A06_SHEN_Restriping_Scope_of_Work_FINAL.pdf

PDF 3 MB Posted

Attached to
Road Re-striping: Shenandoah National Park, VA Mile posts 31-105
Solicitation number
140P4218R0018
Issued by

About this file

SHEN Restriping Scope of Work/Project Manual

View the file

Other files

File Type Posted
B03_Wage_Determination_VA138.txt TXT text file
B03_Wage_Determination_VA137.txt TXT text file
A06_SHEN_Restriping_Location_Maps_2.pdf PDF
Sol_140P4218R0018.pdf PDF
Form_B_Past_Performance_Questionnaire.doc DOC document
B03_Wage_Determnation_VA128.txt TXT text file
A06_SHEN_Restriping_Location_Maps.pdf PDF
FORM_A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I GENERAL

I .I DESCRIPTION

A. CONSTRUCTION

SECTION 01110

SUMMARY OF WORK

Striping (restriping I re-marking) of the areas as designated in the project bid and approved. Work scope includes, but not limited to stripping.

I .2 LOCATION

A. Skyline Drive Mile Post 31.5 through Mile Post 105.9 plus identified roads and parking areas in the Central District. Skyline Drive w01k excludes the respective adjacent overlooks and separate parking lots unless identified otherwise in the Central district

B. Work areas:

I. Restripe:

a. Skyline Drive (Epoxy with glass beads) Milepost 31.5 to Milepost 105.9 excluding adjoining overlooks & parking lots unless identified otherwise in the Central District. Central District is area between US Highway 211 and US Highway 33.

b. Central District identified roads beyond Skyline Drive and parking areas ( epoxy with glass beads) as follows:

I) Pinnacles Picnic Area Road (Route 530, FMSS 32445)

2) Pinnacles Parking Area A (Route 973A, FMSS 104331)

3) Pinnacles Parking Area B (Route 973B, FMSS 104332)

4) Pinnacles Parking Area C (Route 973C, FMS I 04333)

5) Pinnacles Parking Area D (Route 973D, FMSS 104334)

6) Upper Hawksbill Parking Area (Route 923, FMSS 56377)

7) Dark Hollow Falls Parking Area (Route I 035, FMSS 56454)

8) Rapidan Road Parking Area (Route 927, FMSS 56379)

9) Milan Gap Parking Area (Route 929, FMSS 56382)

10) Lewis Mountain Entrance Road (Route 39, FMSS 00002324)

I !)Lewis Mountain Picnic Ground Road (Route 535, FMSS 32479)

12) Lewis Mountain Parking Area (Route 933, FMSS 50439)

13) Lewis Mountain Campground Loop A (Route 534A, FMSS 50459)

SHEN-160833 160839 174037 175274 01110-1

SUMMARY OF WORK

14) Lewis Mountain Campground Loop B (Route 534B, FMSS 103796)

15) Lewis Mountain Campground Loop C (Route 534C, FMSS l 03799)

16) South River Picnic Ground Road (Route 536, FMSS 32479)

17) South River Picnic Parking Area A (Route 959A, FMSS 104476)

18) South River Picnic Parking Area B (Route 959B, FMSS 104478)

19) South River Picnic Parking Area C (Route 959C, FMSS 104479)

20) South River Picnic Parking Area D (Route 959D, FMSS I 04480)

C. As a clarification, work interfaces at Thornton Gap and Swift Run Gap interchanges shall begin/end at the respective entrance ramps interfaces to the respective Skyline Drive edge stripe plane. Note: The respective acceleration & deceleration lanes and immediate-adjacent to Skyline Drive hard surface areas are included within the work scope.

D. As a clarification, work interface at mile 105.9 interchange shall begin/end at the north edge of the bridge overpass of Interstate 64 of Skyline Drive. Note: The respective immediate-adjacent hard surface areas, pull offs, parking areas, acceleration & deceleration lanes associated with Rockfish Gap Entrance Station are included within the work scope.

E. As a clarification, all areas to be restriped are to be thoroughly vacuumed, cleaned, and rid of any and all loose materials and/or debris from all surfaces to be restriped, just prior to applying the respective new restripe materials. Said areas are subject to inspection and approval by the Contracting Officer immediately prior to the new materials application. All vacuumed and/or sweep spoils and/or loose materials are to be disposed of legally outside of the park by the contractor.

F. As a clarification, any respective hard surface areas, acceleration & deceleration lanes along, adjacent to, or within the specific work scope areas are included within the respective work scope. Overlooks and !railhead parking lots are excluded from the work scope except the identified Central District roads and parking areas.

G. Epoxy paint with glass beads for all roadmarkings. Epoxy paint with glass beads are to be utilized for all the respective road markings as within the respective milepostsand designated areas.

H. As a clarification, the work scope includes all respective traffic markings inclusive of all traffic stripping & traffic/parking symbols, directional markings,pedestrian crossings, horse crossings, and other painted permanent traffic control markings and hatchings.

1.3 CONTRACTOR'S USE OF PREMISES

A. Construction Camp: Establishment of a camp within the park will notbe permitted.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

Temporary traffic lane closures will be permitted, when required. At least one lane of traffic shall be kept open except for short periods of time required for construction zone management, and upon specific approval of the Contracting Officer. During the restripe process, Shenandoah National Park may entertain "training" as long as traffic will not be delayed for more than 5 minutes andupon specific approval of the

Contracting Officer.

C. Confine storage of materials and construction related equipment may be arranged on a temporary bases at the Swift Run maintenance area (accessed from US Highway Route 33) and/or Wildcat Ridge "bone yard"

SHEN-160833 160839 174037 175274 01110-2

SUMMARY OF WORK

PART I GENERAL

I . I DESCRIPTION

SECTION 01270

DEFINITION OF BID ITEMS

A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another regins.

B. If no bid item exists for a portion of the work, include the costs in a related bid item.

I .2 BID ITEM NO. I - Restripe Skyline Drive from Milepost31.5 to Milepost 65 excluding the adjacent overlooks and parking lots.

A. This bid item consists of all work from Milepost 31.5 to Milepost 65.

B. Payment to be made @ contract lump sum price.

I .3 BID ITEM NO. _2 _ _ -_ Restripe Skyline Drive from Milepost 65 to Milepost 85 excluding the adjacent overlooks and parking lots.

A. This bid item consists of all work from Milepost 65 to Milepost 85.

B. Payment to be made @ contract lump sum price.

I .4 BID ITEM NO. _3 _ _ -_ Restripe Skyline Drive from Milepost 85 to Milepost 105.9 excluding the adjacent overlooks and parking lots.

A. This bid item consists of all work from Milepost 85 to Milepost J 05 .9.

B. Payment to be made @ contract lump sum price.

I .5 BID ITEM NO. _4 __ -_Restripe identified Central District roads and parking areas.

A. This bid item consists of all preparation, layout, etc., for re-marking of access roads, parking spaces, directional arrows, hatched areas, handicap symbols, edge lines,center lines, stop lines, etc., with epoxy paint w/ glass beads up to the adjacent Skyline Drive fog edge line plane for the following:

1) Pinnacles Picnic Area Road (Route 530, FMSS 32445)

2) Pinnacles Parking Area A (Route 973A, FMSS I 04331)

3) Pinnacles Parking Area B (Route 973B, FMSS 104332)

4) Pinnacles Parking Area C (Route 973C, FMS 104333)

5) Pinnacles Parking Area D (Route 973D, FMSS I 04334)

6) Upper Hawksbill Parking Area(Route 923, FMSS 56377)

7) Dark Hollow Falls Parking Area (Route 1035, FMSS 56454)

8) Rapidan Road Parking Area (Route 927, FMSS 56379)

SHEN-160833 160839 174037 175274 01270-1

DEFINITION OF BID ITEMS

File details come from the government source that posted it.