A06_0040432405_Specs_(1).pdf
PDF 251 KB Posted
- Attached to
- PURCHASE FLUME LUMBER AND SHAKES Blue Ridge
- Solicitation number
- 140P5319Q0003
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5319Q0003_Amd_0001.pdf | ||
| B09_140P5319Q0003_Vendor_Questions.pdf | ||
| Sol_140P5319Q0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lumber and Shake Specs
Obtain Rough Cut Lumber for Mabry Mill Blue Ridge Parkway Floyd Co., Va.
PART 1: GENERAL
1-1 DESCRIPTION OF WORK
A. This contract replaces the wooden flumes at the historic Mabry Mill, Blue Ridge
Parkway Floyd, Va. This contract will supply the lumber to replace the four sections of wooden flume/raceway. Additionally, white Oak shakes will be used for roof replacements.
B. The contract work includes:
1. Milling from fresh cut white oaks.
2. Milling white oak to attached board rough cut specifications.
3. Air drying White oak lumber after milling for a period of 10 weeks
4. Provide 1100 square feet hand split premium grade white oak shakes 32 inches in length with a 21 inch exposure. Thickness will be ½” and width 5 –
6 inches.
5. Provide 950 square feet hand split premium grade white oak shakes 34 inches in length with a 24 inch exposure. Thickness will be ½” and width 5 – 6 inches.
6. Delivery of lumber to 1670 Blue Ridge Parkway Floyd, Va 24091 expected NLT 5/1/2019.
7. Delivery of shakes to 1670 Blue Ridge Parkway Flooyd, VA 24091 expected
NLT 7/1/2019
C. All work will be performed under a single contract.
1-2 BACKGROUND
A. Mabry Mill is the most popular single visitor site on the Blue Ridge Parkway, providing a powerful interpretive message to upwards of 2 million travelers annually.
The picturesque Mabry Mill and pond scene is the single most photographed attraction on the Parkway, and this Mabry Mill panorama is featured on calendars and post cards worldwide. Ed Mabry acquired his 90 acre farm in 1898 and built his blacksmith shop shortly thereafter. The mill was built in three stages between 1903 and 1914. A gristmill was in operation by 1905, a sawmill was added after 1910, and a woodworking shop in 1914. The machinery in all three operations was powered by the waterwheel, which in turn drew its force from the water delivered by an ingenious set of flumes and waterways constructed by Mabry to direct every drop of available water toward the mill. Using a wagon and tools he had entirely made by hand, Ed Mabry in 1914 cut logs off the adjacent slopes, hauled them to his sawmill and woodworking shop to shape and finish boards for a new frame home he had designed himself. The Mill complex buildings are historic structures and are identified in the List of Classified Structures. Preservation of the flume will provide for the continued use, interpretation and enjoyment for park visitors.
1-3 LOCATION AND ACCESS
A. Location: 1670 Blue Ridge Parkway is accessible via Route 8 in Floyd county.
1-4 CONTRACTOR-FURNISHED ITEMS
A. The Contractor shall furnish all necessary supervision, personnel, equipment, transportation, materials, and incidentals required to complete the contract requirements.
1-5 WORK CONDITIONS AND LIMITATIONS
A. PROJECT OFFICERS AND INSPECTION
1. The Contracting Officer (CO) is the only person with authority to enter into, administer, modify and/or terminate the contract.
2. The Contracting Officer’s Representative (COR) is a program official designated by the CO to assist in administering technical aspects of the contract. The COR cannot modify the contract.
B. TRUCK LOAD LIMITS ON PARKWAY ROADS AND BRIDGES
1. The maximum permitted load limits on Parkway roads and bridges impacted by this project and limits are attached.
2. All damage shall be repaired to the Government’s specification by those who cause it and at no cost to the Government.
1-6 QUALITY ASSURANCE
A. All materials and methods used for this contract must meet or exceed the current local, state, and federal codes, standards, and regulations applicable to the contract work which includes the Secretary of the Interior Standards for Treatment of Historic Properties with Guidelines for Preserving, Rehabilitation, Restoring, & Reconstructing
Historic Buildings.
B. All personnel performing work under this contract shall be trained and skilled in the trades required to complete the contract requirements.
PART 2: MATERIAL
2-1 GENERAL
A. Use new materials except as otherwise approved by the Contracting Officer.
B. Flume Material
a. Boards shall be air dried. No combination of seasoned and green will be allowed. Live trees will be cut and milled to specs and air dried 10 weeks.
b. Boards shall be all of the same species--White Oak.
c. Lumber dimensions will be as follows:
i. 175 Ea.----2 ½” X 6” X 12’
ii. 115 Ea.----4” X 4” X 12’
iii. 140 Ea.----2 ½” X 4 ½” X 12’
iv. 100 Ea.----1 ½” X 9” X 12’
v. 100 Ea.----1 ½” X 14” X 12’
vi. 300 Ea.----1 ½” X 3” X 12’
vii. 40 Ea. -----1 ½” 14 ½” X 12’
viii. 60 Ea.------3/4” X 36” dowel rods
d. Boards will contain NO loose knots or blemishes that would allow water leakage..
e. Boards shall contain no wildlife holes, worm or ant wood, or otherwise penetrations, fungus decay, dote, rot, or otherwise unsound wood. Inspection by the Contracting Officer Representative (COR) which reveals such conditions shall be cause for rejection, and replacement.
C. Shake Material
a. Shakes will be white oak hand split. 1100 square feet- 32” L X 5”-6” W X ½” thick.
b. Shakes will be white oak hand split . 950 square feet – 34”L X 5”-6” W X ½” thick
D. White oak is the only acceptable material.
Part III Load Limits:
A. The load limits for the route 8 parkway bridge and the parkway itself are attached and delivery methods must adhere to load limits specified.