B11_Site_Visit_-_QA_0001.docx

DOCX document 54 KB Posted

Attached to
FOSC - Rehab Dragoon Barracks Federal contract opportunity
Solicitation number
140P6024Q0028
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document contains questions and answers related to a contract opportunity for the rehabilitation of the Dragoon Barracks at the Fort Scott National Historic Site. The key details are:

The contract is for the rehabilitation of the Dragoon Barracks, identified as project 140P6024Q0028. The contracting agency is the Department of the Interior National Park Service Midwest Region. The questions address whether an engineering survey is required, and details around a required site enclosure fence, such as the length, duration, and type of fence posts. The answers indicate that an engineering survey is not required by a licensed engineer, but must be performed by a knowledgeable person, and that a site enclosure fence is required, with the contractor responsible for determining the specifics. No additional details on pricing, response dates, or set-asides are provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to FOSC - Rehab Dragoon Barracks, newest first.
File Type Posted
B11_Site_Visit_Attendance_0001.pdf PDF
Sol_140P6024Q0028_Amd_0001.pdf PDF
B08_Solicitation_-_Att_4_-_TQ.docx DOCX document
Sol_140P6024Q0028.pdf PDF
B08_Solicitation_-_Att_1_-_Specifications.pdf PDF
B08_Solicitation_-_Att_3_-_PPQ.doc DOC document
B08_Solicitation_-_Att_2_-_DOL_Wage_Determination.pdf PDF
B08_Solicitation_-_Att_5_-_Submittal_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

CONTRACTING OPERATIONS - CENTRAL

1849 C Street NW Washington, DC 20240

Questions/Answers PARK: Fort Scott National Historic Site PROJECT TITLE: Rehab Dragoon Barracks – 140P6024Q0028

1. Within the specifications page 18 1.4 Informational Submittals A. Engineering Survey.

We discussed this and since we are not altering the structure of the building, merely removing plaster, and installing sheetrock, that we DO NOT need a licensed engineer to perform a survey.

We can provide this survey, but the COR hosting the site visit, the other contractor that attended the site visit, and myself all questioned the need for it given the nature of the project. Can you advise whether this will be required or not?

Answer: The engineering survey is required to be done by a knowledgeable person, but it is not required to be done by a licensed engineer because there are no structural elements being modified in the contract SOW.

2. Is temp fence required? If so:

-Approximately how many LF of temp fence will you need?

-Approximately how many months will you need the temp fence?

-Will the posts be driven or on stands?

-How many drive gates will you need?

Answer: Yes, a site enclosure fence is required. Please refer to Division 1, Paragraph 3.3.E.6, Site Enclosure fence.

The contractor is responsible to determine what they need and for how long.