B08_REVISED_Price_Schedule-STEA_Containers_0001.pdf
PDF 181 KB Posted
- Attached to
- EDIS-MORR NHP TRASH REMOVAL SERVICE Federal contract opportunity
- Solicitation number
- 140P4524Q0034
About this file
This document is a Contract Bid Schedule for a federal contract opportunity for trash/waste removal services at Edison National Historical Park (EDIS) in West Orange, NJ and Morristown National Historical Park (MORR) in Morristown, NJ.
The contract has a base period of performance from July 2024 through June 2025, with four one-year option periods. The contractor is required to provide two 5-yard slant-top covered dumpsters at the Jockey Hollow Maintenance Facility in Morristown, NJ and one 5-yard slant-top covered dumpster at the Thomas Edison National Historical Park staff lot in West Orange, NJ. The dumpsters are to be picked up and replaced approximately 52 times per year, with the container time on-site not being a billable expense. The contractor must also ensure the Morristown dumpsters have locking capability to prevent animal and bear disturbance. Pricing is required for the base period and each option period. There is also a separately priced line item for the period of July 1, 2029 through December 31, 2029.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4524Q0034_Amd_0002.pdf | ||
| Price_Schedule_revised2-STEA_Containers_0002.pdf | ||
| A04_MORR_EDIS_SOW_Trash_2_revised_0002.pdf | ||
| A04_REVISED_MORR_EDIS_SOW_Trash_0001.pdf | ||
| Sol_140P4524Q0034_Amd_0001.pdf | ||
| Sol_140P4524Q0034.pdf | ||
| Price_Schedule-STEA_Containers.pdf | ||
| Technical_Questionnaire.pdf | ||
| Past_Performance.pdf | ||
| B03_WD_2015-4211_ESSEX__MORRIS_CTY.pdf | ||
| A04_MORR_EDIS_SOW_Trash_(1)_doc_05-30-24.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDIS-MORR TRASH/WASTE REMOVAL SERVICE 140P4524Q0034
CONTRACT BID SCHEDULE
Containers and Disposal Request for FY2024-2029 (Base Bid), Option Period 1, Option Period 2, Option Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items for the bid item descriptions. NOT TO EXCEED (NTE)
Offerors Name:__________________________________________________________________ Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________ Offerors POC:__________________________________________________________________ Offerors Phone/Email:____________________________________________________________
BASE BID ITEM NO 10: July 2024 through June 30, 2025
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container. MORRISTOWN DUMPSTERS SHALL HAVE LOCKING CAPABILITY, TO
PREVENT ANIMALS AND BEAR DISTURBANCE/ACCESS
BASE BID ITEM NO 10: UNIT SUM $ _ _/Container/weekly x 2 EA x 52 pick-ups = $ _ _TOTAL BASE BID ITEM NO 20: July 2024 through June 30, 2025
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container.
BASE BID ITEM NO 20: UNIT SUM $ _ _/Containers/weekly x 1 EA x 52 pick-ups $________TOTAL
TOTAL BASE BID (FFP line Items 10 through 20) = $_______ __________
Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items
Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________
OPTION PERIOD 1 NO 30: July 1, 2025 through June 30, 2026
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container. MORRISTOWN DUMPSTERS SHALL HAVE LOCKING CAPABILITY, TO
PREVENT ANIMALS AND BEAR DISTURBANCE/ACCESS
OPTION PERIOD 1 NO 30: UNIT SUM $ ______/Container/weekly x 2 EA x 52 pick-ups = $ _
_TOTAL
OPTION PERIOD 1 NO 40: July 1, 2025 through June 30, 2026
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense.
OPTION PERIOD 1 NO 40: UNIT SUM $ _ _/Containers/weekly x 1 EA x 52 pick-ups
$___________TOTAL
TOTAL OPTION PERIOD 1 (FFP line Items 30 through 40) = $_________________
Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items
Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________
OPTION PERIOD 2 – BID ITEM NO 50: July, 2026 through June 30, 2027
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of
OPTION PERIOD 2 NO 50: UNIT SUM $ _ _/Container/weekly x 2 EA x 52 pick-ups =$ _ _TOTAL
OPTION PERIOD 2- BID ITEM NO 60: July, 2026 through June 30, 2027
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense.
OPTION PERIOD 2 NO 60: UNIT SUM $ _________/Container/weekly x 1 EA x 52 pick-ups
$__________TOTAL
TOTAL OPTION PERIOD 2 (FFP line Items 50 through 60) = $_________________
Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items
Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________
OPTION PERIOD 3 – BID ITEM NO 70: July 1, 2027 through June 30, 2028
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container. MORRISTOWN DUMPSTERS SHALL HAVE LOCKING CAPABILITY, TO PREVENT
ANIMALS AND BEAR DISTURBANCE/ACCESS
OPTION PERIOD 3 NO 70: UNIT SUM $ _ _/Container/weekly x 2 EA x 52 pick-ups =$ _ _TOTAL
OPTION PERIOD 3 - BID ITEM NO 80: July 1, 2027 through June 30, 2028
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense.
OPTION PERIOD 3 NO 80: UNIT SUM $ _________/Container/weekly x 1 EA x 52 pick-ups
TOTAL OPTION PERIOD 3 (FFP line Items 70 through 80) = $_________________
Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items
Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________
OPTION PERIOD 4 – BID ITEM NO 90: July 1, 2028 through June 30, 2029
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of
OPTION PERIOD 4 NO 90: UNIT SUM $ _ _/Container/weekly x 2 EA x 52 pick-ups =$ _ _TOTAL
OPTION PERIOD 4 - BID ITEM NO 100: July 1, 2028 through June 30, 2029
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense.
OPTION PERIOD 4 NO 100: UNIT SUM $ _________/Container/weekly x 1 EA x 52 pick-ups
TOTAL OPTION PERIOD 4 (FFP line Items 90 through 100) = $_________________
GRAND TOTAL: (LINE ITEMS 10 through 100) = $__________________
Period 3, and Option Period 4 Edison National Historical Park (EDIS), West Orange, NJ, and Morristown National Historical Park (MORR), Morristown, NJ Submit bids for all items: Failure to do so may render the bid non-responsive. Refer to definition of bid items
Offerors Address:________________________________________________________________ Offerors UEI/ DUNS:_____________________________________________________________
SEPARATELY PRICED LINE ITEM, IF NECESSARY, IN ACCORDANCE WITH FAR 52.217-8:
July 1, 2029 through December 31, 2029
Provide Two (2) 5-yard slant-top covered dumpsters placed at the Jockey Hollow Maintenance Facility, located at Tempe Wick Rd, Morristown, NJ, for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup.
Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container. MORRISTOWN DUMPSTERS SHALL HAVE LOCKING CAPABILITY, TO PREVENT
ANIMALS AND BEAR DISTURBANCE/ACCESS
SEPARATELY PRICED NO 110: UNIT SUM $ _ _/Container/weekly x 2 EA x 26 pick-ups =$ _
_TOTAL
SEPARATELY PRICED LINE ITEM, IF NECESSARY, IN ACCORDANCE WITH FAR 52.217-8:
July 1, 2029 through December 31, 2029
Provide One (1) 5-yard slant-top covered dumpsters placed at the Thomas Edison National Historical Park staff lot (rear towards tree line), located across from 211 Main Street West Orange, NJ 07052 for disposal of trash from offices, lunchrooms, and maintenance shop areas. Approximately fifty-two (52) pickup / replacements a year, one per week, to be billed per pickup. Container time on the Site is NOT a billable expense. This cost will include the delivery, usage, and pick-up of the container.
SEPARATELY PRICED NO 120: UNIT SUM $ _________/Container/weekly x 1 EA x 26 pick-ups =
SEPARATELY PRICED LINE ITEM (FFP line Items 110 through 120) = $_________________
File details come from the government source that posted it. Updated .