B08_Attachment_1_SOW_Install_Fencing_and_Gates_FRST.pdf
PDF 382 KB Posted
- Attached to
- FRST- INSTALL FENCING, GATES AND SIGNAGE
- Solicitation number
- 140P4524R0030
About this file
This document is a Statement of Work (SOW) for the installation of fencing, gates, and signage around quarry sites at the Brandywine Valley unit of the First State National Historical Park in New Castle, Delaware.
The SOW outlines the scope of work, including furnishing all materials, supplies, supervision, coordination, and management necessary to install approximately 3,450 feet of pressure treated split rail fencing, four 10-ft x 4-ft 2-in 6-rail powder-coated tube gates, and eight 12-in x 18-in aluminum warning signs. The work is to be completed within 6 months from the date of contract award, estimated to be July 1, 2024 to December 31, 2024. The SOW provides details on materials, installation methods, project coordination, safety requirements, environmental protection, and cleanup and restoration. The related federal contract opportunity is Solicitation Number 140P4524R0030, issued by the Department of the Interior National Park Service Northeast Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST STATE NATIONAL HISTORICAL PARK
10 MARKET STREET
NEW CASTLE, DE 19702
Installation of fencing, gates, and signage around Park quarry sites at the Brandywine Valley unit
SCOPE: In accordance with the terms and conditions of the contract, the Contractor shall perform the work of this task order for the National Park Service (NPS) as described below for the referenced project.
The Contractor shall provide all materials, supplies, supervision, coordination, and management necessary to complete the work. The Contractor shall perform all tasks as required to complete the work.
PERFORMANCE PERIOD: The work of this task agreement shall be completed within 6 months from the date of contract award (est. July 1, 2024 to December 31, 2024).
CONFIDENTIALITY: The information developed under this task order is the property of the U.S. government and shall be kept in strict confidence.
PROJECT IDENTIFICATION: The work of this project shall consist of the services described below for the referenced project. In all related documents, the project shall be referred to as “Installation of fencing, gates and signage around quarry sites at the Brandywine Valley unit, First State National Historical Park”.
Reference numbers to be used:
PMIS Number: 322263 PEPC Number:
1 INTRODUCTION
1.1 LOCATION & DESCRIPTION OF PARK
First State National Historical Park
Brandywine Valley unit 400 Ramsey Road Wilmington, DE 19803
First State National Historical Park (FRST) is made up of six sites spread throughout the state of Delaware. The Brandywine Valley unit (previously known as Beaver Valley) and the Sherriff’s House in New Castle are owned and managed by the National Park Service, while the remaining five sites are owned and managed by state and local partners who provide tours and programs to the public.
Brandywine Valley unit consists of approximately 1,359 acres of rolling hills and wooded areas along the Brandywine River and the arced border between northern Delaware and southern Pennsylvania. It is an integral component and legacy of Quaker industrialist William Poole Bancroft’s vision for open park lands and the conservation of green space as part of his larger philanthropic community planning experiment in the City of Wilmington that drew upon national and international currents of early 20th century social and industrial reform.
1.2 BACKGROUND
First State National Historical Park has vestiges of quarries at the Brandywine Valley unit. The Ramsey Quarry site covers approximately 0.64 acre and is located about 1,000 feet north of Ramsey Road. The largest surface mine feature is approximately 65 by 60 feet with a steep drop off about 28+ feet deep. The Beaver Valley Quarry covers approximately 1.69 acres and the is located about 500 feet from Walker Road. The two largest surface mine features are approximately 120 by 100 feet with unknown depth and 130 by 56 feet and approximately 50 feet deep. All the site features are within 10 feet of the existing multi-use trail system.
The sites have been characterized and assessed for environmental and safety hazards. This project proposes to install fencing and signs around the surface mines. The proximity of the quarry features to the trail is of great concern for visitor safety as some features are not highly visible to trail users and there are steep drop offs on the largest surface mine features.
Additionally, several of the surface mine features are being actively used by mountain bikers causing earth movement along the edges and/or within the features.
1.3 Site Visit
To be determined when this scope of work is distributed.
2 SCOPE OF SERVICES
The work outlined herein calls for the installation of pressure treated split rail fencing surrounding quarry features. The contractor will install approximately 3,450 feet of fence to mitigate safety risks at two abandoned surface mining sites and reduce impacts on cultural and natural resources, including access gates and signage.
The Contractor shall furnish all equipment and sufficient personnel for the installation of the fencing and gates, and all related incidental work as in accordance with the bid schedule and specifications stated herein.
3 PROJECT COORDINATION AND ORIENTATION
3.1 POINTS OF CONTACT
Park Point of Contact (POC): Sonja Bookout or other park personnel as designated by the
Superintendent Regional Technical Representative: Dr. Peter Sharpe Geological Resource Division Technical Representatives: Anthony Gallegos and Sarah Russell Contracting Officer Representative (COR): Alan McLoughlin
Contracting Officer: Matthew Keith
3.2 COORDINATION
3.2.1 The POC, or other park personnel as designated by the Superintendent, will coordinate work scheduling and project logistics.
3.2.2 The COR will coordinate project start-up and provide oversight.
3.2.3 The COR will be responsible for acting on behalf of the Contracting Officer on all matters of work within the scope of the contract.
3.2.4 The contractor is responsible for notifying the COR in writing all work that is beyond or adjustments to the scope of the contract and include a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, and equipment required. The COR will evaluate the proposal and if valid will seek approval from the Contracting Officer.
Approval of changes in the work that might result in adjustments in cost to Government and/or Contract time, and the approval of payment requests are reserved for the Contracting Officer. The acceptance of any change affecting price, terms, or delivery by the Contractor without the specific approval of payment requests, is reserved for the Contracting Officer.
Failure of the contractor to obtain the approval of the Contracting Officer for work beyond the scope of the contract will release the government from any obligation to pay for services claimed.
4 GENERAL PROVISIONS
4.1 PROFESSIONAL QUALIFICATIONS
4.1.1 All workers shall, through related training and on-the-job experience, be familiar with the technical aspects and equipment used in the specifications stated herein.
4.2 EQUIPMENT REQUIREMENTS
4.2.1 All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed.
4.3 SAFETY
4.3.1 All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed.
4.3.2 The Contractor shall provide, erect, and maintain all necessary barricades and traffic cones and sufficient site guards to insure the safe flow of pedestrian and vehicular away from the work area.
4.3.3 Spill containment kits and fire extinguisher shall be on-site at all times.
4.4 SUBMITTALS
4.4.1 Contractor shall submit a Safety Plan that illustrates the location of the work site and locations of safety measures to keep visitors out of the work zone prior to commencement of work activities. The safety plan shall also include an emergency plan and shall list contractor points of contact.
4.5 WORK AREA & HEAVY EQUIPMENT
4.5.1 Contractor shall confine the work, parking of vehicles, and all other operations in connection with this contract to the specified hours and work areas approved by the COR.
Large equipment may be stored on-site as specified by the COR.
4.5.2 The contractor shall not permit heavy equipment or vehicles off hard surface roads without the expressed permission of the COR. Protective matting shall be used to minimize damage to adjacent tree root zones and turf. All damage resulting from such operations shall be repaired to its original condition or to the satisfaction of the COR at no additional cost to the Government.
4.5.3 All vehicles and equipment used must be free of visible mud and plant material to prevent the spread of invasive species into the park. Vehicles and equipment shall be cleaned and free of soil and plant material before entering the park.
4.5.4 The contractor shall ensure that all refueling of equipment on site shall have spill containment pads in position prior to refueling activities.
4.5.5 The entire park area is open to the public.
4.6 RESPONSIBILITY REGARDING EXISTING STRUCTURES, UTILITIES,
EXISTING PLANT MATERIAL AND OTHER LANDSCAPE FEATURES
4.6.1 The contractor will be held responsible for any damages to, and for maintenance and protection of existing structures. Contractor shall patch, repair or replace portions of sidewalks, curbs, gutters, streets, manholes, and the like that are damaged in connection with work under this contract or as a result of operations thereunder. Materials and methods shall conform to the current standards for the area damaged, match existing on-site materials, shall meet the approval of all cognizant officials and the COR. All damaged areas shall make smooth, satisfactory, and imperceptible transitions to existing adjacent work, and shall be performed without additional expense to the Government.
4.6.2 The contractor will be held responsible for any damages to, and for maintenance and protection of existing utilities. The existence and location of underground utilities shall be investigated and verified in the field by the contractor before starting work. To locate utilities in the field, contact Miss Utility on 1-800-257-7777, forty-eight (48) hours in advance of work.
4.6.3 The contractor shall preserve and protect all existing vegetation such as trees, shrubs, and grass areas adjacent to installation of the fence which do not reasonably interfere with work. The contractor shall be responsible for all unauthorized cutting or damage to trees and shrubs, including damage due to careless operation of equipment, stockpiling of materials, or tracking of grass and other surfaced areas by equipment. Such damaged areas or materials shall be restored, repaired, or replaced by the contractor, as directed by the COR, at no additional cost to the Government.
4.6.4 The contractor shall use best management practices for soil conservation. The contractor shall be responsible for all unauthorized ground disturbance, including damage due to careless operation of equipment and stockpiling of materials. Materials and methods shall conform to the current standards for the area damaged, match existing on-site materials, and shall meet the approval of all cognizant officials and the COR. All damaged areas shall make smooth, satisfactory, and imperceptible transitions to existing adjacent work, and shall be performed without additional expense to the Government.
4.7 RESOURCE PROTECTION
4.7.1 In the event of the discovery of unanticipated cultural resources, work shall halt, and the
COR and Park Technical Representative will be contacted. Work will not resume until the COR gives approval to resume.
4.7.2 The contractor shall comply with the Migratory Bird Act of 1918.
4.8 CLEANUP AND RESTORATION
4.8.1 The contractor must furnish all labor, materials, and equipment for daily cleanup and restoration of all disturbed areas or features, which have been damaged during the course of this contract.
4.8.2 All debris shall be removed from the job site on a daily basis.
4.8.3 The contractor shall be responsible for restoring the project area and adjacent staging areas to the approximate original site conditions, including replanting of vegetation, soil and rock arrangement.
4.8.4 Any materials such as gravel, soil, straw, and mulch must be weed/seed free.
5 SCHEDULE
5.1 SITE WALK-THROUGH
A site walk-through will be held with the contractor, POC, and COR within 30 days of the issuance of the task order to review scope. The specific dates of work will be determined based on weather and ground conditions.
5.2 ON-SITE WORK
5.2.1 The contractor shall notify the COR and POC 48 hours prior to beginning any work.
Work shall be performed between the hours of 8:00 a.m. and 4:00 p.m. Monday through Friday, Federal holidays excluded, unless authorized in writing by the COR.
Figure 3. Access gate
Figure 3. Highwall warning sign
5.2.2 Once work begins the contractor is expected to be on the job site each day in which weather conditions are favorable, as determined by the POC and/or COR, until the job is complete.
5.2.3 Minor field fit adjustments may be needed to accommodate site specific needs. Any changes or adjustments must be submitted in writing to the COR, per section 3.2.4 of this contract.
6 Execution
6.1 Materials
6.1.1 Fencing
The fence posts to be used are 5-in x 3-in x 7-ft pressure treated yellow pine, flat-top split rail line with three (3) notches. The rails to be used are 4-in x 11-ft pressure treated yellow pine. Hot dipped galvanized or stainless-steel fasteners and fittings are acceptable for use with treated wood. Fence installation will also require gravel.
Flex fence non-electric rail wire constructed of 12.5 gauge high-tensile wire coated in polymer including specialized tensioners and brackets.
6.1.2 Gates
Four access gates will to be used. Gates shall be 10 ft. x 4 ft. 2 in. 6-rail powder-coated tube gates. Installation of gate shall include gate hinges, screw hooks, and locking mechanism hardware.
6.1.3 Signage
Eight (8) warning signs will be fabricated (Fig. 4). Materials shall include all hardware to attach to access gates.
Sign specifications are as follows:
Size: 12” x 18”
Color: Black on 3M reflective yellow background
Material: aluminum
Figure 1. Split rail fence
Figure 2. Example of wire fence rail
6.2 Fence installation
6.2.1 The contractor will plan and lay out the fence perimeter using batter boards and a string line, or other appropriate means.
6.2.2 The contractor will verify lay out with the POC or COR before installation.
6.2.3 Post holes may be dug with either a hole digger, auger, or power driven. The holes should be about a third as deep as the posts are tall plus 4 inches. The diameter of the holes should be three times the width of the post. The Contractor must ensure that the bottom rail will remain several inches above ground.
6.2.4 Each post hole will be filled with 3-inches to 4-inches of gravel down the base of the hole for proper drainage. The gravel will be tamped down using the bottom of the post or a tamper.
6.2.5 The posts shall be level and aligned so that the openings run in the right direction to meet up with the rails.
6.2.6 All excavated materials shall be retained and used to backfill post holes. Backfill the post holes with excavated materials and tamp down.
6.2.7 Once the posts are set, starting at the bottom, slide the rail into one post until it clears the adjacent post, then slide it into the adjacent post. Continue on until all of the rails are installed, making minor adjustments as needed. Then adjust each rail so that it overlaps both posts evenly.
6.2.8 Corner bracings shall be used where appropriate.
6.2.9 The flexible fence rail attaches directly to the end fence posts using specialized tensioner and termination brackets. The length of the high-tensile fence rail is held in place with custom line post brackets that allow the rail to slip freely. Flexible rail should be installed on a 4 in. to 6 in. wood line post and a 6 in. to 8 in. wood termination/end and corner post. Due to the nature of this high-tensile field fence, bracing of posts is recommended.
6.3 Signage installation
6.3.1 One sign shall be installed on each access gate using best fit measures with adequate hardware.
| 1 INTRODUCTION |
| 1.1 Location & Description of Park |
| 1.2 Background |
| 1.3 Site Visit |
| 2 SCOPE OF SERVICES |
| 3 PROJECT COORDINATION AND ORIENTATION |
| 3.1 Points of Contact |
| 3.2 Coordination |
| 3.2.1 The POC, or other park personnel as designated by the Superintendent, will coordinate work scheduling and project logistics. |
| 3.2.2 The COR will coordinate project start-up and provide oversight. |
| 3.2.3 The COR will be responsible for acting on behalf of the Contracting Officer on all matters of work within the scope of the contract. |
| 3.2.4 The contractor is responsible for notifying the COR in writing all work that is beyond or adjustments to the scope of the contract and include a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, ma... |
| Approval of changes in the work that might result in adjustments in cost to Government and/or Contract time, and the approval of payment requests are reserved for the Contracting Officer. The acceptance of any change affecting price, terms, or deliver... |
| Failure of the contractor to obtain the approval of the Contracting Officer for work beyond the scope of the contract will release the government from any obligation to pay for services claimed. |
| 4 GENERAL PROVISIONS |
| 4.1 PROFESSIONAL QUALIFICATIONS |
| 4.1.1 All workers shall, through related training and on-the-job experience, be familiar with the technical aspects and equipment used in the specifications stated herein. |
| 4.2 EQUIPMENT REQUIREMENTS |
| 4.2.1 All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed. |
| 4.3 SAFETY |
| 4.3.1 All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed. |
| 4.3.2 The Contractor shall provide, erect, and maintain all necessary barricades and traffic cones and sufficient site guards to insure the safe flow of pedestrian and vehicular away from the work area. |
| 4.3.3 Spill containment kits and fire extinguisher shall be on-site at all times. |
| 4.4 SUBMITTALS |
| 4.4.1 Contractor shall submit a Safety Plan that illustrates the location of the work site and locations of safety measures to keep visitors out of the work zone prior to commencement of work activities. The safety plan shall also include an emergency... |
| 4.5 WORK AREA & HEAVY EQUIPMENT |
| 4.5.1 Contractor shall confine the work, parking of vehicles, and all other operations in connection with this contract to the specified hours and work areas approved by the COR. Large equipment may be stored on-site as specified by the COR. |
| 4.5.2 The contractor shall not permit heavy equipment or vehicles off hard surface roads without the expressed permission of the COR. Protective matting shall be used to minimize damage to adjacent tree root zones and turf. All damage resulting from... |
| 4.5.3 All vehicles and equipment used must be free of visible mud and plant material to prevent the spread of invasive species into the park. Vehicles and equipment shall be cleaned and free of soil and plant material before entering the park. |
| 4.5.4 The contractor shall ensure that all refueling of equipment on site shall have spill containment pads in position prior to refueling activities. |
| 4.5.5 The entire park area is open to the public. |
| 4.6 RESPONSIBILITY REGARDING EXISTING STRUCTURES, UTILITIES, EXISTING PLANT MATERIAL AND OTHER LANDSCAPE FEATURES |
| 4.6.1 The contractor will be held responsible for any damages to, and for maintenance and protection of existing structures. Contractor shall patch, repair or replace portions of sidewalks, curbs, gutters, streets, manholes, and the like that are dam... |
| 4.6.2 The contractor will be held responsible for any damages to, and for maintenance and protection of existing utilities. The existence and location of underground utilities shall be investigated and verified in the field by the contractor before s... |
| 4.6.3 The contractor shall preserve and protect all existing vegetation such as trees, shrubs, and grass areas adjacent to installation of the fence which do not reasonably interfere with work. The contractor shall be responsible for all unauthorized ... |
| 4.6.4 The contractor shall use best management practices for soil conservation. The contractor shall be responsible for all unauthorized ground disturbance, including damage due to careless operation of equipment and stockpiling of materials. Material... |
| 4.7 RESOURCE PROTECTION |
| 4.7.1 In the event of the discovery of unanticipated cultural resources, work shall halt, and the COR and Park Technical Representative will be contacted. Work will not resume until the COR gives approval to resume. |
| 4.7.2 The contractor shall comply with the Migratory Bird Act of 1918. |
| 4.8 CLEANUP AND RESTORATION |
| 4.8.1 The contractor must furnish all labor, materials, and equipment for daily cleanup and restoration of all disturbed areas or features, which have been damaged during the course of this contract. |
| 4.8.2 All debris shall be removed from the job site on a daily basis. |
| 4.8.3 The contractor shall be responsible for restoring the project area and adjacent staging areas to the approximate original site conditions, including replanting of vegetation, soil and rock arrangement. |
| 4.8.4 Any materials such as gravel, soil, straw, and mulch must be weed/seed free. |
| 5 SCHEDULE |
| 5.1 SITE WALK-THROUGH |
| 5.2 On-Site work |
| 5.2.1 The contractor shall notify the COR and POC 48 hours prior to beginning any work. Work shall be performed between the hours of 8:00 a.m. and 4:00 p.m. Monday through Friday, Federal holidays excluded, unless authorized in writing by the COR. |
| 5.2.2 Once work begins the contractor is expected to be on the job site each day in which weather conditions are favorable, as determined by the POC and/or COR, until the job is complete. |
| 5.2.3 Minor field fit adjustments may be needed to accommodate site specific needs. Any changes or adjustments must be submitted in writing to the COR, per section 3.2.4 of this contract. |
| 6 Execution |
| 6.1 Materials |
| 6.1.1 Fencing |
| 6.1.2 Gates |
| 6.1.3 Signage |
| 6.2 Fence installation |
| 6.2.1 The contractor will plan and lay out the fence perimeter using batter boards and a string line, or other appropriate means. |
| 6.2.2 The contractor will verify lay out with the POC or COR before installation. |
| 6.2.3 Post holes may be dug with either a hole digger, auger, or power driven. The holes should be about a third as deep as the posts are tall plus 4 inches. The diameter of the holes should be three times the width of the post. The Contractor must en... |
| 6.2.4 Each post hole will be filled with 3-inches to 4-inches of gravel down the base of the hole for proper drainage. The gravel will be tamped down using the bottom of the post or a tamper. |
| 6.2.5 The posts shall be level and aligned so that the openings run in the right direction to meet up with the rails. |
| 6.2.6 All excavated materials shall be retained and used to backfill post holes. Backfill the post holes with excavated materials and tamp down. |
| 6.2.7 Once the posts are set, starting at the bottom, slide the rail into one post until it clears the adjacent post, then slide it into the adjacent post. Continue on until all of the rails are installed, making minor adjustments as needed. Then adju... |
| 6.2.8 Corner bracings shall be used where appropriate. |
| 6.2.9 The flexible fence rail attaches directly to the end fence posts using specialized tensioner and termination brackets. The length of the high-tensile fence rail is held in place with custom line post brackets that allow the rail to slip freely. ... |
| 6.3 Signage installation |
| 6.3.1 One sign shall be installed on each access gate using best fit measures with adequate hardware. |