This is a Questions and Answers document for a Virgin Islands National Park landscaping services solicitation (140P5426Q0038). The document clarifies scope ambiguities raised by prospective offerors prior to the September 4, 2026, 12:00 PM EST question deadline.
Key scope clarifications include: North Shore Road maintenance covers 13.77 miles from Mongoose Junction to Kingshill/Annaberg/Francis Bay; East End Road encompasses 3.00 miles with entry and exit points at the Shooting Range and Haulover Beach; parking lot measurements are specified in SOW sections 5.2 and 5.5, excluding the Maintenance Facility; debris removal includes existing debris and accumulated leaf litter, with disposal by placement downslope in a neat, presentable condition without off-site hauling; Shooting Range access requires coordination with the awarded contractor with daily gate locking procedures; and all services must conform to applicable codes, NPS requirements, and accepted industry standards. Regarding services not included or requiring further specification, the government responded uniformly that only items explicitly indicated in the SOW are being considered, effectively declining to expand scope regarding labor classifications under WD 2015-5715, bonding requirements, pavement markings, parking lot striping, pressure washing, curb painting, traffic control, Cinnamon Bay inclusion, or Maintenance Facility specifications. The responses indicate that offerors should base their proposals strictly on SOW content without assumptions regarding additional services or requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND RESPONSES
VIRGIN ISLANDS NATIONAL PARK – LANDSCAPING SERVICES – 140P5426Q0038
Note: The following questions were received prior to the deadline for questions which was 09/04/2026 at 12:00PM EST as per the solicitation.
1. The Statement of Work (Section 5.1) lists North Shore Road as approximately 13.77 miles from Mongoose Junction to Kingshill/Annaberg/Francis Bay. However, Appendix A, Figure 1 shows North Shore Road as
7.45 miles total from Mongoose Junction to Centerline Road. Could you please clarify the correct total mileage/scope for North Shore Road so we can accurately price this line item?
Response: The correct measurement is 13.77 miles as indicated in the SOW
5.1 Roads
2. The SOW states approximately 13.77 miles for North Shore Road, while Appendix A identifies approximately 7.45 miles plus separate segments. Which total road corridor and mileage should be priced?
Response: The correct measurement is 13.77 miles as indicated in the SOW
5.1 Roads
3. Please confirm the exact East End Road mileage and endpoints to be included.
Response: The correct measurement is 3.00 miles as indicated in the SOW
5.1 Roads. There are two signs stating you are entering and
leaving the Park both at the Shooting Range and Haulover Beach as indicated in the SOW 5.1 Roads.
4. Please provide or confirm quantities/areas for each parking lot listed in the price schedule, including the maintenance facility, Peace Hill, Trunk Bay lower/upper, Annaberg, and Francis Bay.
Response: The measurements are included in the SOW 5.2 Remote Areas and
5.5 VIIS Parking Lots. The SOW does not include the Maintenance Facility.
5. Does debris removal include existing debris and accumulated leaf litter, or only debris generated during the current cutting cycle?
Response: YES, as indicated in the SOW 4 General Performance Requirements
- 6th Bullet
6. Please confirm the required disposal location and whether off-site hauling/disposal is required.
Response: As indicated in the SOW 4 General Performance Requirements - 5th
Bullet – The park will allow for debris to placed downslope of the cut areas, not mounded and left in a neat, presentable condition
7. Please confirm whether any territorial business, landscaping, tree-work, pesticide, or other license is required.
Response: As indicated in the SOW 1 Scope, All services shall confirm to applicable codes, NPS requirements and accepted industry standards.
8. Please confirm whether any special authorization, safety procedure, or escort applies to the Shooting
Range.
Response: As indicated in the SOW 4 General Performance Requirements - 5th awarded contractor known and a schedule is given for that area, the locked gate will be opened and must be locked at the completion of each day work.
9. Please confirm the applicable fringe-benefit amounts or required labor classifications under WD 2015-5715 Rev. 28 for this scope.
Response: Only what is indicated in the SOW is being considered.
10. Please confirm whether qualified flaggers are sufficient or whether a certified traffic-control supervisor/plan approval is required.
Response: Only what is indicated in SOW 4 General Performance
Requirements – Bullet 10
11. Please confirm that no bid bond, performance bond, or payment bond is required.
12. Is there any incumbent/recompete or is this a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
13. Appendix A includes photos referencing faded roadway centerlines and required white edge lines, but the statement of work and price schedule do not mention pavement marking. Could you please confirm whether roadway pavement markings or parking lot striping are within the scope of this solicitation, and if so, should offerors include pricing for roadway centerlines, edge lines, parking stalls, or other pavement markings?
14. Are the parking lot requirements limited to vegetation maintenance only, or should contractors also include services such as sweeping, pressure washing, curb painting, or traffic control associated with parking lot maintenance?
15. Cinnamon Bay: Is Cinnamon Bay included in the scope of work under any Price Schedule line item?
16. Maintenance Facility (Line Item 6 - Parking Lots): The Price Schedule references a Maintenance Facility parking area, but no square footage or boundary is provided in the Statement of Work or Appendix A.
Please provide the square footage and boundary for this location.
Response: Only what is indicated in the SOW is being considered. The SOW does not include the Maintenance Facility.