Atch_1_-_Statement_of_Work_(SOW).pdf

PDF 3 MB Posted

Attached to
GUIS R5323190022 FP WATER PLANT UPGRADES
Solicitation number
140P5219Q0035
Issued by

About this file

Atch 1 - Scope of Work SOW

View the file

Other files

File Type Posted
Atch_2_-_DOL_WD_FL20190112_Heavy.pdf PDF
Sol_140P5219Q0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Plant Upgrades Scope of Work GUIS Page 1 of 26

SCOPE OF WORK

PMIS: 209388

Fort Pickens Water Plant Upgrades

Gulf Islands National Seashore (GUIS)

Gulf Breeze, FL

GUIS Page 2 of 26

Prepared by: Benjamin Marnell Date: March 2019

GUIS Page 3 of 26

1.0 Section 1: Introduction

1.1 Overview:

This document is a Scope of Work (SOW) for the National Park Service (NPS). The purpose of the SOW is to describe services associated with the Replacement of water system components at the Fort Pickens water plant facilities. Gulf Islands National Seashore (GUIS) is a unit of the National Park Service and Fort Pickens historic district is one of the sites associated with GUIS.

The contractor shall exercise management and operational control over and retain full responsibility for requirements as set forth in this SOW. The Government shall not exercise any supervision or control over sub-contractor(s) performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

Offerors are encouraged to propose process improvements and industry best practices in their proposals.

1.2 Site History:

What is it that entices people to the sea? Poet John Masefield wrote, “I must go down to the seas again, for the call of the running tide is a wild call and a clear call that may not be denied.”

Millions of visitors are drawn to the islands in the northern Gulf of Mexico for the white sandy beaches, the aquamarine waters, a boat ride, a camping spot, a tour of an old fort, or a place to fish.

1.3 Project Background:

The Fort Pickens Water Plant supplies water for visitor and staff use at the Fort Pickens Area of GUIS. Fort Pickens consists of Day Use and Campground Facilities. The system currently pumps from two wells, into two Hydro-Pneumatic Tanks, is chlorinated and then goes out to the distribution system. The park has recurring issues with disinfection by products.

This project will replace the aging air compressor, replace the chain link fence around the plant, prep and paint the interior and exterior of (2) two hydro pneumatic water tanks and make minor upgrades to the plant buildings.

1.4 Description of stakeholders and customers:

This project will be managed by a Project Manager (PM) from the NPS Southeast Regional Office in Atlanta, Georgia. The park superintendent and staff are the project’s primary stakeholders for this work. The park will remain open to visitors while the work of this contract is executed, and the contractor shall state in his proposal how he intends to provide visitor access during construction. Visitors are the park’s primary customers. Occasional contact with visitors by the contractor is likely. As all resources and operations of the NPS are ultimately paid for by the U.S taxpayer, any visitors that the contractor comes into contact with while accomplishing this work should be considered a customer and be accorded all reasonable courtesy.

2.1 Section 2: Scope of Work

2.1 Objectives of the Project:

The primary objectives of the project are:

• Pre-proposal site visit is encouraged. If desired, coordinate with Project Manager

• Review photos and information provided

• Construct upgrades to the plant as per the below objectives

GUIS Page 4 of 26

Specifically, the contractor is expected to accomplish the following objectives:

• Pre-Construction Site Visit is required. This should be coordinated with the project manager

• Contractor responsible to verify all existing site conditions.

• Contractor will demolish the existing chain link fence, to include all fencing, posts, gates and accessories.

• Contractor will remove the existing air compressor in the compressor building.

• Install new air compressor – Quincy QR-325 or approved equivalent.

o Dual motor o Automatic water drain o All switches and controls o Cut in/out pressures set per Park Water Plant Operator Specifications

• Install new 6’, no climb Chain Link Fence, with gates located according to drawing in Attachment B o Gate 1: to be NLT 3’ wider than pad that generators are sitting on, centered on the pad o Gate 2: 15’ Wide, centered on Chlorinator Bldg.

o Gate 3: Centered on east end of compressor building, NLT 6’ wide o All gates shall be lockable

• Clean and prep and paint the interior and exterior of the (2) two Hydro-Pneumatic Tank:

(1) one - 7,500 gallon tank and (1) one – 10,000 gallon tank.

• Clean and repair/repaint the concrete floor in the air compressor building. Matching existing color using Hi-Tech Phoenix Flooring Epoxy or approved equivalent.

• Clean and repaint the piping in the air compressor building from well head.

• Clean and repaint the existing water tanks, to match existing color.

• Remove fire hydrant near chlorinator building and cap the line.

• Extend 6” flush line from chlorinator building to the fence line.

• The contractor will secure any required permits from the federal, state, county or local offices

• Protect landscaping and adjacent areas/waters from damage while the work is being executed. Use of temporary fencing is authorized.

• Site is to be left clean and orderly at the end of each day.

• All work will be performed in a safe, professional manner according to accepted industry standards.

• Contractor is responsible for securing project materials and tools

• Contractor is solely responsible for marking of all public Utilities. Park will work with the contractor to mark park owned water lines.

• Prepare and submit all required quality assurance reporting documentation in a timely manner.

• Accomplish all demolition and construction activities within the established construction time limits

• Demobilize from the site. Remove all construction associated debris and equipment from the worksite. Rehabilitate all areas affected by the work to match existing conditions. Regrade, fill holes, and reseed all lawn areas damaged by the work. Seed mix will be provided by the park facility manager.

• Close Project. Complete all administrative requirements necessary to close project within 2 weeks of final acceptance of site work.

The location of the work is shown in SOW Attachment B.

GUIS Page 5 of 26

2.2 Contractor Responsibilities:

2.2.1 Personnel and Equipment:

The contractor shall provide all personnel, expertise, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and services necessary to perform the work as defined in this SOW except for those items specified as government furnished property and services. Any quantities, drawings, or photos in this SOW are for reference/estimates only; the contractor is solely responsible to verify all project quantities and existing site conditions.

2.2.2 Documentation:

The contractor shall be responsible for the documentation of all efforts to include architectural/engineering drawings, shop drawings, product submittals, licensing agreements, quality control documents, material testing results, permitting, and any other documentation required per this SOW or the CO.

2.3 Work Location:

The work will be performed at the Fort Pickens Visitor Area of the Gulf Islands National Seashore.

For Pickens is located on the west end of Santa Rosa Island.

2.4 Scope of Work:

The Contractor will design and execute the work in coordination with the NPS as described in Section 2.1 and other sections of this Scope of Work.

2.4.1 Materials Quality:

The NPS requires that commercial grade products with a service life of no less than 20 years be used for products that are not mentioned specifically by name.

2.4.2 Codes and Standards:

The NPS requires that all work to be performed to all applicable local, county and state codes and standards.

2.4.3 Aesthetic Quality:

The NPS requires that all work, including those elements that are typically hidden from normal view or inspection, be installed in a neat and workmanlike manner.

2.5 Period of Performance:

The period of performance shall be 120 days from issuance of a notice to proceed by the NPS Contracting Officer.

2.6 Required Plans and Submittals:

2.6.1 Quality Control Plan (QCP):

The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

GUIS Page 6 of 26

The QCP is to be delivered to the COR in accordance with the submittal register provided in Attachment A. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. A revised copy of the QCP shall be submitted to the COR within 5 working days when changes are made thereafter.

2.6.2 Safety/Accident Reporting Plan

The contractor shall develop a Safety/Accident Reporting Plan to cover the following:

Prior to a Notice to Proceed order is issued, the Contractor shall submit and receive approval on a site specific Safety Plan.

The contractor and their employees will comply with all Occupational Safety and Health Administration (OSHA) standards at all times.

The contractor is responsible for helping safeguarding the project site as work is being performed. Appropriate signs, warning devices, and barriers shall be used as appropriate to protect the public, government and contractor employees.

The Contractor shall ensure that all reasonable precautions are taken to protect the public in the areas where work is being performed.

The Contractor shall immediately report to the Contracting Officer Representative (COR) any potential hazards found by his employees on the project.

The Contractor shall not allow any persons, except employees, into work areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under this contract.

All reportable accidents, which are those resulting in death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100, shall be reported to the Contracting Officer and COR immediately. Within 7 days of a reportable accident, the contractor shall fill out and forward to the Contracting Officer an Accident/Property Damage Report (Form

CM-22).

If the Government determines that the Contractor did not use reasonable care for Government property and caused damage to or loss of said property, the Contractor shall repair the damage or replace the property, at no cost to the Government. If the Contractor fails or refuses to make such repairs or replacement, the Contractor shall be liable for the cost, which will be deducted from the contract payment.

2.6.3 Inclement Weather Preparedness/Hurricane Plan

Prior to commencement of work, Contractor must provide weather preparedness plan in writing to the Park should unfavorable weather patterns develop during construction.

The Contractor and Park shall mutually agree upon a plan to secure the site and/or materials. No reimbursement or additional cost will be applied to Park for carrying out the plan. The Contractor shall not be entitled to, and the Park shall not be responsible for, any claim for additional compensation as a result of Contractor's compliance with the weather preparedness plan.

GUIS Page 7 of 26

2.6.4 Design, Product, and Other Project Management Submittals:

Design, product, and other submittals required by the COR to effectively manage the project are indicated in the submittal list provided in SOW Attachment A. A submittal register will be provided under separate cover after the contract is awarded. The Contractor will provide the required submittals to the NPS in accordance with the procedures described in SOW Attachment A.

2.7 Recognized Holidays:

The contractor is not authorized to work at the site on Federal Holidays unless specifically authorized in writing by the NPS Contracting Officer. Requests to work over a holiday must be received no less than 3 working days prior to the holiday.

2.8 Hours of Operation:

The contractor is responsible for conducting business at the site between the hours of 7:30 am to 4 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Work outside of these hours will not routinely be approved, and must be requested with the Park and COR no less than 72 hours prior.

The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

2.9 Post Award Conference/Periodic Progress Meetings:

The Contractor agrees to attend a post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.

The contractor will submit a Summary Report of the Post Award/Pre-Construction Meeting within 3 Days of the meeting to the CO/COR. This Summary Report will be a synopsis of the Post Award Meeting and will address any further questions or concerns the contractor needs answered before proceeding.

The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

2.10 Construction Staging Area

A map indicating the construction staging area has been designated by the GUIS Facility Manager, see Attachment B. Installation of portable fencing is permitted. Connex boxes are permitted. The construction staging area will be maintained in a neat and orderly condition at all times.

2.11 Construction Schedule

As per Submittal Register

2.12 Contracting Officer Representative (COR):

GUIS Page 8 of 26

The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

2.13 Key Personnel: The following personnel are considered key personnel by the government:

Contracting Officer (CO):

TBD

Contracting Officer’s Representative (COR) Scott Mapes Dept. Chief of Facilities Management Gulf Islands National Seashore 1801 Gulf Breeze Parkway Gulf Breeze, FL 3563 O: 850-934-2627 C: 850-393-8036 Email: scott_mapes@nps.gov

GUIS Facility Manager Gary Stansberry Chief of Facilities Management Gulf Islands National Seashore 1801 Gulf Breeze Parkway Gulf Breeze, FL 3563 O: 850-934-2609 C: 850-232-3636 Email: gary_stansberry@nps.gov

2.13.1 Site Superintendent:

The contractor shall provide a site superintendent who shall be responsible for the performance of the work. The site superintendent shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The site superintendent or alternate shall be present on site at all times when the contractor’s employees are working.

2.13.2 Alternate Site Superintendent:

The alternate site superintendent shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract when the Site Superintendent is not on site.

The site superintendent or alternate shall be present on site at all times when the contractor’s employees are working.

3.0 Section 3: Government Furnished Items and Services

mailto:scott_mapes@nps.gov mailto:gary_stansberry@nps.gov

GUIS Page 9 of 26

3.1 Services

The Government shall supply no service to the contractor.

3.2 Facilities

Contractor use of Visitor Center restrooms will be prohibited. A staging area will be designated for the contractor’s use. Pota-Lets can be placed at the Staging Area. See Attachment B

3.3 Utilities

The Government will provide access to water and electricity. Water is available to the contractor is supplied via a standard garden hose style connection at the water plant. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish appropriate work tasks.

3.4 Equipment

The Government will provide no equipment to the Contractor.

3.5 Materials

Acceptable grass seed and fertilizer mix for any reseeding The Government will provide no other materials to the Contractor.

4.0 Section 4: Project Objectives and Measures

4.1 Confirm the Functional Requirements of the Work.

4.1.1 Task Description:

The contractor will be familiar with the requirements stated in this scope of work and meet with the project manager and park staff to gain a clear understanding of the design and functional requirements of work desired.

4.1.2 Acceptable Quality Level:

The CO/COR will organize and conduct a pre-design/construction meeting with the contractor, park superintendent and staff within three weeks of Contract Award. The objective of the meeting is to discuss and coordinate the Contractor’s proposed approach to accomplishing the work, establish clear lines of communication and authority, and confirm specific details of the timeline for completion. The contractor will prepare and submit a narrative summary or meeting minutes as a submittal. The summary is intended to capture any additional information requirements or questions the contractor has prior to construction commencing, and is typically 2 to 4 written pages in length. The summary document need not contain sophisticated graphics or images.

4.2 Confirm Existing Conditions, and Provide Design/Product Submittals/Samples

4.2.1 Task Description:

The contractor is solely responsible to confirm existing site conditions and measurements.

Design and shop drawings, material samples and product submittals related to the proposed work will be prepared and submitted the NPS. NPS approval will be obtained prior to ordering materials. Work will be executed as described in the approved drawings and submittals.

4.2.2 Acceptable Quality Level:

GUIS Page 10 of 26

All shop drawings of the proposed work will be prepared using an electronic drawing program such as AutoCad or similar. Drawings will be scaled and contain detail sufficient to communicate the intent of the designer and permit a thorough and detailed on-site inspection of the work by NPS inspectors. See Attachment A for list of drawing requirements. Hand drawn sketches of the proposed work are not acceptable shop drawings and will be rejected without review. Product submittals may be cut sheets but must clearly indicate the specific item to be used. Product submittals that do not indicate the specific item to be approved will be rejected without review.

4.3 Protect Existing Resources from Damage:

4.3.1 Task Description:

Protective material, barriers, and marking tape will be installed as necessary to ensure that the foundation, walkways, and landscape are reasonably protected from impact damage during the work, and to prevent visitors from entering the area.

4.3.2 Acceptable Quality Level:

100% compliance

4.4 Demolish the existing fence

4.4.1 Task Description:

Demolish and remove the existing fencing and accessories. Minimize disturbance to the surrounding areas.

4.4.2 Acceptable Quality Level:

100% of fence is removed and the area is cleaned prior to construction start.

4.5 Clean and prep and paint the interior and exterior of the (2) two Hydro-Pneumatic Tanks

4.5.1 Task Description:

Prep and paint the interior and exterior of (2) two hydro-pneumatic tanks: (1) one 7,500 gallon tank and (1) one 10,000 gallon tank. The interior tank paint and primer materials will need to be compatible with potable water industry standards and approved by the Environmental Protection Agency (EPA) and the COR.

4.5.2 Acceptable Quality Level:

100% of work is completed, inspected, and accepted by NPS Project Manager and GUIS Facility Manager.

4.6 Remove and Reinstall Air Compressor

4.6.1 Task Description:

Remove existing air compressor and any accessories to be replaced. Reinstall similar or equivalent model per Section 2.1.

4.6.2 Acceptable Quality Level:

4.7 Extend Flush Line at Chlorinator Building

GUIS Page 11 of 26

4.7.1 Task Description:

Extend the 6” flush line at the chlorinator building. Line should go through or under new fence and installed so as to reduce erosion on the ground during discharge.

4.7.2 Acceptable Quality Level:

4.8 Repair/repaint floor of air compressor building

4.8.1 Task Description:

Clean, repair and repaint the floor of the air compressor building per Section 2.1

4.8.2 Acceptable Quality Level:

4.9 Clean and repaint tanks and piping in air compressor building

4.9.1 Task Description:

Clean all surfaces as recommended and repaint matching existing color per paint manufacturer’s application instructions.

4.9.2 Acceptable Quality Level:

4.10 Quality Assurance Reporting

4.10.1 Task Description:

Daily reports will be consolidated and submitted to the COR weekly. Project management submittals will be submitted and approved as indicated on the Transmittal Register. Product submittals will be approved in advance of procurement and installation.

4.10.2 Acceptable Quality Level:

90% of daily reports will be received complete and on time. 100% of pre-construction project management submittals will be received and approved prior to procurement and installation.

4.11 Demobilize Project

4.11.1 Task Description:

Remove all construction associated debris and equipment from the worksite. Repair any damage to adjacent structures, and reseed damaged lawn areas affected by departure.

4.11.2 Acceptable Quality Level:

4.12 Project Closure

4.12.1 Task Description:

GUIS Page 12 of 26

Complete all administrative requirements needed to close the project within 2 weeks of final acceptance of site work.

4.12.2 Acceptable Quality Level:

GUIS Page 13 of 26

SOW Attachment A Submittal Procedures and List of Required Submittals

SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government’s responsive action.

B. Informational Submittals: Written information that does not require Government’s responsive action. Submittals may be rejected for not complying with the requirements.

1.3 GENERAL SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Review them for legibility, accuracy, completeness, and compliance with Contract Documents.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list.

The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

1. Action Submittals

GUIS Page 14 of 26

a. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

b. Re-submittal Review: Allow 10 days for review of each re-submittal.

2. Informational Submittals

a. Review: Allow 10 days for review of each submittal.

D. Approved Equals:

1. For each item proposed as an “approved equal,” submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

E. Additional Copies: Unless additional copies are required for final submittal, and unless Contracting Officer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned.

F. Transmittal: Package each submittal individually and appropriately for transmittal and handling.

Transmit each submittal using a transmittal form. Contracting Officer will discard submittals received from sources other than Contractor.

1. CM-16 Transmittal Form: All material submittals shall be transmitted using National Park Service form CM-16. (This form can be downloaded from the Workflows website at http://www.nps.gov/dscw/con_subreview21.htm.) No action will be taken on a material submittal item unless accompanied by the transmittal form.

2. Documents required in division 1 are to be delivered under separate cover letter. Do not use the CM-16 Transmittal form for these documents.

G. Identification:

http://www.nps.gov/dscw/con_subreview21.htm

GUIS Page 15 of 26

1. Include the following information on each transmittal sheet:

a. Project name, Park, PMIS number, Contract number.

b. Date.

c. Submittal number or other unique identifier, including revision identifier.

i. Submittal number shall be a sequential number (e.g., 001). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., 001.A).

H. Re-submittals: Make re-submittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Re-submit submittals until they are marked “Approved” or “Approved with notations”.

I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

J. Use for Construction: Use only final submittals with mark indicating “Approved” or “Approved with notations.

1.4 CONTRACTOR’S USE OF CAD FILES

A. General: NPS has no CAD files associated with the project.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer’s written recommendations.

b. Manufacturer’s product specifications.

c. Manufacturer’s installation instructions: When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of

GUIS Page 16 of 26 instructions to Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

d. Manufacturer’s catalog cuts: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

e. Wiring diagrams showing factory-installed wiring.

f. Printed performance curves.

g. Operational range diagrams.

h. Compliance with specified referenced standards.

i. Testing by recognized testing agency.

4. Number of Copies: Submit four copies of Product Data, unless otherwise indicated.

Contracting officer will return one copy. Retain copy as a Project Record Document.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Shop work manufacturing instructions.

g. Templates and patterns.

h. Schedules.

i. Notation of coordination requirements.

j. Notation of dimensions established by field measurement.

k. Relationship to adjoining construction clearly indicated.

l. Seal and signature of professional engineer if specified.

m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

2. Sheet Size: Submit shop drawings electronically in .pdf format. When requested specifically, submit paper copies of shop drawings on sheets at least 8.5 by 11 inches but no larger than 30 by 40 inches.

3. Number of Copies: Submit four copies of each submittal. Contracting Officer will return one copy.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

GUIS Page 17 of 26

c. Sample source.

d. Submittal Number and title of appropriate Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

4. Samples for Initial Selection: Submit manufacturer’s color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit two full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer’s product line. Contracting Officer will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit four sets of Samples. Contracting Officer will retain three Sample sets; remainder will be returned. Retain Sample set as a Project Record Sample.

E. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the National Park Service to approve these materials.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals as required in this SOW or as requested by the CO.

1. Number of Copies: Submit Informational Submittals electronically whenever possible.

When submitting on paper, provide three copies of each submittal, unless otherwise indicated. Contracting Officer will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Informational submittals that do not comply with the requirements specified in the Contract Documents will be rejected and one copy will be returned.

GUIS Page 18 of 26

PART 3 - EXECUTION

3.1 CONTRACTOR’S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions.

3.2 CONTRACTING OFFICER’S ACTION

A. General: Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; or submittals do not show evidence of Contractor’s approval.

1. Any work done or orders for materials or services placed before approval shall be at the Contractor’s own risk.

B. Action Submittals: Contracting Officer will review each submittal, make marks to indicate corrections or modifications required, and return one copy. Contracting Officer will annotate the CM-16 Transmittal Form indicating the action taken, as follows:

1. The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.

C. Informational Submittals: Contracting Officer will review each submittal and will not return it, or will reject and return one copy if it does not comply with the requirements. Contracting Officer will forward each submittal to appropriate party.

D. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.

END OF SECTION

GUIS Page 19 of 26

LIST OF REQUIRED SUBMITTALS

Submittals Due Prior to Issuance of Notice to Proceed

1.1 Contracting General Conditions - includes bond, insurance, list of subcontractors, and all other legal documents and certifications required by the CO to execute the contract. Submittals should be sent directly to CO for approval. No transmittal slip required.

2.0 Submittals Due After Issuance of Notice to Proceed and Prior to Start of Work

2.1 Designation letter and description of qualifications of Superintendent, and Assistant

Superintendent

2.2 List of Sub-Contractors

2.3 Schedule of Values

2.4 Quality Control Plan

2.5 Accident Prevention / Safety Plan / Spill Plan

2.6 Inclement Weather/Hurricane Plan

2.7 Project Schedule

2.8 Coordination Meeting Summary Report

3.0 Submittals Due Prior to Start of On Site Construction

3.1 50% Plans and specs for park review and comment – See Appendix for Drawing Requirements 1 Each half sized hard copy to the Park Facility Manager and Project Manager of drawings. 1

Each hard copy of Specs to Park Facility Manager and Project Manager. Electronic copy to Project Manager of all plans specs.

3.2 95% Plans and specs for park review and comment – See Appendix for Drawing Requirements 1 Each half sized hard copy to the Park Facility Manager and Project Manager of drawings. 1

Each hard copy of Specs to Park Facility Manager and Project Manager. Electronic copy to Project Manager of all plans & specs.

95% Plans/Specs to include:

3.2a Spec sheets All Lumber/PT Lumber 3.2b Spec sheets for Roofing material to include color selection 3.2c Spec sheets for siding material to include color selection 3.2d Spec sheets for LED Lighting 3.2e Spec sheets for electrical items; conduit, conductors, switches, panels, etc.

3.2f Spec sheets for boat lifts 3.2g Spec sheets for plumbing items; pipe, spigots, etc.

3.3 Final approved plans for construction – See Appendix for Drawing Requirements 100% - For Construction Plans and Specs for park review and comment 1 Each half sized hard copy to the Park Facility Manager and Project Manager of drawings. 1

Each hard copy of Specs to Park Facility Manager and Project Manager. Electronic copy to Project Manager of all plans & specs.

3.4 Proposed grass seed and fertilizer mix

4.0 Submittals Due During Project Execution and Prior to Final Inspection Request

4.1 Contractor Quality Control Daily Reports

4.2 Project schedule updates – To be submitted with progress payment invoice requests

4.3 Written results from any County required inspections

5.0 Submittals Due at Close Out Meeting

5.1 As-built drawings

GUIS Page 20 of 26

1 Each Full and Half Sized Hard Copy to the park. One electronic set of all as-built drawings, project documents, photos, etc. on Thumb Drive, one each for the park and one for the PM.

5.2 Product and Workmanship Warranties, O&M Manuals. One Hard copy given to the park. Digital files to be included on Thumb Drives above.

An electronic transmittal register will be provided by the COR under separate cover after contract award.

GUIS Page 21 of 26

SOW Attachment B

Project Photos

Project Location

Fort Pickens/Santa Rosa Island, Google Earth Image

GUIS Page 22 of 26

SOW Attachment B

Project Location

FORT PICKENS WATER PLANT LOCATION

GUIS Page 23 of 26

SITE MAP

FORT PICKENS WATER PLANT

GUIS Page 24 of 26

COMPRESSOR BUILDING INTERIOR AND EXISTING COMPRESSOR

GUIS Page 25 of 26

FLUSH DISCHARGE LINE ON CHLORINATOR BUILDING

GUIS Page 26 of 26

WATER TANKS REQUIRING INTERIOR AND EXTERIOR PAINTING

PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government’s responsive action.
B. Informational Submittals: Written information that does not require Government’s responsive action. Submittals may be rejected for not complying with the requirements.
1.3 GENERAL SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Review them for legibility, accuracy, completeness, and compliance with Contract Documents.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Secti...
C. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of ...
1. Action Submittals
a. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
b. Re-submittal Review: Allow 10 days for review of each re-submittal.
2. Informational Submittals
a. Review: Allow 10 days for review of each submittal.
D. Approved Equals:
1. For each item proposed as an “approved equal,” submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of r...
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waives all claims for additional expenses that may be incurred as a result of the substitution.
E. Additional Copies: Unless additional copies are required for final submittal, and unless Contracting Officer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.
1. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned.
F. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Contracting Officer will discard submittals received from sources other than Contractor.
1. CM-16 Transmittal Form: All material submittals shall be transmitted using National Park Service form CM-16. (This form can be downloaded from the Workflows website at http://www.nps.gov/dscw/con_subreview21.htm.) No action will be taken on a ma...
2. Documents required in division 1 are to be delivered under separate cover letter. Do not use the CM-16 Transmittal form for these documents.
G. Identification:
1. Include the following information on each transmittal sheet:
a. Project name, Park, PMIS number, Contract number.
b. Date.
c. Submittal number or other unique identifier, including revision identifier.
i. Submittal number shall be a sequential number (e.g., 001). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., 001.A).
H. Re-submittals: Make re-submittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Re-submit submittals until they are marked “Approved” or “Approved with notations”.
I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on trans...
J. Use for Construction: Use only final submittals with mark indicating “Approved” or “Approved with notations.
1.4 CONTRACTOR’S USE OF CAD FILES
A. General: NPS has no CAD files associated with the project.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer’s written recommendations.
b. Manufacturer’s product specifications.
c. Manufacturer’s installation instructions: When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions to Contracting Officer and keep another complete set of instructions at the proj...
d. Manufacturer’s catalog cuts: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.
e. Wiring diagrams showing factory-installed wiring.
f. Printed performance curves.
g. Operational range diagrams.
h. Compliance with specified referenced standards.
i. Testing by recognized testing agency.

4. Number of Copies: Submit four copies of Product Data, unless otherwise indicated. Contracting officer will return one copy. Retain copy as a Project Record Document.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Shop work manufacturing instructions.
g. Templates and patterns.
h. Schedules.
i. Notation of coordination requirements.
j. Notation of dimensions established by field measurement.
k. Relationship to adjoining construction clearly indicated.
l. Seal and signature of professional engineer if specified.
m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
2. Sheet Size: Submit shop drawings electronically in .pdf format. When requested specifically, submit paper copies of shop drawings on sheets at least 8.5 by 11 inches but no larger than 30 by 40 inches.
3. Number of Copies: Submit four copies of each submittal. Contracting Officer will return one copy.
D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.
1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.
2. Identification: Attach label on unexposed side of Samples that includes the following:
a. Generic description of Sample.
b. Product name and name of manufacturer.
c. Sample source.
d. Submittal Number and title of appropriate Specification Section.
3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
4. Samples for Initial Selection: Submit manufacturer’s color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
a. Number of Samples: Submit two full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer’s product line. Contracting Officer will return submittal with options selected.

This is the start of the file's text. The full file is on GovTribe.