This is a Questions and Answers document for Solicitation 120P4226R0012 - Amendment 0003, a Request for Proposals for masonry rehabilitation work at Independence National Historical Park's Second Bank Block. Questions were received at the second site visit on June 11, 2026, with an extended technical questions deadline of June 15, 2026.
The document addresses six key clarifications regarding project scope and requirements. On-site parking is not available; vehicles may only load and unload materials. The project timeline is 365 days to complete after Notice to Proceed issuance, with the NTP start date based on actual mobilization after submittal approval. A partial NTP may be issued for the submittal process but will not count toward the 365-day period. Brick gutter repair, including storm drainage work, is a Base Bid Scope Item identified in the drawing set (Attachment 2 - INDE 308228 Second Bank Block CD Drawing Set 022625), not an optional item. The triangular planter is included under Division 1 - 01 27 00 - Section 3.1 (B) Optional 1 Repairs to Perimeter Walls on Subsheet A-4.4. Archeological monitoring is required due to the depth of helical piles under the Morris Statue and site wall pier off Walnut Street, per Division 1 - 01 35 13.22 - Archeological Protection specifications. Repointing and repairs to the short brick wall perpendicular to the Walnut Street exterior wall are included under the same optional perimeter walls section. Contractors must use Attachment 1 - Amend 0002 - Updated Schedule-SOW-T&C's to respond to requirements under L.2.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P4226R0006 – Amendment 0003
RFP
QUESTIONS & ANSWERS REGARDING:
SOLICITATION/REQUEST FOR PROPOSALS NO. 120P4226R0012 -
Amendment 0003
Independence National Historical Park (INDE) – Masonry Rehabilitation of Second Bank Block
QUESTIONS RECEIVED AT 2nd SITE VISIT June 11, 2026 (No questions were received prior to this and no additional Questions were received by the extended technical questions date of June 15, 2026):
1. Question: Is there any parking?
ANSWER: Unfortunately, there is no on-site parking for this project. Vehicles can use the site to load and unload materials for construction, but cannot park on-site, contractor shall also reference Section C.17 (2) -
Parking as the limitations are stated there, as well as Access.
2. Question: What is the timeline of the project?
ANSWER: The goal is to have this project awarded this fiscal year and have a full year (365 days) to complete the project, after the Notice to Proceed as stated in Block 11 of the SF-1442. As stated in C.4 -
Period of Performance - "The Period of Performance is 365 days after issuance of full Not-to-Proceed (NTP).
The full NTP start date is based on actual mobilization date which will be established after submittals are approved. A partial NTP may be issued at the request of the COR and/or Contractor for the submittal process after award but will not count towards the 365 days for the full NTP. If not requested, contractor shall assume submittal process begins immediately after award."
3. Question: Is the gutter repair part of the base or the options?
ANSWER: The brick gutter repair a Base Bid Scope Item, NOT an Optional Item, which includes Storm
Drainage, and the gutter is considered drainage. Also reference Attachment 2 – INDE 308228 Second Bank
Block CD Drawing Set 022625, specifically under Subsheet - A-3.0 references to “rebuild brick gutter”, Subsheet - A-3.1 were the Brick and Gutter Detail is provided and A-2.0 (D10) references “remove and rebuild section brick gutter” for more specific information. All the Optional Items are identified on Subsheets
A-4.0 through A-4.7 respectively. Contractors shall also follow Division 1 – 024119 – 3.5 – Selective
Demolition Procedures for Specific Materials and the guidance in Division 1 – 321400 – Unit Paving (Brick) in terms of matching existing brick.
4.Question: The triangle planting bed looks similar to the low brick walls around the site, but is not included in the same option?
ANSWER: The triangular planter is not considered a historic building marker, it is included under Division
1 – 01 27 00 – Section 3,1 (B) Optional 1 Repairs to perimeter walls and is also identified in Attachment 2 –
INDE 308228 Second Bank Block CD Drawing Set 022625, specially Subsheet A-4.4 – Option #1 – Planter
Site Walls.
5. Question: Is monitoring required?
ANSWER: Yes, due to the depth of the helical piles under the Morris Statue and site wall pier off Walnut
Street that is needed - archeological monitoring will be required. The contractor shall adhere to Attachment 1
Solicitation 140P4226R0006 – Amendment 0003
RFP
- INDE 308228 Specifications, specifically Division 1 - 01 35 13.22 - Archeological Protection - Sections -
1.4 Quality Assurance, 3.3 - Observation and 3.4 - Discovery of Resources
6. Question: Is the short brick wall off the exterior site wall off of Walnut included?
ANSWER: Yes, repointing/repairs to the short brick wall perpendicular to the Walnut Street exterior wall off the Morris Plaza is included in Division 1 – 01 27 00 – Section 3.1 (B) Option 1 Repairs to perimeter walls.
Contractors are reminded to use Attachment 1 – Amend 0002 – Updated Schedule-SOW-T&C’s included with Amendment 0002 to respond to the requirements under L.2 as the updated provisions are included in this version.