This document is a Scope of Work (SOW) for fabricating a granite capstone for the Albert Pike Memorial in Washington, DC. The National Park Service requires a Milford Pink Granite block measuring 64" x 18" x 64" to replace a capstone damaged during 2020 protests. The contractor must dimensionally cut and dress the stone with specific requirements including a smooth tooled finish, precise dimensional tolerances within 1/8", light eased edges, and a sample mock-up for government approval.

The project is solicited by the Department of the Interior National Park Service under Solicitation Number 140P2125Q0156. The contractor is responsible for fabricating the capstone, arranging transportation to the Brentwood Maintenance Facility in Washington, DC, and delivering the stone between Monday-Thursday, 9 am - 4 pm. The project must be completed and delivered by October 15, 2025, with Brian Griffin serving as the Contracting Officer's Representative. The contractor must provide lifting devices and take precautions to prevent damage during transit.

View the file

Other files

File Type Posted
Sol_140P2125Q0156_Amd_0005.pdf PDF
Sol_140P2125Q0156_Amd_0004.pdf PDF
Attachment_4_-_Vendor_Info_Sheet_0003.docx DOCX document
Attachment_2_-_PIKE_CAPSTONE_0003.pdf PDF
Sol_140P2125Q0156_Amd_0003.pdf PDF
Attachment_1_-_New_Template_0003.zip ZIP file
Sol_140P2125Q0156_Amd_0002.pdf PDF
IMG_2453_0001.jpg JPG image
IMG_1647_0001.JPG JPG image
IMG_1654_0001.JPG JPG image
Sol_140P2125Q0156_Amd_0001.pdf PDF
IMG_1648_0001.JPG JPG image
IMG_1652_0001.JPG JPG image
IMG_1651_0001.JPG JPG image
RFI_s_Answers_0001.docx DOCX document
IMG_2452_0001.jpg JPG image
IMG_1646_0001.JPG JPG image
Sol_140P2125Q0156.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

HISTORIC PRESERVATION TRAINING CENTER

1.

BACKGROUND

This is a portion of a larger project to have a capstone fabricated to meet the specification and requirements to be used as a capstone pedestal for the reinstallation of the Albert Pike Memorial by Gaetano Trentanove and dedicated on October 23, 1901. The granite capstone will be installed by the National Park Service (NPS) in the original location at the corner of 3rd and D Streets, NW, Washington, DC.

The original capstone was damaged beyond repair during the 2020 protests when the bronze statue and stone pedestal were toppled from the memorial. The capstone is currently located on NPS Property in Frederick, MD. Shop drawings of the dimensions and detailing of the existing capstone will be provided to the contractor.

2.

STATEMENT OF WORK

Independently and not as an agent of the Government the Contractor shall provide all labor, facilities, equipment and transportation necessary to dimensionally cut and dress a Milford Pink Granite block or approved equal. The overall dimensions are 64” x 18” x 64.” The fabrication shall match the size specifications and profile of the existing original capstone.

The Contractor shall dimensionally cut and dress the stone pedestal in accordance with the following specifications:

A. Finish shall be a smooth tooled finish.

B. Sample mock-up (1’ x 1’) of stone is required for government approval prior to commencing with fabrication. Sample shall match the coloration, veining, and inclusions of the original stone.

C. Dimensional tolerances shall be within 1/8” on all sides and surfaces as inspected with a 4’ measure in any direction.

D. Naturally occurring imperfections or inclusions shall be no more than one square inch in size on all sawn and finished surfaces.

E. The Contractor shall verify measurements, using the supplied shop drawings.

F. The Contractor shall provide light eased edges.

G. Moldings, washes and drips shall be constant in profile throughout their length, in strict conformity with the details shown in photographs and in the supplied shop drawings for reference.

H. Top anchor holes to be verified with NPS prior to being drilled.

I. The Contractor is responsible for arranging the transport of the newly fabricated capstone to the job site in Washington, DC.

J. The Contractor shall provide an overhead lifting device or rigging for the purpose of offloading the finished pedestal at the delivery site. Lewis pins, center point lifting clamp dimples, or similar shall be installed by the Contractor prior to delivery and shall be capable of meeting the weight requirements of the stone.

3.

TIME FOR COMPLETION – All work shall be completed and delivered on or before October 15, 2025.

4.

DELIVERY

The finished granite capstone shall be packed and loaded for shipment using customary precautions against damage in transit. No material which may cause staining, or discoloration shall be used for blocking or packing. The Contractor shall provide the COR with an emailed 24-hour advance notice prior to the completed Capstone being shipped and delivery shall be between Monday- Thursday, 9 am – 4 pm.

Delivery shall be made to:

National Park Service/National Mall and Memorial Parks Brentwood Maintenance Facility 515 New York Avenue, NE

Washington, DC 20242

5.

CONTRACTING OFFICERS REPRESENTATIVE - For the purpose of this order Brian Griffin, Monuments Supervisory Exhibits Specialist, (240) 397-1617.