This document is a Blank Price Schedule for the project to Replace the Wheelchair Lift at Chief Factor's House at the Fort Vancouver National Historic Site in Vancouver, WA. The Solicitation Number is 140P2124Q0151 and the work is being procured by the National Park Service, a civilian agency of the Department of the Interior.
The Price Schedule outlines the required work, which includes demolishing the existing lift and components, performing necessary grading and structural work, installing the new accessible lift, and constructing an accessible pathway. Specific line items detail the required scope, such as electrical work, painting, and fencing. The total amount field is left blank, indicating this is a template for offerors to provide their proposed pricing. No other details about the procurement, such as response dates, award information, or set-asides, are provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLANK SHEET
Price Schedule
Project: FOVA Replace Wheelchair Lift at Chief Factor's House
Solicitation No.:
Work Item: Replace Wheelchair Lift at Chief Factor's House
| Cost Breakdown | |||
| Quantity | Description | Unit Price | Amount |
| Demolish Existing Accessible Lift and Components | |||
| 1 | Remove and Dispose of Existing Lift | ||
| 1 | Remove and Dispose of Lift foundation, footing and curb | ||
| 1 | Remove and Dispose of electrical components to existing panel. Retain existing shut-off panel, outlets for reinstallation. Retain existing conduit from shut-off panel to main panel in basement. | ||
| 1 | Selective removal of stabilized decomposed granite pathway | ||
| ` | |||
| Grading and Structural for Accessible Lift | |||
| 1 | Grading/Earthwork including base material/compaction | ||
| 1 | Formwork, rebar, and concrete for new lift |
| Install Accessible Lift | |
| 1 | Strip loose paint from east porch skirt, prime, and repaint |
| 1 | Install Electrical wiring from existing main panel to accessible lift. Reconnect shut-off panel/outlets, install new conduit from shut-off panel to lift. |
| 1 | Install Accessible Lift and complete all connections |
| 1 | Test all electrical components/controls. |
| 1 | Alterations to porch gate, and install new wood fencing including primer/paint |
| Accessible Path of Travel | |
| 1 | Excavate and dispose of soil including grading and compaction of base material |
| 1 | Formwork, and reinforced integrally dyed concrete Accessible pathway |
TOTAL AMOUNT $0.00