Q&A_0002.docx
DOCX document 580 KB Posted
- Attached to
- Park Service, Replace Fence, San Juan NHS
- Solicitation number
- 140P5520R0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED PWS 1-28-20_0002.pdf | ||
| Sol_140P5520R0003_Amd_0002.pdf | ||
| SAJU Aerial Map _0001.pdf | ||
| Sol_140P5520R0003_Amd_0001.pdf | ||
| Attachment 4 Past Performance Worksheet.doc | DOC document | |
| Attachent 1 Read This First.docx | DOCX document | |
| Attachment 2 Performance Work Statement.pdf | ||
| Provisions & Clauses.pdf | ||
| Sol_140P5520R0003.pdf | ||
| Attachment 3 Wage Determination PR20200001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer
Question: Can you clarify what trees need to be removed?
Answer: See page 5, Figure 2 of the Performance Work Statement dated 1/28/2020 Remove 400 feet of sea grapes trees and stumps
Question: What type of sod is required for replacement?
Answer: Manila sod is required – See Performance Work Statement dated 1/28/2020 page 4
Question: Clarify what type of steel is required?
Answer: 316 Stainless Steel for fence and any hardware exposed to the elements of salt air – See Performance Work Statement dated 1/28/2020.
Question: Can we use epoxy coated rebar for the concrete posts?
Answer: No. We are moving away from the epoxy coated rebar. It fails quickly in the marine environment. Fiberglass rebar is required – See Performance Work Statement dated 1/28/2020 page 6.
Question: Can we use microfiber concrete for the concrete posts?
Answer: Yes, but you must use fiberglass rebar as well.
Question: Is the site visit compulsory for this project?
Answer: Offerors or quoters are urged and expected (not mandated) to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Question: Which gauge will be the 1" and 1/12 pipes for the fence?
Answer: We will accept 1/16”, minimum actual thickness 140P5520R0003 Page 2 image1.png