Attachment_5_Revised_Statement_of_Need_0001.docx
DOCX document 26 KB Posted
- Attached to
- SHEN - GRAVEL FOR EMERGENCY ROAD REPAIRS
- Solicitation number
- 140P4224Q0124
About this file
This document is a Statement of Need for a federal contract opportunity to provide 1,600 tons of 21A crusher run stone to Shenandoah National Park in Virginia. The Contractor shall deliver and stockpile the material in the Big Meadows area of the park, coordinating the delivery with the NPS Technical Representative, Tim Heiston. The delivery location is accessible via the Swift Run entrance off Highway 33. The contract requires the Contractor to provide all management, labor, and equipment necessary to complete the delivery by September 30, 2024. The related federal contract opportunity, Solicitation Number 140P4224Q0124, is for the National Park Service Northeast Region to procure this gravel for emergency road repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4224Q0124_Amd_0001.pdf | ||
| Attachment_3_SHEN_Park_Map.pdf | ||
| Sol_140P4224Q0124.pdf | ||
| Attachment_2_Rapidan_Fire_Road_Map.pdf | ||
| Attachment_4_Price_Schedule.docx | DOCX document | |
| Attachment_1_Statement_of_Need.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shenandoah National Park Gravel Statement of Need
SCOPE OF WORK:
The Contractor shall provide all management, supervision, labor, material, supplies, and equipment and shall plan, schedule, coordinate, and assure effective performance of all services described herein.
The Contractor shall provide 1,600 tons of 21A crusher run to Shenandoah National Park and stockpile the material in the storage area near Big Meadows, indicated on the attached map. The contractor shall coordinate the delivery of the material with the park’s technical representative listed in this document.
LOCATION ADDRESS:
Shenandoah National Park 3655 U.S. Highway 211 East Luray, VA 22835
The delivery location will be in the Big Meadows area of Shenandoah National Park at Mile Post #51. The contractor will coordinate delivery with the technical representative to access the Rapidan Fire Road and deliver the material to the stockpile area. Access to the park will be the Swift Run entrance off Highway 33. (See attached Park map) The contractor will inform the entrance station staff that the delivery is for the technical representative listed in this document.
TECHNICAL REPRESENTATIVE:
Tim Heiston Tim_Heiston@nps.gov 540-999-3500, ext. 3253
DESCRIPTION OF SUPPLIES:
-One thousand, six hundred tons of grade 21A, Crusher Run stone
Service shall include the complete delivery of the above listed materials, within the timeline identified in the contracting document.
The Contractor shall provide weight tickets that include the weight and description of material for each load delivered.
36 CFR §4.21 – SPEED LIMITS
(b) The following speed limits are established for the routes/roads indicated:
•Skyline Drive: 35 miles per hour •All campgrounds and associated roads: 10 miles per hour •All Picnic areas and associated roads: 15 miles per hour •Big Meadows Access Roads from the Skyline Drive to the entrances to the campground and lodge facilities: 25 miles per hour •All administrative use roads: 20 miles per hour •Skyland access road: 20 miles per hour •On the Skyline Drive from 0.2 miles north of the Loft Mountain Wayside to 0.1 miles south of that facility: 25 miles per hour •On the Skyline Drive from mile 50.5, 0.2 miles north of the Byrd Visitor Center to mile 51.4, 0.2 miles south of the Rapidan access road: 25 miles per hour •On the Skyline Drive 0.2 miles north of the north entrance to Elkwallow Wayside to the south exit of Elkwallow Picnic area: 25 miles per hour.
•Access road to the Loft Mountain Campground from the Skyline Drive: 25 miles per hour •On the Skyline Drive from 0.1 miles North of the Rockfish Gap Entrance Station to 0.1 miles South of that facility: 20 miles per hour
DELIVERY
As soon as possible but no later than September 30, 2024
File details come from the government source that posted it. Updated .