Questions and Answers_0001.pdf
PDF 119 KB Posted
- Attached to
- HOFU Boarding House Roof and Window Replacement
- Solicitation number
- 140P4220R0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hofu Roof and Windows- sign in sheet_0001.pdf | ||
| Sol_140P4220R0046_Amd_0001.pdf | ||
| References Worksheet.doc | DOC document | |
| Boarding House SOW Rev.1.docx | DOCX document | |
| PAYMENT BOND SF25A-16d.pdf | ||
| Form A.docx | DOCX document | |
| Sol_140P4220R0046.pdf | ||
| Form B.docx | DOCX document | |
| Wage Determination 7-24-20 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Document No.
140P4220R0046
Document Title HOFU Boarding House Roof and Window Replacement
Questions and Answers
Q1. Pulleys and ropes are specified for the window sashes but the sash appear never to have been balanced on ropes & pulleys. If this is a restoration, are ropes and pulleys required?
A1. Any windows, that do not have pulleys and ropes, will not require the addition of pulleys and ropes. Additionally, weather stripping will only be used to replace any existing weather stripping. No new weather stripping will be added.
Q2. Are shop drawings required to be submitted in Autocad?
A2. Hand drawn sketches will not be acceptable as shop drawings. AutoCAD is the preferred format, but similar programs will be acceptable.
File details come from the government source that posted it. Updated .