This amendment modifies the scope of work for a solicitation seeking to renovate multiplex personnel housing at Pine Island in Everglades National Park.
The amendment limits the scope of work to unit 155 A-D only, removing references to other housing units. It provides additional details on demolition, insulation, exterior concrete work, CMU wall repairs, electrical supply conduit repair, removal of telephone and cable service, door specifications, addition of hurricane straps, exterior siding and trim work, a bid price breakdown requirement, electrical system replacement, utility room ceiling material, use of gypsum veneer plastering, window and door shade/blind specifications, wood veneer casework, granite countertops, plumbing venting and drainage. Bidders are advised to use the park's standard finish palette upon contract award. The related solicitation is for the renovation of multiplex personnel housing unit 155 A-D, issued by the National Park Service Southeast Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire_v2_0003.pdf | ||
| Sol_140P5424R0002_Amd_0003.pdf | ||
| Sol_140P5424R0002_Amd_0002.pdf | ||
| Sol_140P5424R0002_Amd_0001.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| Wage_Determination.pdf | ||
| Sol_140P5424R0002.pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 2
February 22, 2024
Renovations to Multiplex Pine Island Personnel Housing 155 A-D
140P5424R0002_PMIS 305612
Pine Island District, Everglades National Park
A2.00 Drawings & Project Specifications Scope shall follow the Drawing set for Unit 155 A-D only. Contractor shall ignore any reference in the Drawings to any other housing unit at the park. Scope shall also follow the Project Specifications for Unit 155 A-D only. Note: Project Specifications were developed for five individual projects and include information that may not apply to this specific project. Contractor shall notify Contracting Officer or Contracting Officer Representative for any questions regarding scope.
A2.01 Demolition Demolition shall include all interior sheathing (plaster/drywall) to open up ceiling and exterior walls for closed cell spray foam insulation work and for MEP work.
A2.02 Insulation Insulation scope to include all framed exterior walls. Exterior walls shall be insulated with closed cell spray foam insulation (3", R13 min). Ceiling/Roof insulation shall be closed cell spray foam (6”, R30.)
A2.03 Exterior Concrete Stoops Contractor shall replace all exterior concrete stoops at door entrances and all concrete AC pads in kind.
A2.04 CMU Wall Repairs Existing wood framing surrounding window openings of CMU walls shall be filled with CMU block and re-framed to give a clean, new appearance. Any existing metal shutter bracing shall be removed.
A2.05 Rusted Electrical Supply Conduit The NPS will repair the rusted supply conduit at grade where the service meets the building.
A2.06 Telephone & Cable Telephone and cable service lines, outlets and equipment shall be removed as part of demolition scope.
New telephone and cable service is removed from the project scope.
A2.07 Door Types Door Type L2 in the Drawings (bedroom louvered vented door) shall be solid wood. Provide one inch clearance at bottom of door to allow return air to HVAC unit. Where door frames cannot be salvaged due to demolition Contractor shall also provide frames along with doors as noted in the Drawings.
A2.08 Hurricane Straps After demolition of interior sheathing Contractor shall inspect framing for presence of hurricane straps and add straps per code from rafters down to base plates. Strapping shall also be added to ridge beam and rafters as required. Bidders should assume that there is not any existing strapping.
A2.09 Exterior Siding / Trim Scope of exterior siding and trim shall include vertical siding and trim at porches and any deteriorated framing members. New work shall match existing.
A2.10 Bid Price Breakdown Bidders shall provide their cost proposals per the 50 Division Construction Specifications Institute (CSI) MasterFormat. Subdivision breakdown is not required.
A2.11 Electrical All meters and service are to be completely replaced per the Drawings and Specifications. Feeders from meters to new panels at utility room are to be installed through the attic as per the Drawings. Existing 30/50-amp outlets are to be replaced with new. Outdoor lighting shall be controlled from house panel.
Romex, or non-metallic sheathed cables are permitted as per the Specifications. NPS or FPL is responsible for any work from FPL junction box to service meter.
A2.12 Utility Room Ceiling Utility Room is numbered “12” on the Drawings. Gypsum board shall be used at ceiling per note 04.
A2.13 Gypsum Veneer Plastering For those interior walls that are to remain as noted in the Drawings, some have a lathe and plaster finish rather than drywall. In cases where only select demo is to take place or where there is considerable damage to the existing plaster, Contractor shall use a gypsum veneer plaster to maintain the historic character of the wall and as further detailed in Section 290603 of the Project Specifications.
A2.14 Window/Door Shades & Blinds As noted in the Drawings as WS1 and WS2 (Sheet A102) Contractor shall provide either shades or blinds as per the Project Specifications.
A2.15 Wood Veneer Casework Section 123313 of the Project Specifications details manufactured wood veneer casework, for kitchen cabinets and bathroom vanities.
A2.16 Solid Surface Countertops Countertops and back splashes shall be of granite stone. Contractor shall provide a sample to Contracting Officer Representative for review and approval. Note: The Everglades National Park has a palette of standard finishes that are used in its housing units and that are readily available on the market and at reasonable cost. Upon contract award the Contractor shall be provided with the palette for guidance in locating and submitting materials for review.
A2.17 Plumbing New exhaust and vent lines shall connect to existing vent penetrations at roof to avoid new roof penetrations. Where new roof penetrations are required, Contractor shall be responsible for resealing penetration and any painting of stacks or other equipment affected by the work to match adjacent surfaces. All venting shall be to the exterior. All lines shall be PVC or CPVC or as noted in the Drawings. Drainage for mechanical equipment shall be provided by Contractor.
W. Devine