This document outlines a solicitation for construction services at Cape Hatteras National Seashore in North Carolina. The National Park Service seeks a contractor to construct ten RV sites with roads, utilities including a 600-amp electrical service, septic system, and associated site work at its Ocracoke Administrative site for under $1,000,000. Interested vendors must have NAICS code 237990 for heavy and civil engineering construction and be registered in SAM. The solicitation is a 100% small business set-aside for firms under $45 million average annual gross revenue. The site visit was January 19th, questions were due January 26th, and proposals are due February 9th by 12:00pm Eastern via email. The contractor must coordinate with Hyde County on permits for the septic system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Cape Hatteras National Seashore

RV Sites and Utilities

Responses to Questions for RFP 140P5523R0003

Site Visit was January 19, 2023

Questions were due January 26, 2023

Question 1: The SOW states the following “The road and RV sites and spurs shall be constructed with a six-inch graded aggregate base. Please define 6” aggerate base i.e., 21B, 21A, 56 Stone. What stone (crusher run, #57, etc.) is preferred to be used in the graded aggregate base?

Answer 1: See page 3 of the SOW. GAB is defined as Graded Aggregate Base; a crushed stone base material used in construction that is sometimes referred to as crusher run. GAB is a combination of course and fine stone material ranging in size from sand to approximately 1.5-inch stone. North Carolina uses the term ABC or Aggregate Base Course which is equal to GAB.

6 inch is the thickness of the material after it has been spread and compacted.

Question 2: Please confirm that geotextile fabric is NOT required under road surfaces or RV pads.

Answer 2: Geotextile fabric is NOT required under road surfaces or RV pads. That is not in the SOW.

Question 3: Will the Government require a Professional Engineered stamped drawing to be submitted for the approval of the septic field?

Answer 3: No. The Government is not requiring stamped drawings, ONLY approval from Hyde County is required for the septic field.

Question 4: Are As-builts a requirement for closeout documents of this project.

Answer 4: Yes. See REVISED SOW. As-builts are required.

Question 5: Are CAD drawings or reference monuments available to provide reference for site layout?

Answer 5: An electronic copy of the CAD drawing will be provided to the awardee.

Question 6: Please confirm the Prime Contractor and Key Prime Contractor personnel and Key Subcontractors with a letter of commitment can be utilized for Past Performance requirements of this solicitation.

Answer 6: Yes. FAR 15.305 The evaluation should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.

FAR 9.1 prime contractors are responsible for determining the responsibility of their prospective subcontractors (but see 9.405 and 9.405-2 regarding debarred, ineligible, or suspended firms). Determinations of prospective subcontractor responsibility may affect the Government's determination of the prospective prime contractor's responsibility. A prospective contractor may be required to provide written evidence of a proposed subcontractor's responsibility.

Question 7: The Statement of Work states “The contractor shall work with Hyde County Environmental Health Specialist to acquire county a Hyde County environmental permit prior to beginning the installation of the septic system. Location, placement, flow rates, tank size, length of drain field, and pump size for the new septic system shall be constructed according to North Carolina Codes: 15a NCAC 18A.1950, 15a NCAC 02T.0105, 15a NCAC 02T.0114.

NC Code requirements for 15a NCAC 02T.0114 states “campgrounds with water and sewer hookups 100 gal/campsite”.

This appears to be a conflict with the code and Statement of Work. Please advise.

Answer 7: See page 4; Section 2.5 Septic System of the SOW. Hyde County recommends 1500-gallon tank for the effluent.

https://www.acquisition.gov/far/9.405#FAR_9_405 https://www.acquisition.gov/far/9.405-2#FAR_9_405_2

2 | P a g e

Question 8: In Section 2.5 Septic System, the SOW states “Contractor will be required to obtain permit and complete required inspections for septic and drain field system through Hyde County Environmental. The system will require an appropriately sized septic tank (1500 gal).

Is this the needed size or is this a recommendation? Sites 4-10 being connected to this is only going to require a 600-Gal

Tank with code requirements. Please advise.

Answer 8: See page 4, Section 2.5 of the SOW. The government requires a 1500-gallon tank for the effluent.

Question 9: Section 2.6 Disposal, the SOW states “The contractor shall dispose of one existing septic system shown in

EXHIBIT A Ocracoke Administrative RV Site Plan, Existing Infrastructure.

Where is tank located? Exhibit A only shows site of drain field per Key.

What size is the current tank?

Contractor shall have the tank pumped and free from sewage before removal and disposal. Can this be crushed in place and used as fill or is full removal required?

Answer 9: Exact location of the tank is unknown; it is anticipated to be located near the terminus of the existing septic lines adjacent to the drain field. It is believed to be a 1000-gallon tank. Contractor shall have the tank pumped and free from sewage before removal and disposal which shall be removed from site not crushed and used for fill.

Question 10: Section 2.2 Roads and RV Sites, the SOW states “The construct the roads and RV sites found in EXHIBIT

B Ocracoke Administrative RV Site Plan and in the following requirements.

The site for 7 & 8 will be in line with the existing roadway. Are we to remove that roadway and excavate back to allow roadway to line up with site?

3 | P a g e

Answer 10: Sites 7&8 will be in line with the existing roadway. Contractor shall utilize existing pavement for the spurs to the RV pad. Pavement not in the road or spurs shall be removed and disposed of.

Question 11: Drainage field location on Exhibit B shows the field near existing Septic tank. Is this a proposed area to end the drain field only.

Answer 11: See REVISED SOW page 7. Correction to Exhibit B is as shown as the proposed location for the drain field.

Question 12: There is an existing meter along the fence line at the back of the site. Per the power company this meter belongs to the Coast Guard. It was discussed at the site visit that this was to be removed by the contractor. The power company was going to reach out to the POC listed for the coast guard but if they cannot be reached the Contractor may have a difficult time coordinating this removal of this meter and wiring. If this service is desired to still be removed can the NPS provide coordination with the USCG?

Answer 12: The government has coordinated with Tideland Electrical Managing Corporation for removal of this service.

Question 13: The scope has a power requirement of 600-amp service to facilitate the 3–200-amp panels. After removing the existing service at the campground by the existing drain field the transformer it was using will need to be increased to

4 | P a g e supply the 600amp service per the power company. If future additional power at this location is desired the power company wanted to ask about increasing the transformer size to accommodate 800 amps for 200 amps for future use if needed. Please advise if the 600 amp or 800-amp transformer is desired.

Answer 13: See SOW section 2.3; project requires a total of 600-amp service.

Question 14: Would the NPS prefer to have GFCI breakers at the RV pedestal or at panel feeding each pedestal?

Answer 14: See SOW section 2.3; The RV pedestal will have GFCI breakers. Contractor shall comply with Tideland

EMC (local jurisdiction) and NEC requirements.

Question 15: The RV pedestals to be provided are noted to be G90 galvanized steel. Given the proximity to the sound and the harsh environment is it desired to have Stainless steel RV Pedestals?

Answer 15: See SOW Exhibit F and Section 2.3. Pedestals are to be G90 galvanized steel.

Question 16: Can the NPS advise the POC for the Hyde County Environmental department that is aware of this project?

Answer 16: Information will be provided to the awardee

Question 17: Verify the Brown Water line shown on Exhibit A is to remain in place?

Answer 17: Yes, the Brown Water line is to remain in place.

Question 18: There may be conflicts with some of new utilities crossing the existing brown water line for sites 7 & 8. Can you verify the depth of the existing brown water line and its size?

Answer 18: Contractor will need to verify location and depth of utilities prior to grading as prescribed in SOW Section

2.1.

Question 19: Is it desired to have stainless steel Electrical panels, Meter Base, and CT Cabinets?

Answer 19: See SOW Section 2.3 Electrical Service; bullet #7 for panel specifications.

Question 20: Will the NPS remove the debris and material at the existing wooded line near sites 1-3 or is it to be the responsibility of the contractor?

Answer 20: No. Government will be responsible for removing debris.

Question 21: Verify the NPS will remove the shell and soil spoil piles at the site currently prior to the commencement of work by the contractor?

Answer 21: Yes, NPS will remove the shell and soil spoil piles at the site currently prior to the commencement of work by the contractor.

Question 22: Reference SOW, Paragraph 2.3, bullet #6 states that “one electric meter shall be provided for the entire site”. Does the government intend there to be (1) meter for all (10) RV sites?

Answer 22: Yes, there is to be one meter for all the RV sites.

Question 23: Please confirm that the government intends there to be only (1) 30-amp breaker for the septic pump and alarm.

Answer 23: Yes, there is to be only (1) one 30-amp breaker for the septic pump and alarm. See Section 2.5 Septic

System: bullet #7.

Question 24: Please verify that it is the governments’ intent that the 50/30/20-amp direct burial RV pedestal electrical box or equal be installed at all (10) RV sites?

Answer 24: Yes, the 50/30/20-amp direct burial RV pedestal electrical box or equal will be installed at all (10) RV sites.

See Exhibit F and Section 2.3 Electrical Service: bullet #10

5 | P a g e

Question 25: Does the government intend for the contractor to provide a concrete pad per exhibit D for all (10) RV sites?

Answer 25: No, there is no concrete pad. See Exhibit D. The interior is Graded Aggregate Base. The concrete is for the header curb only.

Question 26: What is the depth of the concrete pad for RV sites?

Answer: 26: See answer 25. There is no concrete pad. See Exhibit D. The interior is Graded Aggregate Base. The concrete is for the header curb only.

Question 27: Does the government require the contractor to provide engineered stamped drawings for the new septic system that will be installed?

Answer 27: No. There is no requirement for this.

Question 28: Is it a requirement to provide engineered/stamped drawings for the site layout, grading, or drainage plan?

Answer 28: No. There is no requirement for this.

Question 29: Does the government require the contractor to provide as-built drawings?

Answer 29: Yes. See Action Submittal #10 on REVISED SOW.

Question 30: Does the government intend for the contractor to provide compaction and concrete testing?

Answer 30: No. There is no requirement for this.

Question 31: Confirm that the government requires the contractor to obtain septic installation permits with Hyde County

Health Department.

Answer 31: Yes. See Section 2.5 Septic System: Bullet #6

Question 32: IF septic permits are required, will the government or the contractor be responsible for having Hyde County

Health Dept. perform a site evaluation to determine the Long-Term Application Rate necessary for sizing the drain field?

Answer 32: The contractor must obtain the Permit from Hyde County. The government has consulted with Hyde County and the County has conceptually approved the system as specified in SOW.

Question 33: It appears that there are several potable water supply wells located on the water plant site near the area where construction activity is proposed. In the overlays, do the proposed new drainfield locations have the proper and required setbacks from the potable water wells?

Answer 33: Yes. See Exhibit C (Attachment 3 – Dimensional Site Map).

Question 34: If the setbacks from the proposed new drain field and potable water supply wells are unknown, and if it is the contractor’s responsibility to confirm, does the government require a survey submittal with this information?

Answer 34: No. There is no requirement for a survey submittal.

Question 35: Please confirm that per page 4 of the SOW, the government intends the contractor to install a new fire hydrant.

Answer 35: There is NO requirement for a fire hydrant. SOW on page 4 states hydrant which is found and referenced as

Exhibit G. The requirement is for Frost Proof Water Hydrant.

Question 36: Please confirm that the site where the septic system is installed is less than one (1) acre.

Answer 36: Yes. See Section 1.0 Existing Conditions. The entire site to be developed is less than one acre.

Question 37: If the site is over one (1) acre, this would require a soil erosion and sedimentation control plan permit and approval from NCDEQ & DEMLR, which would trigger the requirement for a stormwater permit. Please see the

Sedimentation Pollution Control Act of 1973, condensed version, Page 2, first paragraph (Exhibit B). If the site is over one (1) acre, does the government intend for the contractor to provide monthly stormwater pollution and prevention reports?

Answer 37: The entire site to be developed is less than one acre.

6 | P a g e

Question 38: The site lies adjacent to Class SA water (the Pamlico Sound). Does the amount of impervious cover which is to be installed exceed 10,000 sq ft total? If so, this will trigger a stormwater plan and permit.

Answer 38: The improved developed area for impervious cover (header curb) is less than 1,000 sq.ft.

Question 39: Please confirm that all proposed work will be more than 75 feet from the shoreline.

Answer 39: Yes. The work is approximately 130’ from the shoreline.

Question 40: Is this a design build project? Is there engineered set of plans available?

Answer 40: No. There are no engineered plans. See exhibit C (Attachment 3-Dimensional Map).

Question 41: How much concrete header curbing per site? Is the concrete curb monolithic?

Answer 41: See exhibit D of the REVISED SOW. 106 linear feet per site. Yes. The curbing shall be a monolithic pour.

Question 42: Will contractor be required to remove/trim vegetation?

Answer 42: The government anticipates the contractor will trim/remove vegetation as necessary. See page 2 section 2.2 and page 5 section 2.6 of the SOW.