Questions_and_Responses_Sol__140P5424Q0042_0001.pdf

PDF 127 KB Posted

Attached to
SERVICE, ROADSIDE VEGETATION MAINTENANCE, EVER
Solicitation number
140P5424Q0042
Issued by

About this file

This document contains the questions and responses related to Solicitation Number 140P5424Q0042 for roadside vegetation maintenance services at Everglades National Park. There is no incumbent contractor for this contract, which has an anticipated start date of August 12, 2024. The solicitation specifies that there are no limitations on using subcontractors, though subcontractors must adhere to certain environmental and safety requirements. The government has indicated preferences for the types of equipment to be used, including light-duty trucks, vegetation clearing and mulching equipment, and hand tools. Contractors must legally dispose of all vegetation debris removed from the roadsides. The solicitation also provides details on the specific vegetation clearing required at two roundabout locations and around a concrete slab at the Shooting Gallery site. There are no security clearance or background check requirements for contractor personnel.

View the file

Other files

File Type Posted
Sol_140P5424Q0042_Amd_0001.pdf PDF
Chekika_Roadside_Clearing_SOW.pdf PDF
Sol_140P5424Q0042.pdf PDF
SCA_WD_2015-4543_Rev27.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions – EVER Road clearing – 140P5424Q0042

1. Could you please provide information on the current incumbent for this contract, including the contract's number, and expiration date? No Incumbent

2. If awarded, what will the start date be? August 12, 2024

3. Can you provide more specific details on the expected volume and frequency of pickups/deliveries at each school location? This question is not relevant to this contract.

4. Are there any limitations to using a subcontractor? There are no limitations to using a subcontractor.

5. Are there any specific local or park regulations that subcontractors need to comply with?

The following mitigations must be adhered to:To protect known or unknown archeological resources, trees and other woody vegetation shall be stump cut flush to the ground. No root pulling is permitted. Stump grinding is permitted to reduce the stump at grade. Vegetation clearing should occur outside of the nesting season (15April - 31July) for T&E species in the area including black rails, snail kites, and others. Coordinate surveys for T&E bat species in the event that removal of trees greater than 8"dbh and 30ft high are identified. Surveys may include evaluating for presence of cavities, examining cavity contents, and/or conducting acoustic monitoring for 1-4 nights. Park will perform acoustical bat survey to trees that meet or exceed specifications mentioned above.

What level of security clearance or background checks, if any, are required for personnel working in the park? There are no level of clearances necessary for contractors employees.

6. Are there any specific insurance requirements for subcontractors? Provide proof of insurance as described on SOW.

7. Does the government have any preferences regarding the types of equipment used? Tools standard for mastication, trail maintenance, and vegetation trimming, construction tools, and equipment will be used on roadsides, including light-duty pick-up trucks; a track-mounted hydraulic axe and/or land clearing and mulching equipment; portable power and hand tools, gas powered pole saws, chain saws and hand saws, and other portable and gas-powered equipment; shovels.

8. Are there any specific waste disposal or environmental protection measures that need to be implemented? Remove and legally dispose of off-site dead or dry vegetation and all tree and plant debris trimmed along the roadsides. Production of fine cuttings, debris, and mulch must be minimal.

9. On the north and south end of SW 237th Ave (Shooting Gallery and Mustang Corner) is all vegetation and trees around perimeters as well as round-abouts to be removed? Yes Vegetation is to bed cleared approximately 10-13 feet at round-abouts at both locations.

10. At the shooting gallery , is vegetation and trees growing in and around existing concrete slab to be removed? Yes