Sol_140P4524R0021_Amd_0001.pdf

PDF 89 KB Posted

Attached to
GATE: PERFORM WATER INFILTRATION Federal contract opportunity
Solicitation number
140P4524R0021
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is an amendment to Solicitation 140P4524R0021 for the National Park Service (NPS) to perform water infiltration mitigation work at the historic Ryan Visitor Center in the Jamaica Bay Unit of Gateway National Recreation Area in Brooklyn, NY.

The amendment extends the offer closing date to Friday, August 16, 2024 at 2 PM EDT. It also provides responses to submitted questions, clarifying that there is no designated laydown area, no existing parapet flashing, and no specific manufacturing requirements for new cast stone or bricks beyond matching the existing materials. The amendment references a specification for stone flashing and sealant in the solicitation appendix, but does not provide a specification for the caulking sealant mentioned elsewhere in the scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to GATE: PERFORM WATER INFILTRATION, newest first.
File Type Posted
B08_References_Worksheet_(1)_(1).pdf PDF
FAR_52_204-24.docx DOCX document
A04_GATE_322282_CONSTRUCTION_SOW_4_11_2024.pdf PDF
Sol_140P4524R0021.pdf PDF
B03_WD_NY20240003.pdf PDF
B08_GATE_322282__Contract_Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4524R0021 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PNP

Staten Island NY 10305 210 New York Ave.

DOI, NPS, NER - NPNH

PNP

Staten Island NY 10305 Contracting Office 210 New York Ave.

NPS, NER - NPNH

08/13/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/15/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

140P4524R0021: PERFORM WATER INFILTRATION MITIGATION AT HISTORIC RYAN VISITOR CENTER, JAMAICA BAY UNIT, GATEWAY NATIONAL RECREATION AREA, BROOKLYN, NY

This solicitation is hereby issued for the following reasons:

1. To extend closing date to Friday, August 16, 2024 2PM EDT.

2. To respond to submitted questions.

Q1: Is there a designated lay-down area for staging materials, equipment, etc..?

A1: Laydown area will be determined during pre-construction meeting after award.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Roselyn Sessoms

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4524R0021/0001

Q2: Are there any existing water infiltration measures on the parapet (existing flashing)?

A2: No. In the areas of the parapet designated for flashing, there is not existing flashing.

See picture in section 3.D.

Q3: Are there any existing construction documents that can be provided?

A3: All available and pertinent existing construction information is shown in Scope of

Work.

Q4: Are there any manufacturing requirements for new cast stone elements or bricks aside from closely resembling existing in the event any existing materials become damaged during construction?

A4: No.

Q5: Is there a specification for the type of caulking to be used?

A5: Between the coping stones, stone flashing shall be installed. See section 3.F. The specification for stone flashing including sealant is in the appendix on pdf page 28. There is not a specification for the caulking sealant shown in section 4.E for the contract options.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .