This is a Statement of Work for ridge cap repair and replacement services at Little River Canyon National Preserve's maintenance area gym building. The contractor must provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to remove and replace deteriorated ridge caps on the gym building within the maintenance compound in Fort Payne, Alabama. The work scope includes demolition and disposal of existing ridge caps and fasteners while preventing damage to underlying roof panels, inspection of the roof ridge substrate with notification to the NPS Contracting Officer's Representative of any deterioration, and installation of new pre-finished steel ridge cap systems with all required fasteners, flashing, closure strips, and sealants. The contractor must also provide necessary access and safety equipment including scaffolding, ladders, and lifts in compliance with OSHA and NPS safety policies, and maintain site protection and cleanup throughout the project.
Performance requirements mandate compliance with NPS Facility Management Standards and all applicable codes, with installation performed by experienced personnel using corrosion-resistant screws with neoprene washers and manufacturer-approved sealants. The contractor must submit a project schedule, safety plan, product data, installer qualifications, warranties, maintenance instructions, and photo documentation. Work shall be completed within 30 calendar days from Notice to Proceed, with measurable outcomes including elimination of active leaks, prevention of water intrusion, extension of facility service life, and improvement of the Facility Condition Index. The related solicitation (140P5226R0014) is issued by the National Park Service Contracting Operations East as a combined synopsis/solicitation for commercial items under NAICS code 238160, with award on a firm fixed price basis evaluated by cost, technical approach, and relevant experience. A mandatory site visit is scheduled for July 30, 2026, at 10:00 AM CT, with proposals due electronically to tclark@ios.doi.gov by the stated closing date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5226R0014_Amd_0001.pdf | ||
| A04_PMIS_351945_SOW.docx | DOCX document | |
| Sol_140P5226R0014.pdf | ||
| Solicitation_Clauses.pdf | ||
| B04_DeKalb_County_Wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
STATEMENT OF WORK
Ridge Cap Repair – Maintenance Area Gym
1. Project Description The contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to remove and replace deteriorated ridge caps on the maintenance area gym building within the maintenance compound at Little River Canyon National Preserve. The intent of this project is to eliminate active leaks at the ridge, prevent future water intrusion, extend facility service life, and improve the Facility Condition Index (FCI).
2. Scope of Work
2.1 Demolition and Disposal
Remove existing ridge caps, fasteners, and accessories. Prevent damage to underlying roof panels. Dispose of materials per regulations.
2.2 Inspection of Substrate
Inspect roof ridge and notify NPS COR of any deterioration.
2.3 Installation of New Ridge Cap System
Install pre-finished steel ridge caps matching roof panels. Install all required fasteners, flashing, closure strips, and sealants.
2.4 Access and Safety
Provide scaffolding, ladders, and lifts as needed. Comply with OSHA and NPS safety policies.
2.5 Site Protection and Cleanup
Maintain organized work area. Protect adjacent buildings and restore disturbed areas.
3. Performance Requirements Comply with NPS Facility Management Standards and all applicable codes. Follow manufacturer instructions.
4. Technical Specifications
4.1 Materials
Pre-finished steel ridge caps, corrosion-resistant screws with neoprene washers, and manufacturer-approved sealants.
4.2 Installation Requirements
Remove existing ridge caps. Install square and aligned. Seal penetrations and edges.
5. Quality Assurance Materials shall comply with NPS standards. Installation to be performed by experienced personnel. Final inspection required.
6. Submittal Requirements Project schedule, safety plan, product data, installer qualifications, warranties, maintenance instructions, and photo documentation.
7. Deliverables Removal and disposal of existing ridge caps. Installation of new ridge cap system. Completion of final inspection.
8. Period of Performance Work shall be completed within 30 calendar days from Notice to Proceed.
9. Measurable Outcomes Replacement of deteriorated ridge cap, elimination of leaks, prevention of water intrusion, extension of service life, and improved FCI.