CAPE HATTERAS NATIONAL SEASHORE
Outer Banks Group
Statement of Work Provide Construction Materials to Various Sites at Cape Hatteras National Seashore
1.0 INTRODUCTION
The National Park Service (NPS) Outer Banks Group (OBG) will be contracting the purchase of construction materials to several sites on Cape Hatteras National Seashore.
2.0 CONSTRUCTION SITE LOCATION
The site locations include:
1) Devil Shoals Road along Highway 12 on Ocracoke Island across from the Ocracoke Campground.
2) Ramp 2 located approximately 6 miles south of Nags Head Whalebone intersection of Highway 158 and Highway 12. On the south end of the Coquina Day Use parking lot.
3) Ramp 4 located approximately 8 miles south of Nags Head Whalebone Intersection of Highway 158 and Highway 12, on the east side of Highway 12 just north of Oregon Inlet. Oregon Inlet Marina is across the street and has the address: 98 NC-12 Nags Head, NC 27959.
3.0 BACKGROUND AND EXISTING CONDITIONS
The NPS maintains vehicle access ways to the National Seashore using a variety of materials for the surface. A mixture of clay and shells per the instructions of the North Carolina Coastal Area Management Agency (CAMA) is used for repairs and maintenance to the access ways. The existing site for the delivery at Ramp 4 includes a paved entrance way and a compacted sand surface. NC Highway 12 runs from Bodie Island south to Ocracoke Island. The NPS has sand ramps at various locations along Highway 12.
The following pictures show aerial photos of the project sites:
Figure 1. Devil Shoals Road
Figure 2. Ramp 2 Area
Figure 3. Ramp 4 area.
4.0 STATEMENT OF WORK
The contractor will provide all technical support, materials, tools, equipment, and manpower required to provide the NPS with the following:
Base BID: Provide the following at the locations listed. The Contractor must meet the requirements and deliverables. Take special note of the additional requirements below – receipts showing weights/volumes must be provided to the NPS and a copy kept for the Contractor’s records.
Devil Shoals Road:
· 1,100 cubic yards of sand
· 400 cubic yards of clay material
· 600 cubic yards of clam shell material Material Requirements:
1) The clay soil mixture must meet the following specifications:
a. The clay mix must be obtained from a source considered local to the Outer Banks. Local material is considered to be material having a zero content of invasive species of plants, or any organic material. Top soil will not be accepted. Unsuitable material will be rejected and returned to the vendor at the vendor’s expense and will not be dumped on site.
b. The clay mix will be a product referred to as sandy loam and have an overall gradation of the following: 55-79 percent sand; 5-20 percent silt; and 12-20 percent clay.
c. Percentages of the listed soil contents may vary by plus or minus 2-3 percent, which can be discussed with the vendor providing the material.
d. The vendor supplying the clay mix is responsible for obtaining test results of the content of the material. The test results must be submitted to the NPS prior to delivery. Test results must be performed by an independent lab. The test requirement is for one sample per dig location, or one sample per 250 cubic yards, whichever is greater. The soil analysis must show the particle distribution including at a minimum:
i. Sieve size
ii. Percent passing each sieve
iii. Total percent gravel/coarse grains
iv. Total percent sand
v. Total percent silt
vi. Total percent clay
vii. Soil group classification
2) The clam shells must meet the following specifications:
a. The clam shells must be crushed and rolled to reduce edges. Whole shells should not account for more than 25% of the delivered material.
b. Scallops, cockle shells, whelks, and cone shells can be included but should not be more than 10% of the total shell volume.
c. Oyster shells may not be substituted.
3) The sand must meet the following specifications:
a. The sand must be obtained from a source considered to be local to the Outer Banks. Local material is considered to be material having zero content of invasive species of plants, or any organic material. Top soil will not be accepted. Unsuitable material will be rejected and returned to the vendor at the vendor’s expense and will not be dumped on site.
The NPS reserves the right to take samples of any or all deliveries to be tested for consistency and material distribution. The NPS reserves the right to withhold payment for any delivery that does not meet expectations as agreed upon between the NPS and contractor providing the material. If the material is deemed inadequate the NPS may reject the delivery and the contractor must provide additional material until the full amount of acceptable material is received. The contractor may obtain additional samples and test above the required number at his own expense to verify overall consistency of the deliveries.
ADDITIONAL REQUIREMENTS:
1) The vendor will be required to call the NPS point of contact (POC) for exact location on the day of delivery.
2) The Contractor must abide by the conditions listed in the Deliverables section of this scope of work.
3) The Contractor is responsible for all drivers and vehicles used for deliveries. These sites are considered off road and may require backing, turning, dumping, etc. on or near unpaved areas. The Contractor is responsible for verifying existing conditions prior to and at time of delivery.
4) The Contractor is required for scheduling deliveries to meet ferry routes to and from Ocracoke Island. Contractor vehicles are authorized to utilize the priority lane for ferry routes between Hatteras Island and Ocracoke Island.
5) Each vehicle/truck providing a delivery must also provide a receipt showing the materials being delivered to include volume, weight, dimensions, etc.
6) The Contractor must keep his own record/receipts of delivery in order to request payment. Accumulated totals of each type of material must be provided to the POC prior to submitting an invoice for payment.
ADDITIVE 1: Provide additional materials according to the following. These materials must meet the same requirements as the Base Bid.
Ramp 2:
· 300 cubic yards of clay material
· 300 cubic yards of clam shell material
ADDITIVE 2: Provide additional materials according to the following. These materials must meet the same requirements as the Base Bid.
Ramp 4: (Phase 1)
· 400 cubic yards of clay material
· 400 cubic yards of clam shell material
ADDITIVE 3: Provide additional materials according to the following. These materials must meet the same requirements as the Base Bid.
Ramp 4: (Phase 2)
· 400 cubic yards of clay material
· 400 cubic yards of clam shell material
5.0 CONTRACTOR REQUIREMENTS
The contractor shall have proven experience and expertise in:
· Trucking/material delivery
· Clay soil mixture consistent with recommended specifications
· Sea Shell types and consistency
The Contractor will be responsible for meeting all specifications mentioned in the statement of work prior to submitting a bid. Correspondence will be coordinated with the NPS POC: Nelson Pendleton. The POC’s contact information is listed below.
6.0 DELIVERABLES
The Contractor will be required to submit electronic and paper copies of testing reports to the NPS prior to delivery.
Delivery of material on site will only be accepted from 7:00 am through 3:30 pm Monday through Friday. Other arrangements must be requested in writing through the Contracting Officer and may be accommodated depending upon the location and request. Due to the high volume of expected deliveries, and Ocracoke Ferry schedule, the contractor will be required to contact the POC to assure proper receipt of the materials at the delivery location.
The contractor is highly encouraged to contact the POC prior to shipment to gain an understanding of the vicinity of the delivery sites. Vehicles which can perform the required turn-around, such as tandem dump truck, may be advantageous.
7.0 TRAVEL
Contractor will be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
8.0 ACCEPTANCE OF DELIVERABLES/TECHNICAL POINTS OF CONTACT
Nelson Pendleton Contracting Officer Representative Outer Banks Group, Cape Hatteras National Seashore
1401 National Park Drive
Manteo, NC 27954 Desk: 252-475-9025 E-mail: William_pendleton@nps.gov
9.0 CONTRACTOR OFFICER
NAME
Contracting Officer
NPS SER MABO
ADDRESS
CITY, STATE ZIP
Voice: xxx-xxx-xxxx E-mail: first_last@nps.gov
10.0 CONTRACTED SERVICES STATEMENT
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work, specifications, and contract documents. The tasks, duties, and responsibilities set forth in the Scope of Work, Specification, and Drawing Set may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR).
11.0 PROGRESS/COMPLIANCE
The government requires the following from the contractor in order to monitor progress and ensure compliance.
· Contractor shall provide a schedule in the form of a graph or chart which shows the proposed work schedule for the various aspects of the work. The schedule should include beginning and ending dates for each aspect or phase of the work, in order to track the progress of the contract work.
· The contractor shall provide onsite supervision of the contract work, including work that may be accomplished through the use of subcontractors. The onsite supervisor shall be the contact and liaison with the National Park Service.
· A final inspection and testing of all systems installed shall be accomplished by representatives of the contractor and the National Park Service. This inspection will serve as final determination of the completion and workability of the contract work. Final payment will not be made without a final inspection resulting in final acceptance of the work by the National Park Service.
Provide Construction Materials to Various Sites at CAHA