Sol_140P2124Q0133_Amd_0001.pdf
PDF 134 KB Posted
- Attached to
- Western Red Cedar Shakes
- Solicitation number
- 140P2124Q0133
About this file
This document is an amendment to a solicitation for Western Red Cedar Shakes for the Jewel Cave National Historic Site, issued by the Department of the Interior National Park Service. The amendment provides responses to requests for information, including confirmation of the required shingle thickness (5/8"), clarification that the shingles are Certi-sawn, not Certi-grade, and that the proper terminology is "taper-sawn shakes" rather than "shingles." The amendment also confirms that the site has a bobcat with forks instead of a forklift, and that 18-wheeler delivery is possible, either to the maintenance shop or visitor center. The solicitation number is 140P2124Q0133, and the due date remains unchanged at May 29, 2024, 12:00 CST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2124Q0133.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2124Q0133 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WA2
Frederick MD 21704 4801A Urbana Pike DOI, NPS, Historic Pres Trng Ctr
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
05/20/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/06/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to issue answers for RFI's received. The solicitation due date remains unchanged as 29 May 2024 at 1200 CST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Brian Thornton
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Request for Information/Questions for 140P2124Q0133
1. Regarding the butt thickness of the shingles, they come in 5/8" or the heavier 3/4". There is no mixing of the two. Confirm which to purchase. Please purchase 5/8 thickness.
2. The 24" taper-sawn shingles in 5 bundles per square are branded as Certi-sawn, not Certi-grade. Confirm agreement. Certi_sawn
3. The proper terminology is 24" taper-sawn shakes, not shingles. Please confirm. 24" taper-sawn shakes
4. Can you please verify if the Jewel Cave site has a forklift? Jewel cave does not have a fork lift, but has a bobcat with forks that can lift pallets off of the truck.
5. Can an 18 wheeler access the drop site? Yes, they get deliveries at the maintenance shop all the time. They can also take deliveries at the Visitor center if need be.
6. Can an 18 wheeler with liftgate deliver within the 100' guideline or will a lull or forklift be required? Yes, but if the driver is uncomfortable getting into the maintenance yard they can unload him at the visitor center.