Atch 1 to Am 1-Q&As
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_1_to_Am_2-Revised_SF18.pdf | ||
| Sol_140P5418Q0028_Amd_0002.pdf | ||
| Sol_140P5418Q0028_Amd_0001.pdf | ||
| Sol_140P5418Q0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5418Q0028 Amendment 1 Attachment 1
Question #1: Can park service move all personal items and smaller furniture and Contractor will move larger furniture?
Answer: Park will move personal items, Contractor will move all furniture.
Question #2: Can Contractor work Saturday and Sunday on convoy point headquarters and visitor center ?
Answer: All work and deliveries shall be limited to the weekday hours of 7:00 am to 3:00 pm unless otherwise approved by the Contracting Officer’s Representative (COR). No work shall occur on holidays or weekends without prior approval.
Question #3: Please confirm that the Government will transport our materials to Elliott Key and Adams Key.
Answer: The Government may provide transportation for materials to Elliott key and Adams key. This is dependent on weather and boat availability)
Question #4: Will you provide a storage area for our materials and equipment?
Answer: With a 72 hr Minimum notice, contractors will be able to store a small enclosed trailer in the Boneyard (outdoor storage yard).
Question # 5: What are the hours of operations? Will we be able to work after hours and on weekends?
Answer: See answer to #2.
Question #6: Bid documents call for floor paint warranty to be 25 years. Please confirm that wear and tear is not warrantable.
Answer: The government understand that normal wear and tear is not warrantied.
Question #7: Provide existing paint specifications on interior walls and ceilings.
Answer: All walls, ceilings, floors, and doors will be painted to match existing unless otherwise directed by COR, and color must be approved by COR. Select floors will be prepared and painted Commercial grade two-part Epoxy paint, Benjamin Moore Coronado or equivalent. Wall and Ceiling Paint shall be Commercial grade latex paint, Benjamin Moore Ultra-Spec or equivalent. Door paint shall be Commercial grade acrylic paint Benjamin Moore regal or equivalent. Walls, ceilings, and doors shall be coated with 2 layers of top coat once prepared and primed.
Question # 8: Regarding the 25 year guarantee, the only guarantees for paint have only been for 5 years 7 years or 10to12 by a contractor. Is the guarantee from the paint (company as far as the label) most label's can say 25 years but won’t guarantee it.
Answer: The contractor will guarantee the wall, ceiling, and door paint for 12 years.
Question #9: Where will the staging area/parking area for contractor be located?
Answer: See Question #4
Question #10: If transportation to Elliot and Adams Key is to be provided by contractor, will there be a dock/parking area provided to park the boat at no additional cost?
140P5418Q0028 Amendment 1 Attachment 1
Answer: There is no designated contractor vessel mooring/ docking. There is no fee to dock a vessel during working hours. (Overnight docking depending on year has a charge on Elliott key) (There is no overnight docking on Adams key)
Question # 11: Moving of all office cabinets, tables and other items in different rooms is to be done by contractor?
Answer: See question #1
Question #12: Can the signing sheet for the pre bid meeting be provided?
Answer: That is not distributed.
Question #13: Will you be attaching a revised statement of work incorporating any updates?
Answer: No. Updated specifics will be attached before award that incorporates any new information provided in these Q&As.