This document is a set of Questions and Answers (Q&As) related to Amendment 1 of Solicitation 140P5424R0007 to "Replace Gate, Fence and Clear Vegetation-EVER" for the Department of the Interior National Park Service Southeast Region.

The key details are:

  • The solicitation requires the use of both 9-gauge and 6-gauge chain link fence, with the 6-gauge fence specified for the Flamingo District access road.
  • The government will not remove the requirement for an ISA Certified Arborist, as requested by one potential offeror.
  • Vegetation trimming is required to provide a 10-foot mowing strip around designated areas, access roads, facilities, and along both sides of the fence, but not beyond the 10-foot requirement within the fenced area.
  • Tree removal is required within 10 feet of structures at the Pine Island Wastewater Treatment Plant, except for the Florida pine as stated in the Statement of Work (SOW).
  • Any answers or clarifications that add to or change information in the SOW will be incorporated before award.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Gate, Fence and Clear Vegetation-EVER, newest first.
File Type Posted
Sol_140P5424R0007_Amd_0001.pdf PDF
Atch_3_Photos_and_Area_Layouts.pdf PDF
Atch_1_SOW.pdf PDF
Atch_2_Required_Form.pdf PDF
Sol_140P5424R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5424R0007 Amendment 1 Attachment 1

Question #1: Question in the fence detail there is 2 type of chain link 9 ga and 6 ga is this correct Answer: Yes, there is 2 types of chain link 9 ga and 6 ga. The 6 ga as stated in the SOW is for the fence detail located in Flamingo District on the Access Road. Pine Island Rapid Infiltration Basin 9 ga x 2 fabric is required in the SOW.

Question #2: Will the government consider removing the ISA Arborist Certification requirement from this project. We feel this limits the amount of vendors, such as us, capable of successfully completing the project due to not having an arborist certification. We intend on clearing the vegetation long the fence line(s) using a mulching head attached to a skid steer.

Answer: No. The government will not consider removing the ISA Certified Arborist requirement.

Question #3: The fence surrounding the visitor center / headquarters pumphouse needs to be adjusted and a section of barbed wire needs repair. Is this to be included in the proposal?

Answer: No.

Question #4: At the pine island rapid infiltration basin, is all vegetation inside the fenced area to be removed as well as a 10' perimeter on the outside of the fence?

Answer: Trim vegetation to allow a 10-foot-wide mowing strip around each designated area, access road, facility, and along “both sides” of each fence. Replace perimeter fence at Pine Island’s Rapid Infiltration Basin. Trimming is not required beyond the 10ft requirement within the fenced area.

Question #5: At the Pine Island Wastewater Treatment Plant, is removal of entire trees required if they are within 10' of the structure?

Answer: Yes with the exception of the Florida pine as stated in SOW. Ensure an acoustic bat survey is performed as required prior to removal of the standing dead pine tree located along the northern fence perimeter of the Pine Island Wastewater Treatment Plant.

Note: Any answers or clarifications that add to or change any information currently in the statement of work (SOW) will be incorporated before award. Acknowledgement of these answers demonstrates offeror’s receipt of updated info.