Sol_140P5225Q0013_Amd_0001.pdf
PDF 105 KB Posted
- Attached to
- CONTEXTUAL HISTORY STUDY FOR CIVILIAN CONSERVATION Federal contract opportunity
- Solicitation number
- 140P5225Q0013
About this file
This document is an Amendment (Amendment 0001) to Solicitation 140P5225Q0013 for a Contextual History Study for the Civilian Conservation Corps (CCC) at Vicksburg National Military Park. The amendment extends the solicitation period to 04/15/2025 and provides detailed responses to multiple contractor questions about the research project's scope, expectations, and deliverables.
Key details include a one-year performance period from 05/09/2025 to 05/09/2026, with the contractor expected to conduct historical research using the existing Cultural Landscape Report as a foundation. The study will focus on the CCC's work at Vicksburg, including its social and economic impacts, segregation policies, erosion control efforts, and broader context within New Deal-era projects. The government emphasizes a high-level narrative approach with limited depth, noting budget constraints. Contractors are encouraged to submit a technical narrative and are given flexibility in document length and format, with a preference for official archival documents and standard citations for any historical images used.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Warren_County_Wage_Rate.pdf | ||
| Past_Performance.pdf | ||
| Final_VICK_CCC_Context_Study_SOW.docx | DOCX document | |
| Sol_140P5225Q0013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P5225Q0013 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSW
Tupelo MS 38804 2680 Natchez Trace Parkway NPS, SER - West MABO
04/15/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/15/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THIS AMENDMENT IS TO ANSWER QUESTIONS RECEIVED AND EXTEND THE SOLICTATION PERIOD. ALL OTHER
TERMS AND CONDITIONS REMAIN THE SAME.
Q. Has the Government commissioned earlier versions of this work or portions of this work before from Contractor(s) or had this or similar work done by Government employees? If so, please explain. If some portion of the work was performed by some contractors, please provide the contract numbers associated with those portions of work.
A) There is a good discussion of the CCC work completed in the park in the Cultural
Landscape Report for Vicksburg National Military Park. The intent of this contract is to use the CLR as a foundation and supplement it with a thorough level (not exhaustive level) of research in archives to fill in gaps.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tara Clark
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5225Q0013/0001
Q) PWS Part 2(B): Does the Government have a specific list of non-Park repositories (beyond
NARA or local/state archives) that the contractor is expected to visit, or should the contractor assume full identification and scoping of all off-site repositories?
A) No, the contractor should identify and scope these. However, the contractor may find that NARA and state archives are sufficient.
3) PWS Part 2(B): Will Park staff provide any introductory letters or assistance for accessing privately held archives or special collections, or should the contractor budget time and effort for gaining access independently?
A) No, the contractor should gain independent access. The park can make an e-introduction to
Taylor Hegler, the former VICK employee who conducted her master's thesis if need be. Please note that the budget for this project is limited, so the contractor will need to balance budget constraints with thorough-level research; again, it is anticipated that most of the needed information is already included in the CLR and can be used as a foundation for this report.
Q) PWS Part 3(A): For the multi-chapter study, is there a preferred approximate word count or page count for the final narrative, or will the
Government accept any length that sufficiently covers the required topics?
A) No, this is up to the contractor to decide length based on information in the CLR and found in other archives.
Q) PWS Part 4(A): Does the Government have any preferred design templates or formatting guidelines for the waysides beyond text/image content (e.g., required color palettes, layout dimensions), or does ¿design¿ simply refer to suggested textual and visual content?
A) NPS uses standard waysides templates with an
NPS arrowhead and black banner. These templates can be found on the NPS Harpers Ferry Design
Center website and will be provided to the contractor by the park after contract award.
Q) PWS ¿Submittals & Reviews¿: Does the
Government have any target range for length or word count so that contractor and Government
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5225Q0013/0001 expectations can be aligned with respect to thoroughness, etc.?
A) No, the government does not have a target range for length.
Q) Price Schedule: Is there a recommended format or template to present the detailed cost breakdown (labor hours, travel, etc.), or should offerors simply provide a line-item cost proposal with sufficient narrative detail?
A) A simple price table was provided in the solicitation. However, if that is not sufficient you may submit your own pricing schedule.
Q) Proposal Submission: Is there a maximum page limit or file-size limit for the technical proposal, including font size restrictions, etc?
A) All proposals are being submitted electronically; please ensure that file sizes are kept within standard email limits to avoid delivery issues.
Q) Submissions: Besides the submission of the
Experience & Past Performance form, is the
Government expecting any other narrative document, for example a separate narrative
Technical Proposal? If only the Experience and
Past Performance form is requested from offerors, then where would offerors proposed "work plan" be placed? (Award process section states, "The following factors shall be used to evaluate quotations: 1. Technical capability of the quoter
... and merits of the work plan."
A) In addition to the required Experience and
Past Performance form, offerors are encouraged to submit a separate technical narrative, as it may help strengthen their proposal
Q) RFQ Clause 52.212-2(a) (¿Technical
Capability¿): Does the Government want a detailed staffing plan showing each labor category and estimated hours, or is a general description of the team¿s roles and responsibilities sufficient if it meets PWS qualifications?
A) A general description is fine
Q) RFQ Clause 52.212-2(b) (¿Past Performance¿):
Will the Government consider academic publications or publicly available historical research as part of past performance, or should
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5225Q0013/0001 references be limited to formal contract-based work?
A) Formal contract base work is preferred, but all credible and relevant experience will be considered.
Q) Past Performance Form p.1 (¿Project
Name/Value¿): Is the Government expecting offerors to submit both this form and a separate past-performance narrative in the proposal, or is completion of the form alone sufficient?
A) The form is sufficient
Q) Past Performance Form p.1 (¿Number of
Projects¿): Are all projects used as past performance to be those of the Prime contractor and subcontractor companies? Or can past performance also be from staff being proposed?
A) Past performance may include relevant projects by the prime/sub/or key personnel, as long as the experience clearly demonstrates the capability to perform the work
Q) Past Performance Form p.3 (¿Key Personnel
Qualifications¿): If the same individual will serve as both Principal Investigator and Project
Historian, should we list that person twice on separate forms or combine those roles on a single entry?
A) As long as it is clearly identified, a single entry is sufficient
Q) Segregated CCC Camps: Sources indicate certain
CCC companies at Vicksburg were racially segregated¿should the contractor¿s contextual study discuss segregation policy and its local effects in detail, or is a brief acknowledgement of separate camps sufficient?
A) A combination of both approaches is preferred.
This is an area of unexplored history in the park, so the contractor will need to address both.
Q) Depth of Economic/Social Analysis: Period documents show that CCC activity boosted
Vicksburg¿s businesses (e.g., supplies, labor)¿does the Government want a fully researched economic impact study using local records, or just a high-level overview of typical
New Deal benefits?
A) A high-level of typical New Deal benefits is
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5225Q0013/0001 preferred, with 1-2 specific examples at
Vicksburg is fine.
Q) Old Administration Building Relocation: Some references mention that the CCC-built administration building was later relocated¿should the contractor investigate and document those engineering/relocation details, or only provide the building¿s basic historical context?
A) The Old Administration Building that was built by the CCC has not been relocated and remains in its original location. The building has a double-level concrete basement, so there is no way the building could have been moved. Original construction drawings from the 1930s, clearly show it in its current location. It was common for the CCC to build and move their own administration buildings, but that is not the focus of this study.
Q) Comparison with Other Civil War Parks: CCC programs at Shiloh, Chickamauga, and other sites show similar work¿should the contractor conduct a detailed comparative analysis or just a concise summary of how Vicksburg¿s program fit into broader New Deal-era projects?
A) Concise summary is preferred. The budget for this project is limited.
Q) Local or Family Records: Some families in the region may have diaries, letters, or secondhand accounts of CCC camp life¿should the contractor seek out these privately held sources (e.g., via genealogical societies), or rely solely on archival/official documents already known to the
Park?
A) Official archival documents are preferred. The budget for this project is limited.
Q) Archival Photographs & Permissions: There are
1930s photos of CCC enrollees building roads, dams, etc.¿should the contractor perform in-depth provenance and usage-rights research for each image, or simply incorporate any available images with standard citations?
A) Please incorporate any available images with standard citations.
Q) Technical vs. Historical Erosion Control
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5225Q0013/0001
Details: CCC enrollees performed large-scale erosion control on Vicksburg¿s loess slopes¿should the contractor include technical data (e.g., soil types, slope stabilization methods), or only a historical narrative of why erosion control mattered?
A) A historical narrative of why erosion control mattered with 1-2 specific examples of what was performed at VICK will suffice.
Period of Performance: 05/09/2025 to 05/09/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .