This document is a Questions and Answers (Q&A) sheet related to a federal contract opportunity for the disposal of solid waste - recyclable, trash, and construction and demolition (C&D) at Valley Forge National Historic Park and Hopewell Furnace National Historic Site.

The key details from the Q&A sheet are:

  • The solicitation is for FY24 and the opportunity type is a Solicitation.
  • The scope includes disposal of trash, recycling, and C&D waste at the two national park sites.
  • The government provided estimated quantity ranges for the various waste streams, noting the quantities could be exceeded due to events at the parks.
  • The government was unable to quantify the amount of glass waste produced.
  • For environmental reasons, the parks use limited aerosol products and do not puncture the cans.
  • The current contractor is Dibussolo, and the scope of work is the same as the previous contract.
  • All questions must be submitted by March 22, 2024 at 12:00 PM ET on the attached Q&A document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions & Answers Document
#Contractor QuestionReferenceGovernment ResponseReference
1Can you provide breakdown of the tonnage per waste stream as listed in paragraph 1 section A?SOW 1.0 A pg1 BackgroundDue to the varying nature of the quantities, providing an accurate tonnage per stream would only be an average at best. The following are ranges that were seen over a 6 month period: Trash: 1-3 tons, Recycling 1-2 tons, Construction 1-5 tons. This is a limited window and these quantities could be exceeded due to an event at the park.
2Can you provide a breakdown of the tonnage per waste stream as listed in paragraph 1 section B?SOW 1.0 B pg1 BackgroundDue to the varying nature of the quantities, providing an accurate tonnage per stream would only be an average at best. The following are ranges that were seen over a 6 month period: Trash: 1-3 tons, Recycling 1-2 tons, Construction 1-5 tons. This is a limited window and these quantities could be exceeded due to an event at the park.
3How much glass is produced?SOW 2.0 pg 4 ScopeUnable to quantify
4Are the aresol cans punctured and drained of the residue prior to being placed in the recycle container?SOW 2.0 pg 4 ScopeFor environmental reasons we use very limited aerosol products and it is not typical that we puncture the cans
5Who currently holds the contract for this work?Dibussolo
6Is the scope of work for this solicitaiton the same as the previous or are there additions/deletions/changes?Same as previous
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

File details come from the government source that posted it. Updated .