A04_Statement_of_Work.docx
DOCX document 15 KB Posted
- Solicitation number
- 140P3019R0026
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Combined_Synopsis_Solicitation.docx | DOCX document | |
| B03_DOL_WD_15-4281_Rev_14_Jul_16_2019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Park Police / Horse Mounted Patrol Unit
Statement of Work: Manure Removal Dated: Jul 2019
Introduction The U.S. Park Police maintains a series of five (5) stables and approximately 30-35 horses in the Washington Metropolitan Area (WMA). These stables require the periodic delivery of empty and removal of full manure dumpsters.
Historical Usage In F.Y. 2018, there were 121 manure dumpster removals.
In F.Y. 2017, there were 122 manure dumpster removals.
In F.Y. 2016, there were 73 manure dumpster removals.
In F.Y. 2015, there were 74 manure dumpster removals.
In F.Y. 2015 and 2016, manure removal service was only provided at three (3) stable sites. In F.Y. 2017 and F.Y. 2018, manure removal service was provided at four (4) stable sites. For the new contract period, manure removal service shall be provided at five (5) USPP stables.
Scope of Work The contractor will provide two (2) 20 cubic yard dumpsters; one dumpster per stable site to be used for the receipt of manure at Edgewater Stable and Rock Creek Stable. The contractor will provide three (3) 30 cubic yard dumpsters; one dumpster per stable site to be used for the receipt of manure at the Central Stable, Fort Hunt Stable and Fort Dupont Stable. At these sites, the contractor shall place an empty dumpster upon removal of a full dumpster.
When requested, delivery and removal must be made year round with a three (3) business day turn-around from the date of call to the date of service. Deliveries should be made between the hours of 6 AM and 2 PM.
The contractor must deliver to the five (5) U.S. Park Police stables in the WMA. These stables are accessible by restricted federal highways. Drivers must be knowledgeable of the roadways and applicable restrictions. Drivers will maintain current CDL certifications, if required.
The stable addresses and dumpster delivery sites:
1) Edgewater Stable - 2400 Beach Drive NW Washington, DC. In Rock Creek Park, at the intersection of Beach Drive and Rock Creek Parkway, underneath Connecticut Ave (Taft Bridge). One 20 cubic yard dumpster placed on the East side of the stable parallel to the concrete ramp and elevated concrete walkway.
2) Central Stable (H1) – 2001 Independence Ave SW Washington, DC. On the Independence Ave side of the Lincoln Memorial Reflecting Pool, Between 17th St (WWII Memorial) and 23rd St. (Lincoln Memorial). Entrance to the stable is through the WWII Memorial parking lot. One (1) 30 cubic yard dumpster placed inside the fenced perimeter of the Central Stables, between and parallel to the north side fence line and the northern horse stalls.
3) Fort Hunt Stable (H2) – 8999 Fort Hunt Rd. Alexandria, VA 22308. In Fort Hunt Park, George Washington Memorial Parkway. One (1) 30 cubic yard dumpster placed on the far west side of the gravel parking area, parallel to the west side of the U.S. Park Police office trailer.
4) Rock Creek Stable (H3) – 2500 Horse Stable Rd. NW Washington DC. In Rock Creek Park at the intersection of Oregon Ave and North Hampton St. NW. One (1) 20 cubic yard dumpster placed parallel to the north side of the stable, west of the breezeway.
5) Fort Dupont Stable (H5) – 3600 F St. SE Washington DC 20019. In Fort Dupont Park, the entrance off of Minnesota Avenue SE at F Street. SE. One (1) 30 cubic yard dumpster placed on the east side of the paddock, south of the sawdust lean-to.
Indemnity of the Government The Contractor is not an employee of the U.S. Park Police or the National Park Service. The Contractor will indemnify and hold the U.S. Park Police harmless from any expense, including attorney’s fees and also claims on account of damage to property or bodily injury (including death) which may be sustained by him/herself or his/her employees in connection with any and all work performed.
Payment The Contractor will be required to submit an invoice at the end of each month for services rendered. All services rendered for that month, must be listed on the invoice. A copy of the invoice will be prepared by the Contractor and be submitted to the Contracting Officer’s Representative (COR) who will confirm work completed. This billing will include the location, date services rendered; specific services rendered and fee for each service. The fees will be in accordance with the fee schedule attached. Payment for services rendered will be facilitated through the Invoice Payment Platform.
--End of Statement of Work--
File details come from the government source that posted it.