Hot_work_permit_Glenmont_0001.pdf
PDF 74 KB Posted
- Attached to
- EDIS CONSERVE HIGH PRIORITY ART Federal contract opportunity
- Solicitation number
- 140P4524Q0040
About this file
The document provided is a Hot Work and Open Flame Request and Approval Form for Thomas Edison National Historical Park. It outlines the requirements and procedures for conducting hot work, such as soldering or welding, within the park. Key details include:
The form requires identifying the location and nature of the hot work, the name and signature of the worker(s) and fire watch person(s), and confirmation that various safety precautions have been taken. These include providing ventilation for smoke-producing operations, having appropriate fire extinguishers on hand, and temporarily disabling the fire suppression/detection system in the work area. The form must be approved by a National Park Service supervisor prior to commencing the hot work.
This form is associated with a federal contract opportunity from the Department of the Interior's National Park Service Northeast Region for EDIS CONSERVE HIGH PRIORITY ART, with solicitation number 140P4524Q0040. However, the provided document does not contain details about the specific products, services, pricing, or other requirements of that contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4524Q0040_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Hot_Work-Fire_Watch__0001.pdf | ||
| B08_Attachment_2_IPP__Terms___Conditions_Conserve_Art_EDIS.pdf | ||
| B08_Attachment_6_Price_Schedule_Conserve_Art_EDIS.pdf | ||
| B08_Attachment_5_Tech_Ques_Conserve_Art.pdf | ||
| B08_Attachment_1_SOW_Conserve_Art_EDIS.pdf | ||
| B08_Attachment_3_WD_2015-4211_Conserve_Art_EDIS.pdf | ||
| Sol_140P4524Q0040.pdf | ||
| B08_Attachment_4_PPQ_Conserve_Art_EDIS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thomas Edison National Historical Park
Hot Work and Open Flame
Request and Approval Form
Date: __________________ Time Of Work: ____________________________
Location and work to be done: ____________________________________________
Please supply the following:
Name of Solderer(s)/Welder(s)/Tack
Iron or Heat Gun User:
Signature
Name of Fire Watch Person (s) Signature o Fire watch person must remain within 6’ – 8’ of the hot work at all times o Fire watch to continue 60 minutes after flame is extinguished/equipment turned off
The following items have been completed:
_____ Pre-hot work/open flame assessment meeting completed
_____ Smoke producing operations identified and ventilation provided
_____ Fire retardant blankets and/or other agreed upon fire protection is in place
_____ At least two appropriate fire extinguishers are within six feet of hot work
_____ NPS has temporarily disabled fire suppression/detection system for requested area as determined by the CDSO/SFMO
Approved:
National Park Service (Supervisor) Contractor
Notes:
File details come from the government source that posted it. Updated .