be placed back in the order and location they are currently.
Question: Is the Barn to be painted the same color it currently is?
Answer: Yes, the same color.
Question: The SOW mentions applying as many coats of paint as needed to cover. What is meant by that and what is expected from the contractor?
Answer: The contractor is responsible for ensuring the walls and ceilings are coated with the new paint for complete coverage.
Question: Is there storage space within the building (Visitor Center)?
Answer: Yes, minimal. See Attachment 1, page 4 of 8, 6th bullet statement explains the storage.
Question: The hangers for the pictures, can they be left and painted over?
Answer: Yes. Preexisting holes will need to be repaired before painting.
Question: Can the painting inside the Visitor Center be done at night?
Answer: The hours provided for the work are to be those stated in the SOW, plan on those hours only.
M-F, 7Am – 5 PM, No Holidays without prior permission (approval) per SOW page 2 of 8, paragraph 5.1.
Question: Is it possible to provide a drawing of the floor plan for the building to assist in estimating square footage?
Answer: Yes. A file will be provided via amendment.
Question: Please clarify if the project is tax exempt?
Answer: Yes. We have a tax exempt certificate for Missouri.
Question: Does Davis Bacon apply to this project?
Answer: Yes.
Question: For the exterior, what is the intent of requiring brush? Can the first coat be rolled? Is rolling with a brush finish acceptable?
Answer: The intent is to impart the historic surface texture. The exterior buildings only brushed with no larger than a 5" brush.
Question: Confirm if there is any known lead paint.
Answer: No lead paint.
Question: Please clarify the working hours?
Answer: 7 am to 5 pm
140P6218Q0020 Attachment 8 Questions and Answers
Question: Will the site remain open during the project?
Answer: Yes
Question: Does the project require state or local permits?
Answer: No